  71   Tuesday, April 30, 2013, 11:20 Anders MjosEmpty38481-5HP-FEBIADDoneCTL thermal test

 CTL block on T/C F/T Ch 1
Supply on Ch 3
HS Return on Ch 4

Tuesday, April 30, 2013, 11:20: Roughing

Tuesday, April 30, 2013, 11:45: Turbo started


Wednesday, May 01, 2013, 08:43: Cooling water opened. Vacuum stable at 5.1E-7 T (IGP1)

Wednesday, May 01, 2013, 08:48: Ramping TGHT and TBHT to 850A and 300A at 1A/60s


Thursday, May 02, 2013, 09:10: TGHT reached voltage limit (12V) at ~780A yesterday at ~10pm. Increased limit to 12.5V and continued auto ramping. CTL block temp ~80C

Thursday, May 02, 2013, 10:08: TGHT voltage limit changed to 13V. TGHT:RDCUR goes to ~810A with TGHT:RDVOL at 12.5V. CTL block temp ~80C

Thursday, May 02, 2013, 11:33: TGHT manually stepped to 850A RDCUR at 846A, RDVOL at 13.1V. CTL block temp ~84C

Thursday, May 02, 2013, 15:13: Ramping down TGHT and TBHT to 580A and 280A at 2A/min and 1A/min


Friday, May 03, 2013, 08:30:  TGHT and TBHT at 580A and 280A. CTL block temp ~60C 

Friday, May 03, 2013, 08:37: Ramping down TGHT and TBHT to 0 at 2/min and 1A/min

Friday, May 03, 2013, 11:04: T/C logger removed


Monday, May 06, 2013, 09:37: Turbo stopped.

Monday, May 06, 2013, 10:26: Venting

Attachment 1: StripTool_2013-05-02.png
StripTool_2013-05-02.png
Attachment 2: CTL_ITD0431_Evap2.pdf
CTL_ITD0431_Evap2.pdf
Attachment 3: 2013-04-30_Evap2_ITD0431_CTL_Thermal_Test.pdf
2013-04-30_Evap2_ITD0431_CTL_Thermal_Test.pdf
  75   Tuesday, May 14, 2013, 17:15 John WongEmpty38481-6HP-FEBIADDoneSinteringTaC coating

Tuesday, May 14, 2013, 17:04

Target oven is coated with TaC, and wrapped with 3-Ta heat shields.

TGHT and TBHT will be ramped up to 820A and 300A, respectively.

Ramping rate set to 1A/min.

Good Vac at 3.e-5 Torr, Bad Vac @ 4.0e-5 Torr.

Chamber is currently being pumped...


 Wednesday, May 15, 2013, 10:56

Chamber has pumped down to 4.5e-7 Torr. 

HS cooling water valves opened; no leaks were detected.

Stepping up TGHT/TBHT to 80A; monitoring vacuum.


 Wednesday, May 15, 2013, 11:26

Pressure is increasing.  TGHT setpoint @ 80A, readback @ 88.6A/0.603V, local @ 83A/0.80V.


 Wednesday, May 15, 2013, 12:08

TGHT/TBHT stepped up to 140A and tripped off at high limit vacuum.

Restarted p/s and set TBHT/TGHT at 100A

Initiated auto ramping...


 Friday, May 17, 2013, 11:39

TGHT and TBHT reached to 820A and 300A, respectively.  Target has been heating at the max currents for ~12hrs. 

Vacuum is coming down to 4.3e-7 Torr. 

The TaC coating sintering is completed.

Autocooling is initiated.  TGHT ramping rate @ 2A/min, and 1A/min for TBHT.


Wednesday, May 22, 2013, 10:43

Sintering complete.

Chamber will be vented


 

  79   Monday, July 22, 2013, 15:03 John WongEmpty38634-7LP-SISDoneSintering empty target oven coated with TaC for UCx#7

Monday, July 22, 2013, 15:00

Target container is coated with TaC - this container will be used for UCx#7.

Container is wrapped with 3 layers of Ta, including the back-block.

For the sintering process:

TGHT will be ramped up to 580A at 0.2A/min

TBHT will be ramped up to 230A at 0.2A/min.

Chamber has been pumped down.  HS cooling H2O valves are opened, and no leaks are detected. 

Currently IGP1 @ 7.03e-6 Torr. 


 Monday, July 22, 2013, 15:19

TGHT/TBHT was stepped up to 20A.  Pressure increased to ~1.2e-5 Torr.

Auto-ramping initiated...


 Wednesday, July 24, 2013, 18:40

TGHT and TBHT have reached to 580A/230A, respectively.  Target has been heated for ~4 hours at that max current.

Vacuum currently at 1.65e-6 Torr.

