679
|
Saturday, November 23, 2024, 11:11 |
Darwin Ortiz Rosales | ZrC | | LP TUBE | Done | ZrC 24E9T1 + std conditioning and sintering | Saturday, November 23, 2024, 11:08
No milling ZrC material sintering
inside graphite cartridge |
|
147
|
Friday, August 01, 2014, 11:47 |
Peter Kunz | | 40282-3 | LP-SIS | In progress | ZrC #6 conditioning | The maximum current of 580A was reached
at 9:15.
TGHT:RDCUR 578 A |
|
148
|
Friday, August 01, 2014, 13:27 |
Peter Kunz | | 40282-3 | LP-SIS | In progress | ZrC #6 conditioning | Target was conditioned for 4 hours at 580A.
Initiating ramp-down sequence @ 2A/min
|
|
149
|
Tuesday, August 05, 2014, 12:01 |
Laura Lambert | | 40282-3 | LP-SIS | Done | ZrC #6 conditioning |
|
|
385
|
Tuesday, August 08, 2017, 15:00 |
Laura Lambert | Empty | | | Problems resolved | Wiring in PLC replaced re: IGP1 mis-communicating | Tuesday, August 08, 2017, 14:57
See elog i.d's #384 and #381
Investigated wiring in PLC. |
|
387
|
Tuesday, September 12, 2017, 13:08 |
Aaron Schmidt | | | | | Window shutter added | Tuesday, September 12, 2017, 12:00:
The coated back window was changed
to a shuttered window. |
|
472
|
Tuesday, November 26, 2019, 15:43 |
Anders Mjos | SiC | 42464-3 | HP-FEBIAD | Problems resolved | Water to vacuum leak on heat shield line | This morning, the vacuum responded to shutting
of the water of the heat shield circuit (leak
rate without pumping leveling out). The vacuum |
|
378
|
Monday, July 10, 2017, 17:36 |
John Wong | np-SiC | | TARGET BOAT | Problems | Water Sensor Problem, TGHT Tripped. (np-SiC fibrous Pellet: Applied pressure vs Density) | Monday, July 10, 2017, 17:28
Two np-SiC fibrous pellets with different
applied pressure: |
|
292
|
Tuesday, May 03, 2016, 14:44 |
Laura Lambert | | | | | VACUUM PUMP REPLACEMENT | Tuesday, May 03, 2016, 14:29
Turned vacuum pump on this morning,
sounded awful: loud grinding bad noises. |
|
1
|
Monday, March 28, 2011, 12:40 |
John Wong | | | | | Under Construction | Evaporator #2 is still under construction.
For further information please contact Jens
Lassen. |
|
668
|
Wednesday, August 07, 2024, 15:37 |
Aaron Schmidt | | | | | Turning on EVAP2's turbo pump | Wednesday, August 07, 2024, 15:36: Roughing.
Had initially been roughed & TP started
w/ Marla CS, however it timed out. Restarting. |
|
364
|
Monday, May 08, 2017, 10:05 |
Laura Lambert | | | | Maintenance | Turbo pump control box replaced | Monday, May 08, 2017, 10:05
Turbo pump control box died last
week. |
|
458
|
Tuesday, September 17, 2019, 13:25 |
Aaron Schmidt | | | LP-SIS | Problems resolved | Turbo pump / roughing troubleshoot. | Swapped out VCRs on HS to tray connection.
(Right one felt slightly off)
Tuesday, September 17, 2019, 13:23: |
|
580
|
Thursday, June 09, 2022, 09:09 |
Darwin Ortiz Rosales | Ta | | HP-FEBIAD | Done | Troubleshooting | Thursday, June 09, 2022, 09:07
Yesterday, Wednesday June 08, 2022
@ ~3.00 pm a "dummy" target container |
|
557
|
Wednesday, October 13, 2021, 08:35 |
Aaron Schmidt | | | | Problems | Troubleshoot - Pump down issues. | Swapped out the Cu gaskets for SS gaskets
in the HS top lines. (x2)
Wednesday, October 13, 2021, 08:35: |
|
432
|
Thursday, March 07, 2019, 09:22 |
Darwin Ortiz Rosales | Empty | 40282-4 | TARGET BOAT | Done | Transfer tube TaC coating (Legnaro) | Thursday, March 07, 2019, 09:09
Transfer tube from Legnaro was coated
with TaC. |
|
625
|
Wednesday, April 26, 2023, 09:48 |
Darwin Ortiz Rosales | TiC | 44692-5 | LP-FEBIAD | Done | TiC230425 | Wednesday, April 26, 2023, 09:32
LP FEBIAD loaded with 367 TiC discs
and 4 TiC removable discs for analyses |
|
626
|
Wednesday, April 26, 2023, 18:20 |
Carla Babcock | TiC | 44692-5 | LP-FEBIAD | In progress | TiC230425 |
|
|
627
|
Wednesday, April 26, 2023, 22:26 |
John Wong | TiC | 44692-5 | LP-FEBIAD | In progress | TiC230425 |
|
|
628
|
Thursday, April 27, 2023, 06:30 |
Darwin Ortiz Rosales | TiC | 44692-5 | LP-FEBIAD | Done | TiC230425 |
|
|