Tuesday, June 20, 2017, 16:07, Laura Lambert, Ta, 42218-6, HP-SIS, Done, Conditioning Ta#53
|
Tuesday, June 20, 2017, 15:58
Target consists of 470 discs.
Total packed length 3.4cm [exactly 7.8cm space on both sides]
Total mass 50.3105g [Incl foils + Ta wire on 6 packs]
Target consists of 350 single discs and 6x20 packs of Ta discs
Discs in target are arranged as follows: 1pack / 75singles / 1pack / 100singles / 2packs / 100singles / 1pack / 75singles / 1pack
1 long Ta Heat shield.
No endcaps inserted, no Rh foil inserted.
Chamber currently pumping down.
TBHT will be ramped up to 230A at 1.0A/min.
TGHT will be ramped up to 600A at 2.0A/min.
Final desired temperature = 1900C
OMEGA slope = 0.98
Vacuum limit stop at 3.0e-5 Torr, backing off at 4.0e-5 Torr.
*Note: container accidentally engraved with WO#412218-6 when it should be WO#42218-6
Wednesday, June 21, 2017, 10:05
HS water valves opened, no leaks detected.
Tapped up manually to 40A, vacuum stable.
IGP1 = 5.53e-7 Torr
IGP2 = 4.35e-7 Torr
Initiating auto-ramp.
Wednesday, June 21, 2017, 14:48
TGHT stopped at 575A due to voltage limit sitting at 9V
Increased max setpoint of voltage to 14V.
Re-started auto-ramp starting at 575A.
Wednesday, June 21, 2017, 15:23
TGHT = 600A, 8.95V
TBHT = 230A, 3.72V
IGP1 = 1.55e-6 Torr
IGP2 = 1.62e-6 Torr
OMEGA = 1538C
Increasing max setpoint of TGHT to 700A
Wednesday, June 21, 2017, 16:21
TGHT = 700A, 10.57V
TBHT = 230A, 3.75V
IGP1 = 2.2e-6 Torr
IGP2 = 2.4e-6 Torr
OMEGA = 1730C
Increasing max setpoint of TGHT to 750A
Friday, June 23, 2017, 15:41
TGHT = 780A, 11.77V
TBHT = 230A, 3.77V
IGP1 = 4.8e-7 Torr
IGP2 = 4.8e-7 Torr
OMEGA = 1890C
Conditioning process complete.
Initiating auto-cool at 2.0A/min for the TGHT and 1.0A/min for the TBHT.
Monday, June 26, 2017, 10:51
Target vented in air and removed from evap2 today.
Endcaps inserted.
Target looks good!
|
Tuesday, May 30, 2017, 14:40, Laura Lambert, Ta, 42218-14, LP-SIS, Done, Conditioning Ta#52
|
Tuesday, May 30, 2017, 14:36
Target consists of 400 discs.
Total packed length 2.9cm [exactly 8.05cm space on both sides]
Total mass 42.8228g [Incl foils + Ta wire on 4 packs]
Target consists of 320 single discs and 4x20 packs of Ta discs
Discs in target are arranged as follows: 80singles / 1pack / 80singles / 2packs / 80singles / 1pack / 80singles
3x Ta Heat shields.
No endcaps inserted, no Rh foil inserted.
Chamber currently pumping down.
TBHT will be ramped up to 230A at 1.0A/min.
TGHT will be ramped up to 350A at 2.0A/min.
Final desired temperature = 1900C
OMEGA slope = 0.98
Windows cleaned.
Vacuum limit stop at 3.0e-5 Torr, backing off at 4.0e-5 Torr.
Wednesday, May 31, 2017, 09:47
HS water valves opened, no leaks detected.
Tapped up manually to 35A.
Vacuum stable.
IGP1 = 4.58e-7 Torr
IGP2 = 3.68e-7 Torr
Initiating auto ramp.
Wednesday, May 31, 2017, 14:07
IGP1 = 1.11e-6 Torr
IGP2 = 1.13e-6 Torr
TGHT = 354A, 5.45V
TBHT =233A, 4.01V
OMEGA = 1565C
Increasing max setpoint to 400A at same ramping rate.
Wednesday, May 31, 2017, 14:41
IGP1 = 1.19e-6 Torr
IGP2 = 1.24e-6 Torr
TGHT = 401A, 6.37V
OMEGA = 1708C
Increasing max setpoint to 425A at same ramping rate.