Auto-cooling initiated... (TGHT @ -1A/min, TBHT -0.5A/min)

Target will be vented in air tomorrow.


 

  90   Thursday, September 26, 2013, 15:17 John WongEmpty39814-VI-?LP-IG-LISDoneSintering empty target oven coated with TaC for UCx#8

Thursday, September 26, 2013, 13:04

The LP-IG-LIS target container is coated with TaC. 

Container is wrapped with 3 layers of Ta heat shield and about to go through the sintering process.

A thermocouple is inserted to measure the temperature inside the tube (1st attempt ever). 

Click on the link for detailed pictures:

https://www.dropbox.com/sh/6dc5arajg87mws9/6cU5OxjkZg


TGHT will be ramped up to 580A at 0.2A/min

TBHT will be ramped up to 230A at 0.2A/min.

Chamber has been pumped down.  HS cooling H2O valves are opened, and no leaks are detected. 

Currently IGP1 @ 5.9e-6 Torr.


 Thursday, September 26, 2013, 15:44

TGHT stepped up to 30A.  TBHT currently @ 0A. 

Temp @ 35C, Vac @ 1.4e-5 Torr.


 Monday, September 30, 2013, 14:54

The container was heated up to 580A TGHT/ 230A TBHT for a day (see attachment #1 for vac vs cur plot).

The temperature was measure at ~1780C. (see link for details: https://www.dropbox.com/sh/d8d9j2t60qlm3jk/nkMh7dx_R8 )

The target was cooled down and vented. 

Proceed complete.


 

 

Attachment 1: UCx#8_container_TaC_coat_sintering.PNG
UCx#8_container_TaC_coat_sintering.PNG
  91   Friday, October 04, 2013, 16:21 John WongEmpty LP-SISDoneSintering TaC coating on a LP target container to be used for C-grv tube test

Friday, October 04, 2013, 15:37

A LP target container is coated with TaC.  The container is wrapped with 3 layers to heat shield.  

This container will be used for the graphite tube test.  

Chamber is being pumped down.

 The HS cooling water valves are open and no leaks are detected. 


 

TGHT will be ramped up to 580A at 0.2A/min

TBHT will be ramped up to 230A at 0.2A/min.

The temperature will be monitored and measured. 


 Sunday, October 06, 2013, 19:55

 
TGHT and TBHT have reached to 580A/230A, respectively.  And the target has been heated for about 5 hours.  
 
The temperature inside the tube is measure at 1000C; this is much lower than expected as to previously measured at 1700C.
 
The temperature outside the container is at 1400C.

I'm suspecting the thermocouple inside the tube could be shorted.  
 
Cooling down the heaters down to zero at 2A/min for TGHT and 1A/min for TBHT. 
 
Tomorrow, the chamber will be vented and the target will be inspected.  
 
I like to re-adjust the thermocouple again, and re-heat the target back up, hoping to reach 1700C at TGHT = 580A.  

 Monday, October 07, 2013, 15:24
 
The sintering of the TaC coating is complete.
 
The chamber was vented this morning.  Apparently, there was a short in the thermocouple so the temperature measure was recorded much lower.
 
The thermocouples are adjusted, and the chamber is pumped down. 
 
Vac currently at 1.17e-6 Torr. 
 
TGHT and TBHT will be ramped up to 580A/230A at 2A/min. 
 
Continue monitoring the temperature...

 Monday, October 07, 2013, 16:13
 
TGHT and TBHT were ramped up to 90A.  Temperature inside the tube was measure just at 75C and the outside surface was at 207C.
Maybe the thermocouple is F up; will replace with a new one tomorrow.
Cooling down the target down...

Tuesday, October 22, 2013, 16:49

The target was heated up to 580A and the temperature inside the tube was measured to be ~1800C and the outside surface was ~1400C.

The target was cooled down.  Then the graphite tube was inserted.

There are two thermcouples inserted inside the tube on both ends.

Chamber has been pumped down to 4.33 e-7 Torr.  No leaks were detected.

Target will be heated up again to TGHT @ 580A / TBHT @ 230A at 0.2A/min.

The temperatures will be monitored.

T1 = left (floating)

T2 = right (toughing C-grv tube)

(wtf ionizer pointing into the page).


 Thursday, October 24, 2013, 16:35

TGHT/TBHT reached to 580A/230A. 

T1 = 1642C

T2 = Error?? Reading goes on/off intermittently, showing 900 - 1900C


Thursday, October 24, 2013, 16:45 

Ramping up TGHT to 680A to see if T1 can reach 1700C.

IG1 currently at 5.2e-7 Torr.


 Friday, October 25, 2013, 12:30

TGHT was ramped up to 632A (stopped due to voltage limiting). 

