Monday, June 01, 2020, 12:03, Aaron Schmidt, Ta, 44139-13, LP-SIS, In progress, Ta#60 Conditioning
|
Ta#60 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm
Target density = 14.081 g/cm3
Target length = 3.33 cm
Total Mass = 46.891 g [Incl foils + Ta wire on 6 packs]
Total mass w/ Target oven= 445g w/ end caps)
Discs in target are arranged as follows: 1pack / 75singles / 1pack / 100singles / 2packs / 100singles / 1pack / 75singles / 1pack
End caps installed (Expanded). No Ta heat shield added.
https://elog.triumf.ca/TIS/Target+Production/98
Monday, June 01, 2020, 11:38: Roughing.
Monday, June 01, 2020, 12:03: Turbo pump on.
TBHT will be ramped up to 230A at 1.0A/min.
TGHT will be ramped up to 600A + at 2.0A/min.
Final desired temperature = 1900C.
OMEGA slope = 0.98.
Tuesday, June 02, 2020, 07:13: Omega slope set to 0.98. Power supplies / sources on. vacuum@ 5.13e-07T.
Tuesday, June 02, 2020, 07:16: Manually tap up TGHT / TBHT to 40 / 5 A. Vacuum @ 5.08e-07T.
Tuesday, June 02, 2020, 07:19: Auto-ramping TGHT / TBHT @ 2 A per min to 350 / 150 A.
Tuesday, June 02, 2020, 10:02: Auto-ramping TGHT / TBHT @ 2 / 1 A per min to 450 / 200 A. Vacuum @ 1.39e-06T. TGHT Voltage= 5.955V. Omega: 1288 deg C.
Tuesday, June 02, 2020, 11:54: Auto-ramping TGHT / TBHT @ 2 / 1 A per min to 500 / 230 A. Vacuum @ 1.85e-06T. TGHT Voltage= 7.998V. Omega: 1528 deg C.
Tuesday, June 02, 2020, 13:16: Auto-ramping TGHT @ 2 A per min to 550 A. Vacuum @ 2.51e-06T. TGHT Voltage= 9.060V. Omega: 1625 deg C.
Tuesday, June 02, 2020, 13:58: Auto-ramping TGHT @ 2 A per min to 600 A. Vacuum @ 3.53e-06T. TGHT Voltage= 9.060V. Omega: 1728 deg C.
Tuesday, June 02, 2020, 14:23: Auto-ramping TGHT @ 2 A per min to 625 A. Vacuum @ 5.56e-06T. TGHT Voltage= 11.236V. Omega: 1821 deg C.
Tuesday, June 02, 2020, 14:36: TGHT / TBHT 625 / 230 A. Vacuum @ 6.65e-06T. TGHT Voltage= 11.724V. Omega: 1865 deg C.
Tap up TGHT manually.
Tuesday, June 02, 2020, 14:48: TGHT / TBHT 643 / 230 A. Vacuum @ 7.24e-06T. TGHT Voltage= 12.129V. Omega: 1901-1903 deg C.
Desired temperature = 1900C reached.
Tuesday, June 02, 2020, 22:20: TGHT / TBHT 643 / 230 A. Vacuum @ 2.05e-06T. TGHT Voltage= 12.212V. Omega: 1901-1903 deg C.
Tuesday, June 02, 2020, 22:22: Auto-Cooling @ 1 A per min.
Wednesday, June 03, 2020, 06:08: TBHT @ 0. TGHT set for Auto-Cooling @ 2 A per min.
Wednesday, June 03, 2020, 11:38: PS off. Turbo pump off.
Wednesday, June 03, 2020, 12:40: Venting. |
Friday, May 29, 2020, 10:26, Marla Cervantes, Empty, 43044-8, LP-SIS, Done, TaC coating/sintering
|
Friday, May 29, 2020, 08:52
Ta tube was coated with TaC and wrapped with Ta heat-shields (3 layers)
Desired temperature= 1900 C (expected TGHT ~430 A), TBHT will be set fixed at 230A (max).
Evap 2 was pumped down
Good vacuum= 3.00 e-5 Torr
Bad vacuum = 5.00 e-5 Torr
Ramped TGHT and TBHT to 40A at 0.5A/min
Initial IGP1 = 3.7e-7 Torr
Friday, May 29, 2020, 10:23
Autoramp deliver 40 A
TGHT = 0.47 V, 40.72 A
TBHT = 0.5 V, 38.78 A
IGP1 = 4.5 e-6 Torr and going down
Autoramp TGHT and TBHT at 1A/min to 400A and 230A respectively.