Wednesday, May 31, 2017, 15:51
Tapped up to ~1900C
TGHT = 480A, 7.85V
TBHT = 230A, 4.06V
OMEGA = 1912C
IGP1 = 1.85e-6 Torr
IGP2 = 2.06e-6 Torr
Will remain at max setpoints for a couple days before cooling
Friday, June 02, 2017, 13:19
Remained at max setpoint for 2days
TGHT = 480A, 7.85V
TBHT = 230A, 4.06V
OMEGA = 1885C
IGP1 = 2.15e-7 Torr
IGP2 = 2.07e-7 Torr
Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
Monday, June 05, 2017, 15:18
Vented in air and taken out this morning.
Target looks good
Wednesday, June 07, 2017, 15:41
Endcaps inserted.
Ta heat shield removed.
Rh foil inserted.
Handed off to assembly.
|
Monday, March 13, 2017, 15:34, Anders Mjos, Ta, 41790-4, LP-SIS, Done, Conditioning Ta#51
|
Target container wrapped in 3x heat shield foils and installed by JW
Monday, March 13, 2017, 15:33: Opened water for HS. Vacuum stable at IG1 1E-6 T
Monday, March 13, 2017, 15:48: TGHT / TBHT to 30 / 15 A.
Monday, March 13, 2017, 15:54: Started auto-ramping to TGHT / TBHT 150 / 75 A at 1 / 0.5 A/min. Good/bad vacuum 3 / 4 E-5 Torr
Tuesday, March 14, 2017, 08:23: Continue auto-ramping to TGHT / TBHT 300 / 150 A. Vacuum stable at IG1 2.3E-7 T
Tuesday, March 14, 2017, 11:18: Continue auto-ramping to TGHT / TBHT 350 / 200 A. Vacuum stable at IG1 3.8E-7 T
Wednesday, March 15, 2017, 08:31: Continue auto-ramping to TGHT 375. Vacuum stable at IG1 2.5E-7 T. Omega at 1500 C
Wednesday, March 15, 2017, 16:34: Continue auto-ramping to TGHT 500. Vacuum increased to IG1 5.5E-7 T. Omega at 1887 C
Thursday, March 16, 2017, 08:34: Continue auto-ramping to TGHT 520. Vacuum increased to IG1 3.3E-7 T. Omega at 1888 C
Thursday, March 16, 2017, 08:48: TGHT at 521 A 8.99 V. Omega at 1899 C
Friday, March 17, 2017, 08:25: TGHT at 521 A 8.88 V. Omega at 1886 C. Vacuum IG1 2.5E-7 Torr
Ramping down
Wednesday, March 22, 2017, 08:42: Turbo pump stopped |
Friday, October 07, 2016, 16:42, Laura Lambert, Ta, 41790-5, LP-SIS, In progress, Conditioning Ta#50
|
Friday, October 07, 2016, 16:40
Target consists of 470 discs.
Total packed length 3.4cm [exactly 7.8cm space on both sides]
Total mass 47.6889g [Incl foils + Ta wire on 6 packs]
Note: Target consists of 350 single discs and 6x20 packs of Ta discs
3x Ta Heat shields.
No endcaps inserted, no Rh foil inserted.
Chamber currently pumping down.
TBHT will be ramped up to 230A at 1.0A/min.
TGHT will be ramped up to 300A at 2.0A/min.
Final desired temperature = 1900C
Tuesday, October 11, 2016, 10:02
HS water valves opened, no leaks detected
Tapped up manually to 35A
Vacuum stable, IGP1 = 2e-7 Torr
Initiating auto-ramp.
OMEGA slope = 0.98
Wednesday, October 12, 2016, 16:15
Tapped up to 1900C? [see attached link for data concerning temperature readings]
TGHT = 450A, 7.16V
TBHT = 230A, 4.1V
OMEGA = 1748C
IGP1 = 6.1e-7 Torr
|
Wednesday, October 12, 2016, 21:18, John Wong, Ta, 41790-5, LP-SIS, In progress, Conditioning Ta#50
|
Laura Lambert wrote: |
Friday, October 07, 2016, 16:40
Target consists of 470 discs.
Total packed length 3.4cm [exactly 7.8cm space on both sides]
Total mass g [Incl foils + Ta wire on 6 packs]
Note: Target consists of 350 single discs and 6x20 packs of Ta discs
3x Ta Heat shields.