T1 was measured at 1960C.  Vac went up as it was heated up.  (see attachment #2)

Target was cooled down at 5A/min, now at 0A.

The chamber will be vented and the target will be inspected.

This run is complete.


 

Attachment 1: LP_C_grv_tempcurve.PNG
LP_C_grv_tempcurve.PNG
Attachment 2: LP_C_grv_TGHT632_1960C.PNG
LP_C_grv_TGHT632_1960C.PNG
  97   Wednesday, January 15, 2014, 17:45 John WongEmpty39165-9LP-SISIn progressSintering TaC coating container

 Wednesday, January 15, 2014, 17:30

Target container is coated with TaC.  No Ta-heat shields are used.

TGHT will be ramped up to 580A at 0.2A/min. 

TBHT will be ramped up to 230A at 0.2A/min.  

 Chamber is currently being pumped.  Tomorrow, the HS water valve can be opened to test for leaks.  

Notes: 

If everything is fine, TGHT/TBHT can be stepped up to 30A-50A.  Watch for the vacuum; once it's stable the auto ramping program can be initiated.  

Once TGHT/TBHT reached above 200A, the ramping rate for TGHT can be increased up to 2A/min.  (This step is to speed up the process; however it's not mandatory) 


 

  98   Thursday, January 16, 2014, 13:06 Laura LambertEmpty39165-9LP-SISIn progressSintering TaC coating container

John Wong wrote:

 Wednesday, January 15, 2014, 17:30

Target container is coated with TaC.  No Ta-heat shields are used.

TGHT will be ramped up to 580A at 0.2A/min. 

TBHT will be ramped up to 230A at 0.2A/min.  

 Chamber is currently being pumped.  Tomorrow, the HS water valve can be opened to test for leaks.  

Notes: 

If everything is fine, TGHT/TBHT can be stepped up to 30A-50A.  Watch for the vacuum; once it's stable the auto ramping program can be initiated.  

Once TGHT/TBHT reached above 200A, the ramping rate for TGHT can be increased up to 2A/min.  (This step is to speed up the process; however it's not mandatory) 


 

 Thursday, January 16, 2014, 11:35

Chamber was pumped down overnight to 10-7 Torr. HS water valve was opened and no leak in vacuum was observed.

TGHT and TBHT were stepped up to 35A. Waited ~30min, current stabilized and vacuum starting to drop.

Initiating auto-ramping: Good Vac = 2.0e-5 Torr, Bad Vac = 3.0e-5 Torr.


 

  99   Friday, January 17, 2014, 09:34 John WongEmpty39165-9LP-SISIn progressSintering TaC coating container

Laura Lambert wrote:

John Wong wrote:

 Wednesday, January 15, 2014, 17:30

Target container is coated with TaC.  No Ta-heat shields are used.

TGHT will be ramped up to 580A at 0.2A/min. 

TBHT will be ramped up to 230A at 0.2A/min.  

 Chamber is currently being pumped.  Tomorrow, the HS water valve can be opened to test for leaks.  

Notes: 

If everything is fine, TGHT/TBHT can be stepped up to 30A-50A.  Watch for the vacuum; once it's stable the auto ramping program can be initiated.  

Once TGHT/TBHT reached above 200A, the ramping rate for TGHT can be increased up to 2A/min.  (This step is to speed up the process; however it's not mandatory) 


 

 Thursday, January 16, 2014, 11:35

Chamber was pumped down overnight to 10-7 Torr. HS water valve was opened and no leak in vacuum was observed.

TGHT and TBHT were stepped up to 35A. Waited ~30min, current stabilized and vacuum starting to drop.

Initiating auto-ramping: Good Vac = 2.0e-5 Torr, Bad Vac = 3.0e-5 Torr.


 

 Friday, January 17, 2014, 09:28

TGHT/TBHT @ 300/200A.  TBHT voltage is limited at 3A.  

TGHT ramping rate increased to 2A/min.  Pressure @ 4.5e-7 Torr.  


 

  100   Friday, January 17, 2014, 10:18 Laura LambertEmpty39165-9LP-SISIn progressSintering TaC coating container

John Wong wrote:

Laura Lambert wrote:

John Wong wrote:

 Wednesday, January 15, 2014, 17:30

Target container is coated with TaC.  No Ta-heat shields are used.

TGHT will be ramped up to 580A at 0.2A/min. 

TBHT will be ramped up to 230A at 0.2A/min.  

 Chamber is currently being pumped.  Tomorrow, the HS water valve can be opened to test for leaks.  

Notes: 

If everything is fine, TGHT/TBHT can be stepped up to 30A-50A.  Watch for the vacuum; once it's stable the auto ramping program can be initiated.  

