  Evaporator_2, Page 34 of 35  Not logged in ELOG logo
  ID Date Authordown Target Material Target Oven W.O# Source Status Subject Text Attachments
  513   Tuesday, October 06, 2020, 14:23 Aaron SchmidtTa44508-1LP-SISIn progressConditioning Ta#61Ta#61 LP-SIS target description:
Total Ta foils = 470 [6x20 packs
  
  514   Wednesday, October 07, 2020, 12:25 Aaron Schmidt   In progressIEVAP2:TP1 Swap out. Wednesday, October 07, 2020
TP1 was not spinning up past 4krpm.
Stalling & tripping out. Examined with
  
  519   Wednesday, October 21, 2020, 14:39 Aaron SchmidtNb44508-2LP-SISIn progressConditioning Nb#9 Nb#9 LP-SIS target description:
  
  524   Tuesday, November 24, 2020, 08:13 Aaron Schmidt    Flex - line HS installedMonday, November 23, 2020, 17:01: Flex-line
HS installed.

Tuesday, November 24, 2020,
  
  527   Tuesday, February 09, 2021, 06:48 Aaron Schmidt NA DoneTa coating testMonday, February 08, 2021, 17:00: Installed
brackets w/ Ta wire and a small piece of
Re to test voltage drop.
  
  532   Monday, March 01, 2021, 13:58 Aaron Schmidt    Flex - line HS installedFlex-Line HS had been fully scrubbed out
earlier. All gaskets replaced.
Empty. Quick check for leaks.
  
  537   Tuesday, March 23, 2021, 08:07 Aaron Schmidt    Re - Ta test. Leak check. Modified HS installed with new brackets
as per Marla.
Tuesday, March 23, 2021, 08:02: Vacuum
  
  539   Thursday, March 25, 2021, 07:57 Aaron Schmidt    Re - Ta test. Leak check.Thursday, March 25, 2021, 07:55: Vacuum
@ 5.12e-07T. Waterlines opened.
  
  546   Thursday, April 08, 2021, 08:25 Aaron SchmidtTa44139-10LP-SISIn progressConditioning Ta#62 & Flex - line HS installed Ta#62 LP-SIS target
description:
  
  551   Wednesday, June 23, 2021, 17:48 Aaron SchmidtTa44691-4LP-SISIn progressConditioning Ta#62 (Replacement) Ta#62 LP-SIS target
description: (REPLACEMENT FOR 44139-10)
 Ta#62_conditioning_-_Evap_2_-_44691-4.docx 
  557   Wednesday, October 13, 2021, 08:35 Aaron Schmidt   ProblemsTroubleshoot - Pump down issues.Swapped out the Cu gaskets for SS gaskets
in the HS top lines. (x2)
Wednesday, October 13, 2021, 08:35:
  
  564   Wednesday, November 10, 2021, 18:07 Aaron SchmidtTa44691-11LP-SISIn progressConditioning Ta#63Ta#63 LP-SIS target description: 
  
  565   Thursday, November 25, 2021, 14:00 Aaron Schmidt    Lower insulator replaced The Helicoil had mostly pulled out
of the old one.
  
  571   Tuesday, April 12, 2022, 13:41 Aaron Schmidt   MaintenanceNew Flex - line HS installedOld HS sprang a leak in the copper tubing.  
HS#44378-15
Tuesday, April 12, 2022, 13:35: Roughing. 
  
  575   Tuesday, May 10, 2022, 14:43 Aaron Schmidt   MaintenanceActive TP removed / Swap / Slow start TP Tuesday, May 10, 2022, 14:42: TV551
Varian. SN: 202311 (Slightly active from
  
  577   Thursday, June 02, 2022, 16:53 Aaron SchmidtTa44691-12LP-SISIn progressConditioning Ta#64 Ta#64 LP-SIS target
description: 
  
  618   Thursday, March 30, 2023, 12:45 Aaron SchmidtTa45220-7LP-SISIn progressConditioning Ta#65Thursday, March 30, 2023, 12:27: 
Ta#65 LP-SIS target description: 
  
  635   Monday, June 05, 2023, 14:52 Aaron Schmidt    Swapped turbo pumps. Previous TP would only spin up to
4KRPM. New TP installed.
Monday, June 05, 2023, 14:50: Roughing. 
  
  638   Wednesday, June 21, 2023, 10:37 Aaron SchmidtNb45447-7LP-IG-LISIn progressConditioning Nb#10Nb#10 LP-IG-LIS target description:
  
  641   Thursday, August 24, 2023, 14:18 Aaron SchmidtNb45447-9LP-IG-LISIn progressConditioning Nb#11 Nb#11 LP-IG-LIS target
description:
  