Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 24 of 35  Not logged in ELOG logo
ID Date Author Target Material Target Oven W.O# Source Status Subjectdown Text Attachments
  219   Monday, June 22, 2015, 13:11 John WongEmpty38817-6HP-SISIn progressRUSH! Sintering TaC coated container for SiC Monday, June 22, 2015, 13:00
Containers is coated with TaC. Wrapped
with 3 layers of Ta heat-shield.  Air
  
  220   Tuesday, June 23, 2015, 10:18 Laura LambertEmpty38817-6HP-SISDoneRUSH! Sintering TaC coated container for SiC

    

       
            
  
  221   Tuesday, June 23, 2015, 12:26 John WongSiC38817-6HP-SISIn progressRUSH! SiC backup target undergoes sintering processTuesday, June 23, 2015, 12:21
Target container is loaded with 485
discs of SiC with packed length of 17.4cm. 
  
  222   Thursday, June 25, 2015, 16:13 Laura LambertSiC38817-6HP-SISDoneRUSH! SiC backup target undergoes sintering process

    

       
            
 IMG_20150625_152233125.jpgIMG_20150625_152256456.jpg 
  494   Wednesday, August 05, 2020, 13:38 Aaron Schmidt    RP Swap on EVAP 2 BP1 swapped with RP2 (TS beamline)
U-line installed.
Wednesday, August 05, 2020, 13:37:
  
  342   Tuesday, December 20, 2016, 15:04 Laura Lambert   MaintenanceRETURN and SUPPLY valves CLOSED for xmas breakTuesday, December 20, 2016, 15:05
confirmed ~full tank of Ar for glove
box --> ~1600psi 
  
  174   Wednesday, January 14, 2015, 13:46 Anders MjosEmpty  MaintenancePumping down for water leak test Wednesday, January 14, 2015, 13:46:
Roughing
Wednesday, January 14, 2015, 14:57:
  
  489   Monday, July 13, 2020, 11:03 Aaron Schmidt    Pump down / leak / vacuum check. Darwin reported that he was unable
to achieve vacuum of 150mTorr. The flex-line
HS had been removed last week for modifications.
  
  498   Wednesday, August 12, 2020, 11:57 Marla CervantesEmpty44489-9TARGET BOATDonePristine Ta tube calibration Short oven loaded with additional
hardware are spacers into the flex-line HS.
  
  505   Saturday, September 05, 2020, 21:33 Marla CervantesEmpty  DonePristine Ta tube calibrationSaturday, September 05, 2020, 12:56
A Ta tube was wrapped with 3
  
  531   Friday, February 26, 2021, 09:28 Ferran Boix PamiesEmptynone DoneParasitic target thermal tests Tests were performed with external
power supply. No target boat or container.
Small power on heating small heating
  
  544   Tuesday, March 30, 2021, 19:49 Ferran Boix PamiesEmpty44139-7-SK  DoneParasitic target thermal tests 2021-03-30 7:48 Target loaded with
parasitic target only. No container. Leaving
under vacuum over night.
 20210403_174815.jpg20210403_183102.jpg 
  522   Wednesday, November 04, 2020, 17:31 Ferran Boix PamiesEmpty41882-2TARGET BOATDoneParasitic target graphite outgassing. 2020-11-04 17:31: target installed
with boat containing graphite container for
outgassing. Roughing pump on.
  
  495   Wednesday, August 05, 2020, 19:14 Ferran Boix PamiesEmpty41882-1TARGET BOATDoneParasitic target cooling test 2020-08-05 7.13pm Roughing pump on
2020-08-06 10:48am Turbo was turned
on by Marla in the morning. Vacuum IGP1 4e-6Torr.
  
  379   Tuesday, July 18, 2017, 15:30 Laura Lambert   MaintenancePaddle wheel replacement for all evap2 water supplies Tuesday, July 18, 2017, 15:26
Problems occured with TGHT water
supply paddle wheel stopped and therefore
  
  475   Wednesday, March 04, 2020, 14:33 Aaron Schmidt   MaintenancePS swap out The TGHT PS was found to be defective.
It was uninstalled w/ Joel S: 
  
  572   Sunday, April 17, 2022, 10:37 Ferran Boix PamiesEmptyTa boat used for annealingTARGET BOATDonePEEK samples heat test Thursday, April 14, 2022, 10:36 Setup,
PEEK samples installed on heatshield with
TC. Pump down over the weekend.
  
  574   Monday, April 25, 2022, 08:31 Ferran Boix PamiesEmptyTa boat used for annealingTARGET BOATDonePEEK sample test 2Setup in vacuum over the weekend.
Monday, April 25, 2022, 08:31 IGP1:6.7e-7T
. Ramping up 1A/10s to 500A. 
  
  172   Wednesday, November 26, 2014, 14:09 Laura Lambert   MaintenanceOMEGA-IR dark patch and backing pump trip Wednesday, November
26, 2014, 13:47
 IR_focus.jpeg 
  599   Tuesday, November 01, 2022, 17:35 John WongTiC TARGET BOATDoneNp-TiC fibres systhesisTuesday, November 01, 2022, 17:24
2 samples of np-TiO2/C fibres were
produced using the e-spinner.  Each
 TiO2_C_fibres_carbonization_elog599.png 
ELOG V2.9.2-2455