Once TGHT/TBHT reached above 200A, the ramping rate for TGHT can be increased up to 2A/min.  (This step is to speed up the process; however it's not mandatory) 


 

 Thursday, January 16, 2014, 11:35

Chamber was pumped down overnight to 10-7 Torr. HS water valve was opened and no leak in vacuum was observed.

TGHT and TBHT were stepped up to 35A. Waited ~30min, current stabilized and vacuum starting to drop.

Initiating auto-ramping: Good Vac = 2.0e-5 Torr, Bad Vac = 3.0e-5 Torr.


 

 Friday, January 17, 2014, 09:28

TGHT/TBHT @ 300/200A.  TBHT voltage is limited at 3A.  

TGHT ramping rate increased to 2A/min.  Pressure @ 4.5e-7 Torr.  


 

 Friday, January 17, 2014, 10:14

TBHT stopped at 200A with voltage limit sitting at 3V.

Aborted auto-ramp, changed the voltage limit to 5V and increased ramping rate to 2A/min. Re-started auto-ramp.

IGP1 @ 5.0e-7 Torr

  101   Friday, January 17, 2014, 12:52 John WongEmpty39165-9LP-SISIn progressSintering TaC coating container

Laura Lambert wrote:

John Wong wrote:

Laura Lambert wrote:

John Wong wrote:

 Wednesday, January 15, 2014, 17:30

Target container is coated with TaC.  No Ta-heat shields are used.

TGHT will be ramped up to 580A at 0.2A/min. 

TBHT will be ramped up to 230A at 0.2A/min.  

 Chamber is currently being pumped.  Tomorrow, the HS water valve can be opened to test for leaks.  

Notes: 

If everything is fine, TGHT/TBHT can be stepped up to 30A-50A.  Watch for the vacuum; once it's stable the auto ramping program can be initiated.  

Once TGHT/TBHT reached above 200A, the ramping rate for TGHT can be increased up to 2A/min.  (This step is to speed up the process; however it's not mandatory) 


 

 Thursday, January 16, 2014, 11:35

Chamber was pumped down overnight to 10-7 Torr. HS water valve was opened and no leak in vacuum was observed.

TGHT and TBHT were stepped up to 35A. Waited ~30min, current stabilized and vacuum starting to drop.

Initiating auto-ramping: Good Vac = 2.0e-5 Torr, Bad Vac = 3.0e-5 Torr.


 

 Friday, January 17, 2014, 09:28

TGHT/TBHT @ 300/200A.  TBHT voltage is limited at 3A.  

TGHT ramping rate increased to 2A/min.  Pressure @ 4.5e-7 Torr.  


 

 Friday, January 17, 2014, 10:14

TBHT stopped at 200A with voltage limit sitting at 3V.

Aborted auto-ramp, changed the voltage limit to 5V and increased ramping rate to 2A/min. Re-started auto-ramp.

IGP1 @ 5.0e-7 Torr

 Friday, January 17, 2014, 12:45

TGHT voltage limiting at 9.9V, and  current stayed at 560A.  Increased the TGHT voltage to 10.5V and continued ramping the heater up.

TGHT/TBHT stabilized at 580A (~10V) and 230A(3.6V). 

Pressure at 1.03e-6 Torr and coming down... 

Target will be heated until 5pm (4hrs) before cooling down at the ramping rate of 2A/min. 

Chamber will be vented in air, next week.


 Friday, January 17, 2014, 16:51

Auto-cooling initiated at 2A/min.

Vac @ 5.3e-7 Torr.


 

  102   Monday, January 20, 2014, 16:30 Laura LambertEmpty39165-9LP-SISDoneSintering TaC coating container

John Wong wrote:

Laura Lambert wrote:

John Wong wrote:

Laura Lambert wrote:

John Wong wrote:

 Wednesday, January 15, 2014, 17:30

Target container is coated with TaC.  No Ta-heat shields are used.

TGHT will be ramped up to 580A at 0.2A/min. 

TBHT will be ramped up to 230A at 0.2A/min.  

 Chamber is currently being pumped.  Tomorrow, the HS water valve can be opened to test for leaks.  

Notes: 

If everything is fine, TGHT/TBHT can be stepped up to 30A-50A.  Watch for the vacuum; once it's stable the auto ramping program can be initiated.  

Once TGHT/TBHT reached above 200A, the ramping rate for TGHT can be increased up to 2A/min.  (This step is to speed up the process; however it's not mandatory) 


 

 Thursday, January 16, 2014, 11:35

Chamber was pumped down overnight to 10-7 Torr. HS water valve was opened and no leak in vacuum was observed.

TGHT and TBHT were stepped up to 35A. Waited ~30min, current stabilized and vacuum starting to drop.

Initiating auto-ramping: Good Vac = 2.0e-5 Torr, Bad Vac = 3.0e-5 Torr.