Friday, May 29, 2020, 11:27
Autoramp was stopped at 70 A, since pressure kept increasing, current was manually decreased to 65 A in both TGHT and TBHT.
The system will remain at current conditions until pressure reduce.
Friday, May 29, 2020, 12:44
Autoramp TGHT and TBHT at 1A/min to 400A and 230A respectively.
Saturday, May 30, 2020, 00:23
Autoramp deliver 400 A at TGHT and 230 A at TBHT
TGHT = 7.8 V, 453.9 A
TBHT = 4.21 V, 232.9 A
IGP1 = 9.7 e-6 Torr and going down
Omega = 1893 degC
Autoramp TGHT and TBHT at -1A/min to 400 A
Initiating auto-cool at -2.0A/min and -1.0A/min for the TGHT and TBHT respectively
|
Wednesday, May 27, 2020, 13:04, Marla Cervantes, , 44139-7-SK, , Done, Conditioning graphite target #2
|
Wednesday, May 27, 2020, 10:22
IGP1 = 3.2e-7 Torr
TGHT = 0.186 V, 0.028 A
The autoramp is set to 50A:
1 A each 10 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr
Wednesday, May 27, 2020, 10:40
TGHT = 1.17 V, 50.9 A
PS = 1.21 V, 50 A
IGP1 = 8e-4 Torr and going down
Autoramp is set to 80 A same conditions
1 A each 10 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr
Wednesday, May 27, 2020, 12:29
TGHT = 1.59 V, 80.04 A
PS = 1.58 V, 80 A
IGP1 = 2e-4 Torr and going down
Autoramp is set to 100 A,conditions:
1 A each 20 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr
Wednesday, May 27, 2020, 12:38
TGHT = 1.97 V, 100.35 A
IGP1 = 4e-4 Torr
Autoramp is set to 120 A,conditions:
1 A each 20 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr
Wednesday, May 27, 2020, 12:48
TGHT = 2.27 V, 119.1 A
IGP1 = 4e-4 Torr
Autoramp is set to 190 A,conditions:
1 A each 10 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr
Wednesday, May 27, 2020, 13:03
TGHT = 3.4 V, 191.25 A
IGP1 = 3e-4 Torr
Autoramp is set to 190 A,conditions:
2 A each 10 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr
Wednesday, May 27, 2020, 13:36
TGHT = 7.8 V, 423 A
IGP1 = 3e-4 Torr
Autoramp is set to 450 A,conditions:
2 A each 10 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr
Wednesday, May 27, 2020, 13:43
TGHT = 8.5 V, 451.6 A
IGP1 = 2e-4 Torr
Autoramp is set to 520 A,conditions:
2 A each 10 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr
Wednesday, May 27, 2020, 14:02
TGHT = 10.3 V, 508.16 A
Power supply = 10.39 V, 506 A
Omega = 2000 degC
AP = 2046.4 degC
After 3 hours at 2000 degC, the autoramp was set to 0 A,
conditions: -2 A each 10 s.
Note: There was a voltage drop of 0.6 V (fig. elog-484-fig2) |
Sunday, May 24, 2020, 13:39, Marla Cervantes, Empty, 44139-11, LP-SIS, Done, TaC coating/sintering
|
Sunday, May 24, 2020, 06:54
Ta tube was coated with TaC and wrapped with Ta heat-shields (3 layers)
Desired temperature= 1900 C (expected TGHT ~430 A), TBHT will be set fixed at 230A (max).
Evap 2 was pumped down
Good vacuum= 3.00 e-5 Torr
Bad vacuum = 5.00 e-5 Torr
Ramped TGHT and TBHT to 40A at 0.5A/min
Initial IGP1 = 2.5e-7 Torr
Sunday, May 24, 2020, 08:24
Autoramp deliver 40 A
TGHT = 0.58 V, 39.6 A
TBHT = 0.46 V, 39.81 A
IGP1 = 2.9 e-7 Torr and increasing
Heater conditions will be hold for 15 min to account for pressure changes.
Sunday, May 24, 2020, 08:39
IGP1 = 2.7e-7 Torr and decreasing
Autoramp TGHT and TBHT at 1A/min to 400A and 230A respectively.