No endcaps inserted, no Rh foil inserted.
Chamber currently pumping down.
TBHT will be ramped up to 230A at 1.0A/min.
TGHT will be ramped up to 300A at 2.0A/min.
Final desired temperature = 1900C
Tuesday, October 11, 2016, 10:02
HS water valves opened, no leaks detected
Tapped up manually to 35A
Vacuum stable, IGP1 = 2e-7 Torr
Initiating auto-ramp.
OMEGA slope = 0.98
Wednesday, October 12, 2016, 16:15
Tapped up to 1900C? [see attached link for data concerning temperature readings]
TGHT = 450A, 7.16V
TBHT = 230A, 4.1V
OMEGA = 1748C
IGP1 = 6.1e-7 Torr
|
Wednesday, October 12, 2016, 21:14
Current status before cooling down:
TGHT at 450A/7.32V; TBHT at 230A/4.10V; OMEGA at 1747C
Vacuum at 4.05 e-7 Torr.
Initiate auto-rampping at 2A/min for TGHT and 1A/min for TBHT
|
Thursday, October 13, 2016, 17:32, Laura Lambert, Ta, 41790-5, LP-SIS, Done, Conditioning Ta#50
|
John Wong wrote: |
Laura Lambert wrote: |
Friday, October 07, 2016, 16:40
Target consists of 470 discs.
Total packed length 3.4cm [exactly 7.8cm space on both sides]
Total mass g [Incl foils + Ta wire on 6 packs]
Note: Target consists of 350 single discs and 6x20 packs of Ta discs
3x Ta Heat shields.
No endcaps inserted, no Rh foil inserted.
Chamber currently pumping down.
TBHT will be ramped up to 230A at 1.0A/min.
TGHT will be ramped up to 300A at 2.0A/min.
Final desired temperature = 1900C
Tuesday, October 11, 2016, 10:02
HS water valves opened, no leaks detected
Tapped up manually to 35A
Vacuum stable, IGP1 = 2e-7 Torr
Initiating auto-ramp.
OMEGA slope = 0.98
Wednesday, October 12, 2016, 16:15
Tapped up to 1900C? [see attached link for data concerning temperature readings]
TGHT = 450A, 7.16V
TBHT = 230A, 4.1V
OMEGA = 1748C
IGP1 = 6.1e-7 Torr
|
Wednesday, October 12, 2016, 21:14
Current status before cooling down:
TGHT at 450A/7.32V; TBHT at 230A/4.10V; OMEGA at 1747C
Vacuum at 4.05 e-7 Torr.
Initiate auto-rampping at 2A/min for TGHT and 1A/min for TBHT
|
Thursday, October 13, 2016, 17:32
vented in air and opened up this morning.
target looks good. |
Tuesday, July 26, 2016, 16:53, Laura Lambert, Ta, 41369-6, HP-SIS, Done, Conditioning Ta#49
|
Tuesday, July 26, 2016, 16:50
loaded into evap2
pumped down, HS water valves opened, no leaks detected.
tapped up manually to 35A
vacuum stable = 3.8e-6 Torr
Initiating auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.
Final setpoints at 230A for the TBHT and 600A for the TGHT.
Final desired temperature = 1800C
Wednesday, July 27, 2016, 09:20
IGP1 = 6.3e-7 Torr, vacuum stable.
TGHT = 232A, 2.7V
TBHT = 131A, 1.76V
Increasing ramping rate to 1.0A/min and 0.5A/min for the TGHT and TBHT respectively.
Wednesday, July 27, 2016, 15:46
TGHT = 600A, 8.87V
TBHT = 230A, 3.7V
IGP1 = 1.37e-6 Torr
OMEGA = 1640C
Increased max TGHT voltage to 12V
Tapped up manually to OMEGA = 1810C
TGHT = 675A, 10.21V
IGP1 = 2.2e-6 Torr
Will remain at max setpoints for the rest of the week and cool down over weekend.
Thursday, July 28, 2016, 08:34
TGHT = 675A, 10.41V
OMEGA = 1833C
Tapped down to 660A, 10.09V
OMEGA = 1805C
Friday, July 29, 2016, 13:57
OMEGA = 1814C
TGHT = 660A, 10.16V
TBHT = 230A, 3.72V
IGP1 = 3.43e-7 Torr
evap2 has remained at max setpoints for ~42hrs
conditioning complete.
Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
Tuesday, August 02, 2016, 13:39
vented in air and removed from evap2 this morning.
target looks good!
|
Tuesday, August 18, 2015, 16:02, Laura Lambert, Ta, , HP-SIS, In progress, Conditioning Ta#46 Target
|
Tuesday, August 18, 2015, 15:53
Target consists of 505 discs.
Total packed length 3.4cm.
Total mass 75.2772g.
Re foil inserted.
3x Ta Heat shields.
No endcaps inserted.
Chamber currently pumping down.
TBHT will be ramped up to 230A at 1.0A/min.
TGHT will be ramped up to 1800C, auto ramp to 600A at 2.0A/min [estimated final value of 720A according to elog ID 184]
*Note: Turbo Pump is on low speed
Wednesday, August 19, 2015, 10:15
IGP1 = 8.3e-7 Torr.
Tapped up manually to 35A.
Initiating auto-ramp.
Wednesday, August 19, 2015, 15:55
IGP1 = 3.3e-6 Torr.
TBHT reached max setpoint of 230A
TGHT reached max setpoint of 600A
OMEGA = 1554C
Increasing final setpoint of TGHT to 700A and re-initiating auto-ramp.
|
Wednesday, August 19, 2015, 17:26, John Wong, Ta, , HP-SIS, In progress, Conditioning Ta#46 Target
|
Laura Lambert wrote: |
Tuesday, August 18, 2015, 15:53
Target consists of 505 discs.
Total packed length 3.4cm.
Total mass 75.2772g.
Re foil inserted.
3x Ta Heat shields.
No endcaps inserted.
Chamber currently pumping down.
TBHT will be ramped up to 230A at 1.0A/min.
TGHT will be ramped up to 1800C, auto ramp to 600A at 2.0A/min [estimated final value of 720A according to elog ID 184]
*Note: Turbo Pump is on low speed
Wednesday, August 19, 2015, 10:15
IGP1 = 8.3e-7 Torr.
Tapped up manually to 35A.
Initiating auto-ramp.
Wednesday, August 19, 2015, 15:55
IGP1 = 3.3e-6 Torr.
TBHT reached max setpoint of 230A
TGHT reached max setpoint of 600A
OMEGA = 1554C
Increasing final setpoint of TGHT to 700A and re-initiating auto-ramp.
|
Wednesday, August 19, 2015, 17:13
TGHT reached to 700A/10.5V, direct voltage at 5.2V, and temp measured at both ends at 1755C. Vac is coming down from 4.2e-6 Torr.
Stepping up TGHT to reach 1800C
Wednesday, August 19, 2015, 17:22
Increased TGHT to 722A/11.3V (direct voltage at 5.48V) to reach 1800C (consistant with the heating curve as for the previous HPTa target, elog 184)
Will continue to condition the target at this temperature for overnight.
Cooling down can be initiated tomorrow morning at 2A/min --- Please measure the target temperature from the new window port before cooling it down.
|
Thursday, August 20, 2015, 10:07, Laura Lambert, Ta, , HP-SIS, In progress, Conditioning Ta#46 Target
|
John Wong wrote: |
Laura Lambert wrote: |
Tuesday, August 18, 2015, 15:53
Target consists of 505 discs.
Total packed length 3.4cm.
Total mass 75.2772g.
Re foil inserted.
3x Ta Heat shields.
No endcaps inserted.
Chamber currently pumping down.
TBHT will be ramped up to 230A at 1.0A/min.
TGHT will be ramped up to 1800C, auto ramp to 600A at 2.0A/min [estimated final value of 720A according to elog ID 184]
*Note: Turbo Pump is on low speed
Wednesday, August 19, 2015, 10:15
IGP1 = 8.3e-7 Torr.
Tapped up manually to 35A.
Initiating auto-ramp.
Wednesday, August 19, 2015, 15:55
IGP1 = 3.3e-6 Torr.
TBHT reached max setpoint of 230A
TGHT reached max setpoint of 600A
OMEGA = 1554C
Increasing final setpoint of TGHT to 700A and re-initiating auto-ramp.
|
Wednesday, August 19, 2015, 17:13
TGHT reached to 700A/10.5V, direct voltage at 5.2V, and temp measured at both ends at 1755C. Vac is coming down from 4.2e-6 Torr.