 

 Friday, January 17, 2014, 09:28

TGHT/TBHT @ 300/200A.  TBHT voltage is limited at 3A.  

TGHT ramping rate increased to 2A/min.  Pressure @ 4.5e-7 Torr.  


 

 Friday, January 17, 2014, 10:14

TBHT stopped at 200A with voltage limit sitting at 3V.

Aborted auto-ramp, changed the voltage limit to 5V and increased ramping rate to 2A/min. Re-started auto-ramp.

IGP1 @ 5.0e-7 Torr

 Friday, January 17, 2014, 12:45

TGHT voltage limiting at 9.9V, and  current stayed at 560A.  Increased the TGHT voltage to 10.5V and continued ramping the heater up.

TGHT/TBHT stabilized at 850A (~10V) and 230A(3.6V). 

Pressure at 1.03e-6 Torr and coming down... 

Target will be heated until 5pm (4hrs) before cooling down at the ramping rate of 2A/min. 

Chamber will be vented in air, next week.


 Friday, January 17, 2014, 16:51

Auto-cooling initiated at 2A/min.

Vac @ 5.3e-7 Torr.


 

 

  103   Monday, January 20, 2014, 16:35 Laura LambertEmptyTa-Target boat  Sintering Ta target boat with TaC coating

 Monday, January 20, 2014, 16:32

A new target boat was sprayed with TaC coating and let dry this morning.

The target boat is NOT wrapped with Ta-heat shield.

The boat was installed in Evap#2, chamber is currently being pumped down overnight.


 

  104   Tuesday, January 21, 2014, 11:33 Laura LambertEmpty40282-4TARGET BOAT Sintering Ta target boat with TaC coating

Laura Lambert wrote:

 Monday, January 20, 2014, 16:32

A new target boat was sprayed with TaC coating and let dry this morning.

The target boat is NOT wrapped with Ta-heat shield.

The boat was installed in Evap#2, chamber is currently being pumped down overnight.


 

 Tuesday, January 21, 2014, 11:10

Chamber was pumped down to ~2e-7 Torr. HS cooling water valves were opened, no leaks detected.

TGHT was stepped up to 35A, voltage max set at 13V. TBHT currently @ 0A.

Waited ~20min, current stabilized, vacuum started to drop, auto-ramp initiated at 2.0A/min and max setpoint to 700A.

Good vacuum: 3.00e-5 Torr, Bad vacuum 4.00e-5 Torr.


 

  105   Tuesday, January 21, 2014, 11:56 Laura LambertEmpty40282-4TARGET BOAT Sintering Ta target boat with TaC coating

Laura Lambert wrote:

Laura Lambert wrote:

 Monday, January 20, 2014, 16:32

A new target boat was sprayed with TaC coating and let dry this morning.

The target boat is NOT wrapped with Ta-heat shield.

The boat was installed in Evap#2, chamber is currently being pumped down overnight.


 

 Tuesday, January 21, 2014, 11:10

Chamber was pumped down to ~2e-7 Torr. HS cooling water valves were opened, no leaks detected.

TGHT was stepped up to 35A, voltage max set at 13V. TBHT currently @ 0A.

Waited ~20min, current stabilized, vacuum started to drop, auto-ramp initiated at 2.0A/min and max setpoint to 700A.

Good vacuum: 3.00e-5 Torr, Bad vacuum 4.00e-5 Torr.


 

 Tuesday, January 21, 2014, 11:51

Vacuum was grumpy and was well on it's way to tripping off [reached 5e-5 Torr], auto ramping was stopped at ~95A and quickly stepped down to 90A to avoid tripping it off.

Allowed vacuum to settle back down to 2.3e-6 Torr. Auto ramping changed to 0.2A/min and re-started.

 close-call!


 

  106   Wednesday, January 22, 2014, 09:49 Laura LambertEmpty40282-4TARGET BOAT Sintering Ta target boat with TaC coating

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

 Monday, January 20, 2014, 16:32

A new target boat was sprayed with TaC coating and let dry this morning.

The target boat is NOT wrapped with Ta-heat shield.

The boat was installed in Evap#2, chamber is currently being pumped down overnight.


 

 Tuesday, January 21, 2014, 11:10

Chamber was pumped down to ~2e-7 Torr. HS cooling water valves were opened, no leaks detected.

TGHT was stepped up to 35A, voltage max set at 13V. TBHT currently @ 0A.

Waited ~20min, current stabilized, vacuum started to drop, auto-ramp initiated at 2.0A/min and max setpoint to 700A.

Good vacuum: 3.00e-5 Torr, Bad vacuum 4.00e-5 Torr.