Sunday, May 24, 2020, 14:57
After 15 min the autoramp stopped
TGHT = 6.8 V, 394.65 A
TBHT =4 V, 232.9 A
IGP1 = 2.2e-6 Torr and going down
Omega = 1747 degC
Autoramp set to TGHT 1A/min to 450A
Sunday, May 24, 2020, 16:07
After 15 min the autoramp stopped
TGHT = 7.7 V, 448 A
IGP1 = 2.88e-6 Torr
Omega = 1886 degC
The current will be increased manually to reach 1900 deg C
Final TGHT = 7.9 V, 453.15 A (455 A input)
Omega = 1899 degC
The TGHT and TBHT will leave at current conditions until pressure reduce (approx 4 hours)
Sunday, May 24, 2020, 20:01
TGHT = 7.9 V, 456 A
TBHT = 4 V, 232.9 A
IGP1 = 1.8e-6 Torr
Omega = 1893 degC
Initiating auto-cool at -2.0A/min and -1.0A/min for the TGHT and TBHT respectively. |
Monday, March 23, 2020, 07:50, Marla Cervantes, , 41882-1, TARGET BOAT, Done, Conditioning graphite target #1 (T2)
|
Friday, March 20, 2020, 19:39
The target material is loaded in a graphite cartridge.
The graphite cartridge is placed in a new tantalum boat previously without TaC,
the Ta boat was wrapped with three new Ta heat shields.
The system is currently pumping down.
Monday, March 23, 2020, 07:49
IGP1 = 2.2e-7 Torr
Good vacuum= 3.00 e-5 Torr
Bad vacuum = 5.00 e-5 Torr
Ramping TGHT to 40A at 0.5A/min
Monday, March 23, 2020, 10:35
Due to the COVID-19, non-essential activities are wrapped up,
the conditioning of the carbon target will be postponed until further notice |
Wednesday, May 20, 2020, 12:54, Marla Cervantes, , 41882-1, TARGET BOAT, Done, Conditioning graphite target #1 (T2)
|
Marla Cervantes wrote: |
Friday, March 20, 2020, 19:39
The target material is loaded in a graphite cartridge.
The graphite cartridge is placed in a new tantalum boat previously without TaC,
the Ta boat was wrapped with three new Ta heat shields.
The system is currently pumping down.
Monday, March 23, 2020, 07:49
IGP1 = 2.2e-7 Torr
Good vacuum= 3.00 e-5 Torr
Bad vacuum = 5.00 e-5 Torr
Ramping TGHT to 40A at 0.5A/min
Monday, March 23, 2020, 10:35
Due to the COVID-19, non-essential activities are wrapped up,
the conditioning of the carbon target will be postponed until further notice
|
Wednesday, May 20, 2020, 12:50
On May 19 the pumps of EVAP2 were turned on to purge the system
Today Aaron made a leak check, for details, visit elog-481
Currently IGP1 = 8.17e-7 Torr
Thursday, May 21, 2020, 09:41
IGP1 = 4.5e-7 Torr
TGHT = 0.03 V, 0.028 A
Current will be increased manually to 10 A, and then it will be autoramp to 500 A
Whit this power supply the current increments are register since the beging
TGHT = 0.145 V, 10.35 A
During the input of the 10 A there was no anomaly with the pressure and the autoramp was set to 50A:
1 A each 10 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr
Thursday, May 21, 2020, 10:39
The autoramp reached the 50 A set
TGHT = 0.65 V, 49.05 A
Power supply = 0.64 V, 50 A
IGP1 = 4.7e-7 Torr
Everything looks good, autoramp is set to 80 A same conditions
1 A each 10 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr
Thursday, May 21, 2020, 10:49
The autoramp reached the 80 A set
TGHT = 1.075 V, 79.36 A
Power supply = 1.07 V, 80 A
IGP1 = 1.7e-6 Torr and increasing
Autoramp is set to 100 A,conditions:
1 A each 20 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr
There was a jump in the vacuum e-log-482-fig-1.