Stepping up TGHT to reach 1800C
Wednesday, August 19, 2015, 17:22
Increased TGHT to 722A/11.3V (direct voltage at 5.48V) to reach 1800C (consistant with the heating curve as for the previous HPTa target, elog 184)
Will continue to condition the target at this temperature for overnight.
Cooling down can be initiated tomorrow morning at 2A/min --- Please measure the target temperature from the new window port before cooling it down.
|
Thursday, August 20, 2015, 08:27
OMEGA = 1830C
Internal temperature using Mikron taken from the second 'new' view port: Hottest point on target leg = 2250C; hottest point on target material discs inside container = 1830C.
IGP1 = 1.5e-6 Torr.
EVAP2 has been sitting at max setpoints for ~15hours.
Initiated auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
|
Thursday, August 20, 2015, 17:15, John Wong, Ta, , HP-SIS, Done, Conditioning Ta#46 Target
|
Laura Lambert wrote: |
John Wong wrote: |
Laura Lambert wrote: |
Tuesday, August 18, 2015, 15:53
Target consists of 505 discs.
Total packed length 3.4cm.
Total mass 75.2772g.
Re foil inserted.
3x Ta Heat shields.
No endcaps inserted.
Chamber currently pumping down.
TBHT will be ramped up to 230A at 1.0A/min.
TGHT will be ramped up to 1800C, auto ramp to 600A at 2.0A/min [estimated final value of 720A according to elog ID 184]
*Note: Turbo Pump is on low speed
Wednesday, August 19, 2015, 10:15
IGP1 = 8.3e-7 Torr.
Tapped up manually to 35A.
Initiating auto-ramp.
Wednesday, August 19, 2015, 15:55
IGP1 = 3.3e-6 Torr.
TBHT reached max setpoint of 230A
TGHT reached max setpoint of 600A
OMEGA = 1554C
Increasing final setpoint of TGHT to 700A and re-initiating auto-ramp.
|
Wednesday, August 19, 2015, 17:13
TGHT reached to 700A/10.5V, direct voltage at 5.2V, and temp measured at both ends at 1755C. Vac is coming down from 4.2e-6 Torr.
Stepping up TGHT to reach 1800C
Wednesday, August 19, 2015, 17:22
Increased TGHT to 722A/11.3V (direct voltage at 5.48V) to reach 1800C (consistant with the heating curve as for the previous HPTa target, elog 184)
Will continue to condition the target at this temperature for overnight.
Cooling down can be initiated tomorrow morning at 2A/min --- Please measure the target temperature from the new window port before cooling it down.
|
Thursday, August 20, 2015, 08:27
OMEGA = 1830C
Internal temperature using Mikron taken from the second 'new' view port: Hottest point on target leg = 2250C; hottest point on target material discs inside container = 1830C.
IGP1 = 1.5e-6 Torr.
EVAP2 has been sitting at max setpoints for ~15hours.
Initiated auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
|
Thursday, August 20, 2015, 17:14
Target was removed the the evaporator and inspected. It looks good!
Ta-heat shields are removed.
End caps are inserted but need to be expended.
Ready for assembly.
|
Friday, June 13, 2014, 14:57, Laura Lambert, Ta, 40282-2, LP-SIS, In progress, Conditioning Ta#43 target
|
Friday, June 13, 2014, 14:53
Container is filled with 400 discs of Ta foils; target length = 5.2cm;
Total mass ( Ta foils + wire) = 45.92g
No Ta foil heat shield.
No caps inserted.
Chamber pumped down this morning.
HS cooling water valves opened, no leaks detected.
IG @ 5.8e-6 Torr.
TGHT max = 580A
TBHT max = 230A
Ramping rate 0.2A/min.
Monday, June 16, 2014, 11:46
TGHT and TBHT reached their respective 580A and 230A over the weekend.
IGP1 currently at 3.2e-7 Torr.
Internal temp [measured using mikron, right side of EVAP2, pointed at discs inside] = 1375C
|
Monday, June 16, 2014, 17:42, John Wong, Ta, 40282-2, LP-SIS, In progress, Conditioning Ta#43 target
|
Laura Lambert wrote: |
Friday, June 13, 2014, 14:53
Container is filled with 400 discs of Ta foils.