 

 Tuesday, January 21, 2014, 11:51

Vacuum was grumpy and was well on it's way to tripping off [reached 5e-5 Torr], auto ramping was stopped at ~95A and quickly stepped down to 90A to avoid tripping it off.

Allowed vacuum to settle back down to 2.3e-6 Torr. Auto ramping changed to 0.2A/min and re-started.

 close-call!


 

 Wednesday, January 22, 2014, 09:46

TGHT has been slowly ramping up overnight at a rate of 0.2A/min.

IGP1 = 2.9e-7 Torr, TGHT = 342A; stepping ramping rate up to 2.0A/min.


 

  107   Wednesday, January 22, 2014, 13:46 Laura LambertEmpty40282-4TARGET BOAT Sintering Ta target boat with TaC coating

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

 Monday, January 20, 2014, 16:32

A new target boat was sprayed with TaC coating and let dry this morning.

The target boat is NOT wrapped with Ta-heat shield.

The boat was installed in Evap#2, chamber is currently being pumped down overnight.


 

 Tuesday, January 21, 2014, 11:10

Chamber was pumped down to ~2e-7 Torr. HS cooling water valves were opened, no leaks detected.

TGHT was stepped up to 35A, voltage max set at 13V. TBHT currently @ 0A.

Waited ~20min, current stabilized, vacuum started to drop, auto-ramp initiated at 2.0A/min and max setpoint to 700A.

Good vacuum: 3.00e-5 Torr, Bad vacuum 4.00e-5 Torr.


 

 Tuesday, January 21, 2014, 11:51

Vacuum was grumpy and was well on it's way to tripping off [reached 5e-5 Torr], auto ramping was stopped at ~95A and quickly stepped down to 90A to avoid tripping it off.

Allowed vacuum to settle back down to 2.3e-6 Torr. Auto ramping changed to 0.2A/min and re-started.

 close-call!


 

 Wednesday, January 22, 2014, 09:46

TGHT has been slowly ramping up overnight at a rate of 0.2A/min.

IGP1 = 2.9e-7 Torr, TGHT = 342A; stepping ramping rate up to 2.0A/min.


 

 Wednesday, January 22, 2014, 13:43

TGHT is sitting at 693A, IGP1 = 1.3e-6 Torr.

Stepping up TGHT voltage up to 14V from 13.05V to reach the max current of 700A.


 

  108   Wednesday, January 22, 2014, 15:13 John WongEmpty40282-4TARGET BOAT Sintering Ta target boat with TaC coating

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

 Monday, January 20, 2014, 16:32

A new target boat was sprayed with TaC coating and let dry this morning.

The target boat is NOT wrapped with Ta-heat shield.

The boat was installed in Evap#2, chamber is currently being pumped down overnight.


 

 Tuesday, January 21, 2014, 11:10

Chamber was pumped down to ~2e-7 Torr. HS cooling water valves were opened, no leaks detected.

TGHT was stepped up to 35A, voltage max set at 13V. TBHT currently @ 0A.

Waited ~20min, current stabilized, vacuum started to drop, auto-ramp initiated at 2.0A/min and max setpoint to 700A.

Good vacuum: 3.00e-5 Torr, Bad vacuum 4.00e-5 Torr.


 

 Tuesday, January 21, 2014, 11:51

Vacuum was grumpy and was well on it's way to tripping off [reached 5e-5 Torr], auto ramping was stopped at ~95A and quickly stepped down to 90A to avoid tripping it off.

Allowed vacuum to settle back down to 2.3e-6 Torr. Auto ramping changed to 0.2A/min and re-started.

 close-call!


 

 Wednesday, January 22, 2014, 09:46

TGHT has been slowly ramping up overnight at a rate of 0.2A/min.

IGP1 = 2.9e-7 Torr, TGHT = 342A; stepping ramping rate up to 2.0A/min.


 

 Wednesday, January 22, 2014, 13:43

TGHT is sitting at 693A, IGP1 = 1.3e-6 Torr.

Stepping up TGHT voltage up to 14V from 13.05V to reach the max current of 700A.


 

 Wednesday, January 22, 2014, 15:09

TGHT reached to 700A/12.83V.  Local temperature on the boat surface was measured at ~1500C.

Note: This is the "old" design boat.  The new design boat was able to heat up to 900A/16.88 - the temperature was measured at about 1500C.  (see elog: https://elog.triumf.ca/TIS/Evaporator_2/15)

Target will be heated for a few hours and will be cooled down later tonight.

The chamber will be vented tomorrow and the boat will be inspected.


 

  109   Wednesday, January 22, 2014, 18:22 John WongEmpty40282-4TARGET BOATProblemsSintering Ta target boat with TaC coating (IEVAP2:TBHT2 water signal problem)

John Wong wrote:

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

 Monday, January 20, 2014, 16:32

A new target boat was sprayed with TaC coating and let dry this morning.