Thursday, May 21, 2020, 11:01
The autoramp reached the 100 A set
TGHT = 1.4V, 99.9 A
Power supply = 1.4V, 100 A
IGP1 = 0.001 Torr and increasing
Autoramp is set to 120 A,conditions:
1 A each 20 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr
Thursday, May 21, 2020, 11:12
TGHT = 1.75 V, 120.6 A
Power supply = 1.74 V, 120 A
IGP1 = 0.0018 Torr
The current will be hold and to let the vacuum reduce
Thursday, May 21, 2020, 11:34
TGHT = 1.8 V, 120.825 A
Power supply = 1.74 V, 120 A
IGP1 = 9.8e-5 Torr
Thursday, May 21, 2020, 11:37
Autoramp is set to 300 A,conditions:
2 A each 10 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr
Thursday, May 21, 2020, 12:21
TGHT = 5.015 V, 298.125 A
Power supply = 5 V, 300 A
IGP1 = 4.77e-5 Torr
Omega = 1130 degC
Note: Measurments will be taken with ARIEL's pyrometer (I will call it AP in this elog).
The emmisivity this pyrometer accounts for is 0.91 for the range of 1000 C to 1800 C
Above 01800 it will use 0.93 as the emissivity
AP = 977.7 degC
|
Wednesday, May 20, 2020, 07:18, Aaron Schmidt, , , , , Check Evap 2
|
Gradually open waterlines under vacuum after period of no use.
Wednesday, May 20, 2020, 07:17: Vacuum @ 1.13e-06T
Wednesday, May 20, 2020, 07:19: Hot lab cooling water return opened. Vacuum @ 1.13e-06T.
Wednesday, May 20, 2020, 07:22: Hot lab cooling water supply opened. Vacuum @ 1.11e-06T.
Wednesday, May 20, 2020, 07:29: Vacuum remains stable @ 1.11e-06T.
|
Wednesday, March 18, 2020, 07:21, Marla Cervantes, TaC, 44139-11, LP-SIS, Done, TaC coating/sintering
|
Wednesday, March 18, 2020, 07:10
Ta tube was coated with TaC and wrapped with Ta heat-shields (3 layers)
Desired temperature= 1900 C (expected TGHT ~430 A), TBHT will be set fixed at 230A (max).
Evap 2 was pumped down on the previous night.
Good vacuum= 3.00 e-5 Torr
Bad vacuum = 5.00 e-5 Torr
Ramped TGHT and TBHT to 40A at 0.5A/min
Initial pressure IGP1 = 4.8e-7Torr
Wednesday, March 18, 2020, 09:29
After an hour pressure reduced to 5.45e-6 Torr
TGHT; 0.518 V, 40.5 A
TBHT: 0.41 V, 38.6 A
Autoramp TGHT and TBHT at 1A/min to 400A and 230A respectively.
Wednesday, March 18, 2020, 18:29
TGHT = 400A, 6.6V, TBHT= 232.9, 3.9V
OMEGA = 1240 C, this is 500 degC lower than previous LP-SIS at same conditions
https://elog.triumf.ca/TIS/Evaporator_2/464
Start autoramp to 460A on TGHT at 1A/min
Wednesday, March 18, 2020, 20:51
TGHT: 464 A, 7.75 V
Temperature 1328, I won't increase the temperature because there is a chance that the reading is 500 degC off and the target is sitting at 1828 degC instead of 1328 degC
Wednesday, March 18, 2020, 23:17
After ~4 hours at 1317 degC according to the pyrometer:
TGHT = 7.7 V, 457.8 A,
TBHT = 3.9 V, 232.9 A,
IGP1 = 1.16e-6
Commence cooling at -2A/min for TGHT and -1A/min for TBHT
Thursday, March 19, 2020, 15:53
Venting and dismounting.
The coating does not have the quality to be used online, another LP-SIS will be coated and sinter |
Monday, March 16, 2020, 13:47, Marla Cervantes, , 40282-5, TARGET BOAT, Done, Conditioning graphite target #1
|
Monday, March 16, 2020, 13:47
Target material characteristics: Graphite cast of 0.965g/cm3, 287 D-shaped discs, disc area 0.969cm2, total mass of 9.972g, length 10.657cm.
The target material is loaded in a graphite cartridge.
The graphite cartridge is placed in a tantalum boat previously coated with TaC,
the Ta boat was wrapped with two used Ta heat shields.
The system is currently pumping down.