No Ta foil heat shield.
No caps inserted.
Chamber pumped down this morning.
HS cooling water valves opened, no leaks detected.
IG @ 5.8e-6 Torr.
TGHT max = 580A
TBHT max = 230A
Ramping rate 0.2A/min.
Monday, June 16, 2014, 11:46
TGHT and TBHT reached their respective 580A and 230A over the weekend.
IGP1 currently at 3.2e-7 Torr.
Internal temp [measured using mikron, right side of EVAP2, pointed at discs inside] = 1375C
|
Monday, June 16, 2014, 17:21
Further stepping up TGHT to 650A.
Temperature measured on target discs = 1542C. Vac @ 3.28e-7 Torr.
Initiate cooling down process; 2A/min for TGHT; 1A/min for TBHT
|
Tuesday, June 17, 2014, 10:14, Laura Lambert, Ta, 40282-2, LP-SIS, Done, Conditioning Ta#43 target
|
John Wong wrote: |
Laura Lambert wrote: |
Friday, June 13, 2014, 14:53
Container is filled with 400 discs of Ta foils.
No Ta foil heat shield.
No caps inserted.
Chamber pumped down this morning.
HS cooling water valves opened, no leaks detected.
IG @ 5.8e-6 Torr.
TGHT max = 580A
TBHT max = 230A
Ramping rate 0.2A/min.
Monday, June 16, 2014, 11:46
TGHT and TBHT reached their respective 580A and 230A over the weekend.
IGP1 currently at 3.2e-7 Torr.
Internal temp [measured using mikron, right side of EVAP2, pointed at discs inside] = 1375C
|
Monday, June 16, 2014, 17:21
Further stepping up TGHT to 650A.
Temperature measured on target discs = 1542C. Vac @ 3.28e-7 Torr.
Initiate cooling down process; 2A/min for TGHT; 1A/min for TBHT
|
Tuesday, June 17, 2014, 10:08
TGHT and TBHT reached 0A last night.
Turned off EVAP2
Venting chamber
Process Complete
|
Wednesday, August 21, 2013, 12:30, John Wong, Ta, 38817-10, HP-SIS, Done, Conditioning Ta target
|
Wednesday, August 21, 2013, 12:28
Container is filled with 400 discs of Ta foils, and wrapped with 3 layers of Ta heat shields.
No caps are inserted during the conditioning.
Chamber is currently being pumped down.
Wednesday, August 21, 2013, 15:54
HS cooling water valves opened, no leaks were detected.
IG @ 2.9e-6 Torr.
Heating setting:
TGHT max = 820A,
TBHT max = 230A
ramping rate 2A/min.
Thursday, August 22, 2013, 12:45
TGHT/TBHT reached to 820A/230A, respectively.
So much out-gassing was observed at the max currents. (see attachment#1).
TGHT/TBHT are ramping down at 4A/min.
Chamber will be vented in air.
The target will will be inspected.
More info later...
Thursday, August 22, 2013, 16:44
Target was removed from the evaporator and inspected.
The container and the Ta materials look OK.
The outgassing could be from the Ta-heat shields; they look burnt and brittle.
Overall, the target is good.
|
Wednesday, August 06, 2014, 16:10, John Wong, Ta, 38817-9, HP-SIS, In progress, Conditioning Ta target
|
Wednesday, August 06, 2014, 15:59
Target consists of 400 Ta discs.
Total packed length 4.5cm
Total mass 47.490g.
Re foil inserted.
Wednesday, August 06, 2014, 16:07
Chamber is currently being pumped down.
No Ta heat-shield wrapped (Want to check the temperature without it)
One end-cap inserted on left (wrt ionizer into the page).
TGHT and TBHT will be ramped up to 820A/230A at 2A/min.
Wednesday, August 06, 2014, 18:07
Vacuum at 2.3e-6 Torr. HS water valve opened. No leaks.
Initiated auto-ramping.
Thursday, August 07, 2014, 11:39
Target has been heated for 11hrs at TGHT/TBHT = 820A/230A.
Temperature measured with pyrometer:
Target leg = 1600C + (250 correction for e=0.25) = 1850C
Inside target material = dark, temp can't be measured.
Cooling down at 2A/min for TGHT and 1A/min TBHT.
|
Friday, August 08, 2014, 15:16, Laura Lambert, Ta, 38817-9, HP-SIS, Done, Conditioning Ta target
|
John Wong wrote: |
Wednesday, August 06, 2014, 15:59
Target consists of 400 Ta discs.