The target boat is NOT wrapped with Ta-heat shield.

The boat was installed in Evap#2, chamber is currently being pumped down overnight.


 

 Tuesday, January 21, 2014, 11:10

Chamber was pumped down to ~2e-7 Torr. HS cooling water valves were opened, no leaks detected.

TGHT was stepped up to 35A, voltage max set at 13V. TBHT currently @ 0A.

Waited ~20min, current stabilized, vacuum started to drop, auto-ramp initiated at 2.0A/min and max setpoint to 700A.

Good vacuum: 3.00e-5 Torr, Bad vacuum 4.00e-5 Torr.


 

 Tuesday, January 21, 2014, 11:51

Vacuum was grumpy and was well on it's way to tripping off [reached 5e-5 Torr], auto ramping was stopped at ~95A and quickly stepped down to 90A to avoid tripping it off.

Allowed vacuum to settle back down to 2.3e-6 Torr. Auto ramping changed to 0.2A/min and re-started.

 close-call!


 

 Wednesday, January 22, 2014, 09:46

TGHT has been slowly ramping up overnight at a rate of 0.2A/min.

IGP1 = 2.9e-7 Torr, TGHT = 342A; stepping ramping rate up to 2.0A/min.


 

 Wednesday, January 22, 2014, 13:43

TGHT is sitting at 693A, IGP1 = 1.3e-6 Torr.

Stepping up TGHT voltage up to 14V from 13.05V to reach the max current of 700A.


 

 Wednesday, January 22, 2014, 15:09

TGHT reached to 700A/12.83V.  Local temperature on the boat surface was measured at ~1500C.

Target will be heated for a few hours and will be cooled down later tonight.

The chamber will be vented tomorrow and the boat will be inspected.


 

 Wednesday, January 22, 2014, 18:09

After the boat was heated for ~4hrs, TGHT tripped off on IEVAP2:TBHT2 (see attachment #1, #2). 

Tried clearing the water interlock via EPICS - failed to clear.  Checked the local water valves - ALL VALVES are OPEN 

Tried closing and re-opening the IEVAP2:TBHT2 valves, interlock cleared after a few minutes. 

Maybe a fault in the water signal.  If it happens again, the water signal should be replaced.

Turned back on the power supply - TGHT current/voltage are holding.  Target boat may be OK!

Chamber is a bit warm now.  Will allow time to cool down.

Will vent the chamber tomorrow and the boat will be inspected. 


 

Attachment 1: Screen_Shot_2014-01-22_at_6.10.50_PM.png
Screen_Shot_2014-01-22_at_6.10.50_PM.png
Attachment 2: Targetboat_heatingup2.JPEG
Targetboat_heatingup2.JPEG
  110   Thursday, January 23, 2014, 16:22 Laura LambertEmpty40282-4TARGET BOATProblems resolvedSintering Ta target boat with TaC coating

John Wong wrote:

John Wong wrote:

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

 Monday, January 20, 2014, 16:32

A new target boat was sprayed with TaC coating and let dry this morning.

The target boat is NOT wrapped with Ta-heat shield.

The boat was installed in Evap#2, chamber is currently being pumped down overnight.


 

 Tuesday, January 21, 2014, 11:10

Chamber was pumped down to ~2e-7 Torr. HS cooling water valves were opened, no leaks detected.

TGHT was stepped up to 35A, voltage max set at 13V. TBHT currently @ 0A.

Waited ~20min, current stabilized, vacuum started to drop, auto-ramp initiated at 2.0A/min and max setpoint to 700A.

Good vacuum: 3.00e-5 Torr, Bad vacuum 4.00e-5 Torr.


 

 Tuesday, January 21, 2014, 11:51

Vacuum was grumpy and was well on it's way to tripping off [reached 5e-5 Torr], auto ramping was stopped at ~95A and quickly stepped down to 90A to avoid tripping it off.

Allowed vacuum to settle back down to 2.3e-6 Torr. Auto ramping changed to 0.2A/min and re-started.

 close-call!


 

 Wednesday, January 22, 2014, 09:46

TGHT has been slowly ramping up overnight at a rate of 0.2A/min.

IGP1 = 2.9e-7 Torr, TGHT = 342A; stepping ramping rate up to 2.0A/min.


 

 Wednesday, January 22, 2014, 13:43

TGHT is sitting at 693A, IGP1 = 1.3e-6 Torr.

Stepping up TGHT voltage up to 14V from 13.05V to reach the max current of 700A.


 

 Wednesday, January 22, 2014, 15:09

TGHT reached to 700A/12.83V.  Local temperature on the boat surface was measured at ~1500C.