Tuesday, March 17, 2020, 08:11
IGP1 = 3.18e-7 Torr
Current will be increased manually to 10 A, and then it will be autoramp to 500 A
During the input of the 10 A there was no anomaly with the pressure and the autoramp was set to:
1 A each 10 s with a good vacuum of 3e-2 Torr and a bad vacuum 5e-2 Torr
Tuesday, March 17, 2020, 09:03
After 30 min:
TGHT: 98.1 A, 1.48 V (the voltage is increasing)
IGP1 = 3e-4 Torr
The autoramp is set to 2 A each 10 s to 500 A
Tuesday, March 17, 2020, 09:52
At 500 A the temperature was ~1243 C
So, the autoramp was re started 2 A each 10 s to 520 A
Tuesday, March 17, 2020, 09:56
TGHT= 510 A, 9.18 V
IGP1= 8.2e-5 Torr
Pressure decreasing.
Temperature register in iR2C: 1272 C
The target will stay at 520 A for 15 min to account for thermal equilibrium, and then the current will be increased to go to 1800 C
Tuesday, March 17, 2020, 10:11
The temperature stayed at 1270 C,
The autoramp is re started: 2 A each 10 s to 600 A
Tuesday, March 17, 2020, 10:24
TGHT: 10.693 V, 588.5 A
IGP1 max 7.4e-5 Torr
Temperature after 3 min at 588.5 A: 1368 C
Tuesday, March 17, 2020, 10:34
The autoramp is re started: 2 A each 10 s to 650 A
Tuesday, March 17, 2020, 10:46
TGHT=11.99 V, 637.6 A
IGP1=5.5e-5 Torr (8e-5 Torr max)
Temperature 1459 C
The current and voltage drop 10 A and 0.3 V respectively when the autoramp is stopped
Tuesday, March 17, 2020, 10:53
The autoramp is re started: 2 A each 10 s to 700A
Tuesday, March 17, 2020, 11:04
TGHT: 13 V, 686.59 A
IGP1: 6.2e-5 Torr (Max 8.7e-5Torr)
Temperature: 1507 C
Tuesday, March 17, 2020, 11:05
The autoramp is re started: 2 A each 10 s to 800A
Tuesday, March 17, 2020, 11:16
TGHT=14.29 V, 759 A
IGP1: 8.6e-5 Torr (Max 1e-4 Torr)
Temperature 1527 C
There is a current discrepancy in EPICs (see current discrepancy picture),
the autoramp stopped at 761 A because EPICS? reads 800 A
Increasing current manually.
Increasing the current manually did not work, because set current is at fake maximum
Tuesday, March 17, 2020, 13:43
The temperature stabilized to 1567 C. The current however was not stable ( look at the CarbonTarget - Max current)
an autoramp is set to -2 A each 10 s to 0A
The set current is going down but not the epics reading current neither the temperature. I assume the current will star going down when the set and the reading current from epics are the same.
Tuesday, March 17, 2020, 13:50
Autoramp was stopped, and current was reduced manually, at around 652 A (set current) the reading current started going down (639.5 A)
Autoramp is set to -2 A each 10s to 0 A
The tantalum boat deformed and the graphite cartridge rim broke |
Friday, March 13, 2020, 14:21, Darwin Ortiz Rosales, SiC, 42218-8 , HP-SIS, Done, Conditioning of SiC discs (sintering) (RUSH)
|
Friday, March 13, 2020, 13:52
Total number of foils: 493
Total length packed 17.4 cm
container has 3 Ta heat shields.
No endcaps inserted to facilitate out-gassing
Two TaC coated Ta wire springs inserted at both ends.
Initially to ramp TGHT and TBHT to 50A at 1A/min
Then heat manually to OMEGA ~1400 C , ramping TGHT manually and automatically to reach 530A A (Omega slope set = 0.990)
Then temperature = 1800 (C using slope 1.08 at after 1700C manually and automatically ramp to 700A then TGHT will be tapped up accordingly to reach desired Temp).
TBHT will be set fixed at 230 A (max). TBHT heated manually and automatically to max.
Good vac at 3.00 e -5 Torr
Bad vac at 5.00 e-5 Torr
Evaluation discs not included because no space.
Total Green disc mass measured = 58.78 g
Friday, March 13, 2020, 14:22
Container loaded and pressuring down started without any pump issues.
