  Evaporator_2, Page 29 of 34  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
  ID Date Author Target Material Target Oven W.O#down Source Status Subject Text Attachments
  299   Tuesday, May 24, 2016, 11:18 John WongSiC TARGET BOATIn progressHeat-treatment: Beta-SiC (1um) target discs

    

       
            
  
  313   Friday, August 12, 2016, 11:08 Laura Lambert   MaintenanceNEW PUMP FOR GLOVE BOXWednesday, August 03, 2016, 16:16
Tues July 26th had some problems
with the transfer chamber
  
  315   Thursday, August 18, 2016, 10:37 Anders Mjos   MaintenanceNew cooling lines for Heat Shield Dan made a set of new cooling lines
for the Source Tray Heat Shield cooling yesterday.
No joints on the lines. Use same VCR fitting
  
  335   Monday, October 24, 2016, 17:52 John Wongnp-SiC TARGET BOATDoneThermo test of np-SiC raw powder Monday, October 24, 2016, 17:43
Two samples were prepared and loaded
into the target boat with 1 layer of heat-shied
 Capture.JPG450A_1500C.JPG 
  336   Tuesday, November 15, 2016, 16:51 John Wongnp-SiC TARGET BOATIn progressHeat-treatment: Beta-SiC (1um) fiber mats - SAMPLE ID: A1Tuesday, November 15, 2016, 16:48
Three samples were prepared 
(see my logbook#1 page 3, preparing for carbonization).
  
  337   Thursday, November 17, 2016, 11:15 Laura Lambertnp-SiC TARGET BOATIn progressHeat-treatment: Beta-SiC (1um) fiber mats - SAMPLE ID: A1


   
        
            
  
  338   Friday, November 18, 2016, 17:28 John Wongnp-SiC TARGET BOATDoneHeat-treatment: Beta-SiC (1um) fiber mats - SAMPLE ID: A1


   
        
            
  
  342   Tuesday, December 20, 2016, 15:04 Laura Lambert   MaintenanceRETURN and SUPPLY valves CLOSED for xmas breakTuesday, December 20, 2016, 15:05
confirmed ~full tank of Ar for glove
box --> ~1600psi 
  
  344   Friday, February 03, 2017, 14:18 Laura LambertEndcaps TARGET BOATProblemsSintering TaC coating on Ta endcaps and springs Friday, February 03, 2017, 14:17
The endcaps are stacked together
 IMG_1526.JPGIMG_1527.JPG 
  345   Monday, February 06, 2017, 11:17 Anders Mjos   Problems resolvedIOC restart after power outagae Dave Morris did a remote restart
of the IOC after the outage. Turbo pump started.
  
  346   Thursday, February 09, 2017, 11:49 Laura Lambert   MaintenanceNew heatshield with flexible water lines Thursday, February 09, 2017, 11:47
A new heatshield with flexible water
lines has been put into evap2 last Friday
  
  347   Thursday, February 09, 2017, 23:28 John Wongnp-SiC TARGET BOATDoneThermotest: SiC-SiO2-Lys and SiC pelletsThursday, February 09, 2017, 23:26
There are two types of samples being
test for thermal stability:
 striptool_01.JPG 
  348   Tuesday, February 14, 2017, 15:44 Laura LambertEndcaps TARGET BOATProblems resolvedSintering TaC coating on Ta endcaps and springs

    

       
            
  
  349   Tuesday, February 14, 2017, 15:48 Laura LambertEndcaps TARGET BOATDoneSintering TaC coating on Ta endcaps and springs

    

       
            
 IMG_1542.JPGIMG_1545.JPGIMG_1549.JPGIMG_1552.JPG 
  351   Saturday, March 11, 2017, 11:58 John Wongnp-SiC TARGET BOATDoneThermo test B3 PelletsFriday, March 10, 2017, 17:29
Three B3 pellets are loaded into
the container for thermo test. 
 heating_curve_900PSI_pellet.JPG 
  353   Friday, March 31, 2017, 12:22 John Wongnp-SiC TARGET BOATIn progressThermo test: B3 Pellets (13.3K-PSI) Friday, March 31, 2017, 12:21
Two compressed pellets loaded into
the target boat and wrapped with Ta foil. 
 heating_curve_00.JPGheating_curve_13PSI_pellets_01.JPG 
  354   Wednesday, April 05, 2017, 15:42 Laura LambertEmpty TARGET BOATIn progressSintering TaC coating on evap1 target boat Wednesday, April 05, 2017, 15:36
Coated container with TaC coating
using spray technique this morning and let
  
  355   Thursday, April 06, 2017, 08:57 Laura LambertEmpty TARGET BOATProblemsSintering TaC coating on evap1 target boat

    

       
            
 Capture.JPG 
  356   Thursday, April 06, 2017, 11:15 Laura LambertEmpty TARGET BOATProblems resolvedSintering TaC coating on evap1 target boat

    

       
            
 IMG_1615.JPGIMG_1611.JPG 
  358   Thursday, April 13, 2017, 12:03 Laura LambertSiC TARGET BOATDoneSintering SiC pellets Thursday, April 13, 2017, 12:01
Pellets made this morning and weighed.
Placed in a graphite boat which is
 IMG_1657.JPGIMG_1659.JPG 