  Evaporator_2, Page 22 of 35  Not logged in ELOG logo
ID Date Author Target Material Target Oven W.O# Sourcedown Status Subject Text Attachments
  221   Tuesday, June 23, 2015, 12:26 John WongSiC38817-6HP-SISIn progressRUSH! SiC backup target undergoes sintering processTuesday, June 23, 2015, 12:21
Target container is loaded with 485
discs of SiC with packed length of 17.4cm. 
  
  222   Thursday, June 25, 2015, 16:13 Laura LambertSiC38817-6HP-SISDoneRUSH! SiC backup target undergoes sintering process

    

       
            
 IMG_20150625_152233125.jpgIMG_20150625_152256456.jpg 
  236   Tuesday, August 18, 2015, 16:02 Laura LambertTa HP-SISIn progressConditioning Ta#46 TargetTuesday, August 18, 2015, 15:53
Target consists of 505 discs.
Total packed length 3.4cm.
  
  237   Wednesday, August 19, 2015, 17:26 John WongTa HP-SISIn progressConditioning Ta#46 Target

    

       
            
  
  238   Thursday, August 20, 2015, 10:07 Laura LambertTa HP-SISIn progressConditioning Ta#46 Target

    

       
            
  
  239   Thursday, August 20, 2015, 17:15 John WongTa HP-SISDoneConditioning Ta#46 Target

    

       
            
  
  267   Wednesday, December 16, 2015, 10:22 Laura LambertTa41369-5HP-SISDoneConditioning back-up Ta Target & emissivity measurements Wednesday, December 16, 2015, 10:09
Target consists of 505 discs.
  
  268   Thursday, January 07, 2016, 09:19 Aurelia LaxdalTa41369-5HP-SISIn progressTemperature measurementsTemperature measurements in progress this
week for Ta HP-SIS.
See attachment for the current settings
 Jan_9_and_10_2016_measurements.docx 
  269   Friday, January 08, 2016, 11:15 Laura LambertTa41369-5HP-SISDoneTemperature measurements

    

       
            
  
  300   Wednesday, May 25, 2016, 11:40 Laura LambertEmpty41369-4HP-SISIn progresssintering TaC coating on SiC#33 container Wednesday, May 25, 2016, 11:37
Container coated with TaC using
  
  301   Tuesday, May 31, 2016, 11:10 John WongEmpty41369-4HP-SISDonesintering TaC coating on SiC#33 container

    

       
            
  
  302   Thursday, June 09, 2016, 15:48 Laura LambertSiC41369-4HP-SISIn progressSintering SiC#33 - 1st beta-SiC target! Thursday, June 09, 2016, 15:39
First target using beta-SiC material!
 target_with_end-coils.jpg 
  303   Friday, June 10, 2016, 16:30 John WongSiC41369-4HP-SISIn progressSintering SiC#33 - 1st beta-SiC target! 

  
  304   Monday, June 13, 2016, 09:53 Laura LambertSiC41369-4HP-SISIn progressSintering SiC#33 - 1st beta-SiC target!

    

       
            
 current_vs_voltage_vs_temp.xlsxTapping_up_from_520A_to_1800C.JPG 
  305   Wednesday, June 15, 2016, 17:58 John WongSiC41369-4HP-SISIn progressSintering SiC#33 - 1st beta-SiC target!

    

       
            
  
  306   Thursday, June 16, 2016, 10:58 Laura LambertSiC41369-4HP-SISDoneSintering SiC#33 - 1st beta-SiC target!

    

       
            
  
  307   Thursday, June 16, 2016, 11:01 Laura LambertSiC41369-4HP-SISDoneConditioning SiC#33 - 1st beta SiC target! Thursday, June 16, 2016, 10:59
Previously sintered over weekend
[see elog i.d 306]
 9x 
  310   Tuesday, July 26, 2016, 16:53 Laura LambertTa41369-6HP-SISDoneConditioning Ta#49 Tuesday, July 26, 2016, 16:50
loaded into evap2
pumped down, HS water valves opened,
  
  319   Wednesday, September 07, 2016, 15:02 John WongEmpty39530-9HP-SISIn progressSintering TaC coating container for SiC Target  Wednesday, September 07, 2016, 14:45
Container was previously coated with
TaC solution and wrapped with 1-full length
 coating_chipped_off.JPGautoTaC_sintering_20.JPEGcoating_chipped_off_2.JPG 
  320   Monday, September 12, 2016, 17:22 John WongEmpty39530-9HP-SISFailedTaC coating chipped off

    

       
            
 Screen_Shot_2016-09-12_at_4.52.53_PM.png 