Target will be heated for a few hours and will be cooled down later tonight.

The chamber will be vented tomorrow and the boat will be inspected.


 

 Wednesday, January 22, 2014, 18:09

After the boat was heated for ~4hrs, TGHT tripped off on IEVAP2:TBHT2 (see attachment #1, #2). 

Tried clearing the water interlock via EPICS - failed to clear.  Checked the local water valves - ALL VALVES are OPEN 

Tried closing and re-opening the IEVAP2:TBHT2 valves, interlock cleared after a few minutes. 

Maybe a fault in the water signal.  If it happens again, the water signal should be replaced.

Turned back on the power supply - TGHT current/voltage are holding.  Target boat may be OK!

Chamber is a bit warm now.  Will allow time to cool down.

Will vent the chamber tomorrow and the boat will be inspected. 


 

 Thursday, January 23, 2014, 16:18

Chamber vented overnight and was opened up this morning.

Target boat not fully sintered [see attached photos].

Chamber currently being pumped down again in order to continue with sintering TaC coating.

HS cooling water valves were opened, no leaks detected.

Will ramp up to 700A again over the weekend.

Attachment 1: IMG_20140123_144725917.jpg
IMG_20140123_144725917.jpg
Attachment 2: IMG_20140123_144736614.jpg
IMG_20140123_144736614.jpg
  111   Friday, January 24, 2014, 14:25 Laura LambertEmpty40282-4TARGET BOATIn progressSintering Ta target boat with TaC coating

Laura Lambert wrote:

John Wong wrote:

John Wong wrote:

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

 Monday, January 20, 2014, 16:32

A new target boat was sprayed with TaC coating and let dry this morning.

The target boat is NOT wrapped with Ta-heat shield.

The boat was installed in Evap#2, chamber is currently being pumped down overnight.


 

 Tuesday, January 21, 2014, 11:10

Chamber was pumped down to ~2e-7 Torr. HS cooling water valves were opened, no leaks detected.

TGHT was stepped up to 35A, voltage max set at 13V. TBHT currently @ 0A.

Waited ~20min, current stabilized, vacuum started to drop, auto-ramp initiated at 2.0A/min and max setpoint to 700A.

Good vacuum: 3.00e-5 Torr, Bad vacuum 4.00e-5 Torr.


 

 Tuesday, January 21, 2014, 11:51

Vacuum was grumpy and was well on it's way to tripping off [reached 5e-5 Torr], auto ramping was stopped at ~95A and quickly stepped down to 90A to avoid tripping it off.

Allowed vacuum to settle back down to 2.3e-6 Torr. Auto ramping changed to 0.2A/min and re-started.

 close-call!


 

 Wednesday, January 22, 2014, 09:46

TGHT has been slowly ramping up overnight at a rate of 0.2A/min.

IGP1 = 2.9e-7 Torr, TGHT = 342A; stepping ramping rate up to 2.0A/min.


 

 Wednesday, January 22, 2014, 13:43

TGHT is sitting at 693A, IGP1 = 1.3e-6 Torr.

Stepping up TGHT voltage up to 14V from 13.05V to reach the max current of 700A.


 

 Wednesday, January 22, 2014, 15:09

TGHT reached to 700A/12.83V.  Local temperature on the boat surface was measured at ~1500C.

Target will be heated for a few hours and will be cooled down later tonight.

The chamber will be vented tomorrow and the boat will be inspected.


 

 Wednesday, January 22, 2014, 18:09

After the boat was heated for ~4hrs, TGHT tripped off on IEVAP2:TBHT2 (see attachment #1, #2). 

Tried clearing the water interlock via EPICS - failed to clear.  Checked the local water valves - ALL VALVES are OPEN 

Tried closing and re-opening the IEVAP2:TBHT2 valves, interlock cleared after a few minutes. 

Maybe a fault in the water signal.  If it happens again, the water signal should be replaced.

Turned back on the power supply - TGHT current/voltage are holding.  Target boat may be OK!

Chamber is a bit warm now.  Will allow time to cool down.

Will vent the chamber tomorrow and the boat will be inspected. 


 

 Thursday, January 23, 2014, 16:18

Chamber vented overnight and was opened up this morning.

Target boat not fully sintered [see attached photos].

Chamber currently being pumped down again in order to continue with sintering TaC coating.

HS cooling water valves were opened, no leaks detected.

Will ramp up to 700A again over the weekend.

 Friday, January 24, 2014, 14:21

Chamber was pumped down to 1.7e-7 Torr.

TGHT was stepped up to 35A, voltage max set at 14V. TBHT currently sitting at 0A.

Waited 20min, vacuum consistently stable. Auto-ramp initiated at 2.0 A/min and max setpoint to 700A.


 