Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 31 of 34  Not logged in ELOG logo
  ID Date Author Target Material Target Oven W.O# Source Statusdown Subject Text Attachments
  615   Sunday, March 12, 2023, 08:06 Darwin Ortiz RosalesTa44692-2HP-SISDoneTaC coating sinteringSunday, March 12, 2023, 08:04
Ta HP-SIS was coated
  
  616   Monday, March 13, 2023, 22:31 Darwin Ortiz RosalesSiC44692-2HP-SISDoneSiC-230313Monday, March 13, 2023, 22:28
Total number of foils:380
  
  617   Thursday, March 16, 2023, 14:47 Darwin Ortiz RosalesTaC45220-9LP-SISDoneTaC coating sinteringThursday, March 16, 2023, 13:38
The coated container was wrapped
in four Ta foil heatshields.
  
  619   Tuesday, April 04, 2023, 12:50 Darwin Ortiz RosalesTaC45447-1HP-FEBIADDoneTaC coating sinteringTuesday, April 04, 2023, 12:48
Ta HP-FEBIAD was coated
  
  620   Wednesday, April 12, 2023, 09:53 Darwin Ortiz RosalesTaC TARGET BOATDoneTaC coating sintering
Wednesday, April 12, 2023, 09:53
The coated container was wrapped
in 3 Ta foil heatshields.
  
  621   Sunday, April 16, 2023, 14:08 Darwin Ortiz RosalesTaC45220-14LP-SISDoneTaC coating sinteringSunday, April 16, 2023, 14:08
The coated container was wrapped
in four Ta foil heatshields.
  
  622   Tuesday, April 18, 2023, 06:48 Darwin Ortiz RosalesTaC45220-11LP-SISDoneTaC coating sinteringTuesday, April 18, 2023, 06:46
The coated container was wrapped
in four Ta foil heatshields.
  
  623   Thursday, April 20, 2023, 07:00 Darwin Ortiz RosalesTaC41790-7LP-FEBIADDoneTaC coating sinteringThursday, April 20, 2023, 06:59
The coated container was wrapped
in 3 Ta foil heatshields.
  
  624   Monday, April 24, 2023, 09:12 Darwin Ortiz RosalesTaC44692-5LP-FEBIADDoneTaC coating sinteringSunday, April 23, 2023, 07:23
The coated container was wrapped
in 3 Ta foil heatshields.
  
  625   Wednesday, April 26, 2023, 09:48 Darwin Ortiz RosalesTiC44692-5LP-FEBIADDoneTiC230425Wednesday, April 26, 2023, 09:32
LP FEBIAD loaded with 367 TiC discs
and 4 TiC removable discs for analyses
  
  628   Thursday, April 27, 2023, 06:30 Darwin Ortiz RosalesTiC44692-5LP-FEBIADDoneTiC230425


   
        
            
  
  631   Friday, April 28, 2023, 09:39 Darwin Ortiz RosalesTiC44692-5LP-FEBIADDoneTiC230425


   
        
            
 MicrosoftTeams-image_(20).png 
  632   Friday, April 28, 2023, 11:31 Darwin Ortiz RosalesTaCBoatTARGET BOATDoneTaC coated endcaps and spring sinteringFriday, April 28, 2023, 11:29
loaded 14 TaC coated end caps and
2 TaC coated springs.
  
  634   Wednesday, May 24, 2023, 15:23 Darwin Ortiz Rosales 44139-4LP TUBEDoneGraphite inside insert Experiment 1 
Wednesday, May 24, 2023, 15:22
A Ta container tube was wrapped with
 Screenshot_Graphite_insert_Exp1.png 
  636   Tuesday, June 06, 2023, 09:14 Darwin Ortiz RosalesC44139-4TARGET BOATDoneGraphite inside insert Experiment 2 (regular formulation discs)Tuesday, June 06, 2023, 09:11
A Ta container tube was wrapped with
4 Ta heatshields.  Note final
  
  637   Thursday, June 08, 2023, 09:29 Darwin Ortiz RosalesTaC TARGET BOATDoneTaC coated endcaps and spring sintering (new TaC)Thursday, June 08, 2023, 09:28
Using smaller particle size TaC no
ball mill procedure.
  
  639   Tuesday, August 15, 2023, 12:03 Darwin Ortiz RosalesTaC44692-11TARGET BOATDoneTaC coating sinteringTuesday, August 15, 2023, 10:48
The coated container was wrapped
in 4 Ta foil heatshields.
  
  640   Tuesday, August 22, 2023, 09:35 Darwin Ortiz RosalesTaC44692-11TARGET BOATDoneTaC coating sintering (second coating on same tube)Tuesday, August 22, 2023, 09:29
The coated container was wrapped
in 4 Ta foil heatshields.
  
  642   Saturday, August 26, 2023, 09:41 Darwin Ortiz RosalesTaC45220-10LP-SISDoneTaC coating sintering
Saturday, August 26, 2023, 09:39
The coated container was wrapped
in 4 Ta foil heatshields.
  
  643   Tuesday, August 29, 2023, 12:47 Darwin Ortiz RosalesTaC45220-10LP-SISDoneTaC coating sinteringTuesday, August 29, 2023, 12:46
The coated container was wrapped
in 4 Ta foil heatshields.
  
ELOG V2.9.2-2455