Total packed length 4.5cm
Total mass 47.490g.
Re foil inserted.
Wednesday, August 06, 2014, 16:07
Chamber is currently being pumped down.
No Ta heat-shield wrapped (Want to check the temperature without it)
One end-cap inserted on left (wrt ionizer into the page).
TGHT and TBHT will be ramped up to 820A/230A at 2A/min.
Wednesday, August 06, 2014, 18:07
Vacuum at 2.3e-6 Torr. HS water valve opened. No leaks.
Initiated auto-ramping.
Thursday, August 07, 2014, 11:39
Target has been heated for 11hrs at TGHT/TBHT = 820A/230A.
Temperature measured with pyrometer:
Target leg = 1600C + (250 correction for e=0.25) = 1850C
Inside target material = dark, temp can't be measured.
Cooling down at 2A/min for TGHT and 1A/min TBHT.
|
Friday, August 08, 2014, 15:14
Vented in air and opened up up this morning.
Endcaps inserted and expanded.
Rh foil and salts added.
|
Monday, March 09, 2015, 16:50, Laura Lambert, Ta, 38817-5, HP-SIS, In progress, Conditioning Ta target
|
Monday, March 09, 2015, 16:47
Target consists of 400 discs.
Total packed length 3.4cm
Total mass 45.8181g
Re foil inserted.
Chamber is currently being pumped down.
No Ta-heat shield wrapped.
One end-cap inserted on left (wrt ionizer into the page)
TGHT and TBHT will be ramped up to 820A/230A respectively at 2.0A/min.
Tuesday, March 10, 2015, 10:28
HS water valves opened, no leaks detected.
IGP1 = 4.5e-7 Torr.
Power supply not responding to epics...AGAIN. grrrr
Tuesday, March 10, 2015, 13:17
IOC was rebooted - back up and running again! yay!
IGP1 = 4.0e-7 Torr.
Tapped up manually to 35A, waited ~30min, vaccuum stable.
Initiating auto-ramp.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
Wednesday, March 11, 2015, 09:11
Target has been at max setpoints for ~14hrs.
OMEGA = 1472C
TGHT = 820A, 12.85V
TBHT = 230A, 3.696V
IGP1 = 5.5ee-7 Torr
Manually tapping up to obtain hotter internal temperature...
Wednesday, March 11, 2015, 11:33
Current conditions:
OMEGA = 1565C
TGHT = 900A, 14.3V
TBHT = 230A, 3.7V
IGP1 = 6.3e-7 Torr
Digital pyrometer readings:
Hottest point on left leg, WRT ionizer tube into page = 2400C
Internal temp of container = 1580C
Sat at this temperature ~45min.
Initiating auto-cool at TGHT 2.0A/min, TBHT 1.0A/min
[See attached photo for collected data]
Thursday, March 12, 2015, 13:12
vented and opened up this morning.
only reached a max internal temp of 1580C.
therefore added 3xTa heat shield and will re-condition at a higher temp.
currently pumping back down.
Thursday, March 12, 2015, 14:34
IGP1 = 7.0e-7 Torr
stepped up to 35A, waited ~30min, vacuum stable.
IGP1 = 6.1e-7 Torr
Initating ramp-up...
Friday, March 13, 2015, 07:47
IGP1 = 2.9e-7 Torr
reached max set points for TGHT = 600A, TBHT = 230A
Initiating manual tap-up.
Friday, March 13, 2015, 10:31
Reached 720A, 1800C at 0850
Will continue to heat for ~3hrs
[see attachment for collected data]
Friday, March 13, 2015, 12:00
Sat at max temperature, 1800C, for 3 hours.
Initiating auto-cool at 2.0A/min for TGHT and 1.0A/min for TBHT.
|
Monday, March 16, 2015, 17:38, John Wong, Ta, 38817-5, HP-SIS, Done, Conditioning Ta target
|
Laura Lambert wrote: |
Monday, March 09, 2015, 16:47
Target consists of 400 discs.
Total packed length 3.4cm
Total mass 45.8181g
Re foil inserted.
Chamber is currently being pumped down.
No Ta-heat shield wrapped.
One end-cap inserted on left (wrt ionizer into the page)
TGHT and TBHT will be ramped up to 820A/230A respectively at 2.0A/min.
Tuesday, March 10, 2015, 10:28
HS water valves opened, no leaks detected.
IGP1 = 4.5e-7 Torr.
Power supply not responding to epics...AGAIN. grrrr
Tuesday, March 10, 2015, 13:17
IOC was rebooted - back up and running again! yay!
IGP1 = 4.0e-7 Torr.
Tapped up manually to 35A, waited ~30min, vaccuum stable.
Initiating auto-ramp.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
Wednesday, March 11, 2015, 09:11
Target has been at max setpoints for ~14hrs.
OMEGA = 1472C
TGHT = 820A, 12.85V
TBHT = 230A, 3.696V
IGP1 = 5.5ee-7 Torr
Manually tapping up to obtain hotter internal temperature...
Wednesday, March 11, 2015, 11:33
Current conditions:
OMEGA = 1565C
TGHT = 900A, 14.3V
TBHT = 230A, 3.7V
IGP1 = 6.3e-7 Torr
Digital pyrometer readings:
Hottest point on left leg, WRT ionizer tube into page = 2400C
Internal temp of container = 1580C
Sat at this temperature ~45min.
Initiating auto-cool at TGHT 2.0A/min, TBHT 1.0A/min
[See attached photo for collected data]
Thursday, March 12, 2015, 13:12
vented and opened up this morning.
only reached a max internal temp of 1580C.
therefore added 3xTa heat shield and will re-condition at a higher temp.
currently pumping back down.
Thursday, March 12, 2015, 14:34
IGP1 = 7.0e-7 Torr
stepped up to 35A, waited ~30min, vacuum stable.
IGP1 = 6.1e-7 Torr
Initating ramp-up...
Friday, March 13, 2015, 07:47
IGP1 = 2.9e-7 Torr
reached max set points for TGHT = 600A, TBHT = 230A
Initiating manual tap-up.
Friday, March 13, 2015, 10:31
Reached 720A, 1800C at 0850
Will continue to heat for ~3hrs
[see attachment for collected data]
Friday, March 13, 2015, 12:00
Sat at max temperature, 1800C, for 3 hours.
Initiating auto-cool at 2.0A/min for TGHT and 1.0A/min for TBHT.
|
Monday, March 16, 2015, 17:30
Target was removed from Evap#2. It was successfully conditioned.
The other end cap was inserted and expended.
Standard salts were added. And Re foil is inserted.
Target is ready for assembly.
|
Friday, December 16, 2016, 14:14, Laura Lambert, Ta, 39530-3, LP-FEBIAD, Done, Conditioning Ta FEBIAD target for shutdown tests
|
Friday, December 16, 2016, 14:08
Target consists of 470 discs.
Total packed length 3.4cm [exactly 7.8cm space on both sides]
Total mass 45.9091g [Incl foils + Ta wire on 6 packs]
Target consists of 350 single discs and 6x20 packs of Ta discs
Discs in target are arranged as follows: 1pack / 75singles / 1pack / 100singles / 2packs / 100singles / 1pack / 75singles / 1pack
3x Ta Heat shields.
LP-FEBIAD container with large center block.
No endcaps inserted, no Rh foil inserted.
Chamber currently pumping down.
TBHT will be ramped up to 230A at 1.0A/min.
TGHT will be ramped up to 350A at 2.0A/min.
Final desired temperature = 1900C
Friday, December 16, 2016, 14:32
HS water valves opened, no leaks detected
Tapped up manually to 35A
Vacuum stable, IGP1 = 2.1e-6 Torr
Initiating auto-ramp.
OMEGA slope = 0.98
Monday, December 19, 2016, 11:52
Tapped up manually to ~1900C [see attached excel for details on data collected - interesting temperature fluctuations]
Will remain at max setpoints for min 4hrs then auto-cool
Monday, December 19, 2016, 15:20
Target has remained at max setpoints for just over 4hrs
TGHT = 520A, 8.67V
OMEGA = 1820C
IGP1 = 5.2e-7 Torr
Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
Tuesday, December 20, 2016, 11:52
Vented in air and opened up this morning.
Looks like the windows was coated in evap2, unsure if this was missed and coated before conditioning target or if this is from materials coming out during conditioning process...
Target looks good.
Endcaps inserted but not expanded.
|
|