Friday, March 13, 2020, 23:26
IGP1= 9.1e-07 Torr
Start auto tap at .25A/min to 50A on both TBHT and TGHT
Saturday, March 14, 2020, 07:09
IGP1=6.9e-6 Torr
TGHT = 49.1 A, 0.58V
TBHT = 49.2A, .49V
Continue ramp to 80 A on both heaters at .0.25A/min (good vacuum 3.0 e-04 Torr, bad vaccum 5.0 e-04 Torr
Saturday, March 14, 2020, 08:22
IGP1=6.8 e-05 Torr
Pressure spike TGHT =63.7 A, 0.77 V; TBHT = 60.0 A , 0.62 V
Aborted ramp alow to stabilize (Tapped TBHT to 63.8 A
Saturday, March 14, 2020, 12:16
IGP1= 8.1e-05 Torr
start autoramp at 0.25A/min
Saturday, March 14, 2020, 17:47
IGP1= 2.9e-05 Torr
TGHT= 78.4A, 1.0 V
TBHT = 79.4A, .88 V
manual and automatic tap up to 740A TGHT and 230A TBHT then tap manually to 1800 C (mostly at .075 A/min and increasing to 1A /min as pressure stabilizes)
Sunday, March 15, 2020, 22:40
OMEGA = 1711 C
TGHT = 784,6 A, 12.9V (readback)
TBHT = 232 A, 3.5 V
Tap TGHT to 800 A readback set to 815A
Sunday, March 15, 2020, 23:20
OMEGA =1801 C
TGHT = 799.2 A, 13.3 V, TBHT = 232.9, 3.6V
Start gradual tap-down as temperature rising (1810 C at end of this note)
Sunday, March 15, 2020, 23:49
OMEGAA = 1818 C
TGHT = 769.9A, 12.6 V; TBHT = 232.9 A, 3.6 V
Temperature dropping tapped back up to 799 A on TGHT read back (set to 815 A)
Monday, March 16, 2020, 04:10
OMEGA = 1395 C (not reliable)
TGHT = 799.2 A, 13.2 V
TBHT = 232.9 A, 3.6 V
IGP1 = 2.2 e-06 Torr
Initiate cooling at -1.5 A/min on TGHT to 600A (at 600 A increase cooling rate to 3 A/min ; at 300 A increase cooling to 4 A/min and start TBHT cooling at 1 A/min; at `200 A on TGHT increase cooling to 4 A/min and TBHT 2 A/min)
Monday, March 16, 2020, 09:43
TGHT = 0 A , 0.02V
TBHT = 53,2 A, .56 V (increase cooling to 4 A/min)
IGP1= 1.12e-07 Torr
Monday, March 16, 2020, 10:37
IGP1= 9.5 e -8 Torr
TGHT and TBHT = 0A, 0V
Will unload container
Monday, March 16, 2020, 12:40
Ten discs removed for evaluation (6 from left side and 4 from right side)
two graphite discs placed at each end as well as two TaC coated and sintered end-caps
total length after sintering = 17.8 cm
|
Tuesday, March 10, 2020, 09:34, Darwin Ortiz Rosales, Empty, 42218-8, HP-SIS, Done, TaC coating/sintering
|
Monday, March 9, 2020, 03:15
Container coated with TaC and wrapped with 3 Ta heat shields.
Desired temperature= 1900 C, Omega Slope set = 0.990, Auto TGHT at 0.2A/min to reach 400A, TGHT will be tapped up accordingly to reach desired Temp.
TBHT will be set fixed at 230 A (max).
Good vac at 3.00e -5 Torr
Bad vac at 5.00e-5 Torr
Chamber pump down
Tuesday, March 10, 2020, 09:17
Starting manual ramp to 50 A @ approximately 2A/min
IGP1 = 3.73e-7 Torr after opening water line pressure slowly incresed to 4.4e-7 Torr
TBHT also has Chiller interlock reached out to controls for removal.
Tuesday, March 10, 2020, 10:47
Chiller Interlock removed for TBHT. Started manual ramp to 50A @ approximately 2A/min
Tuesday, March 10, 2020, 11:15
allowing to stabilize at 50A on TGHT and TBHT
IGP1= 7.9 e=7 Torr and trending up
Tuesday, March 10, 2020, 12:09
Pressure on IGP1 spiked. Allowing to stabilize.
Tuesday, March 10, 2020, 14:36: Stopped By to check. Vacuum @ 3.02e-03T. Turbo pump appears to have tripped. Shut off Both PS. Prepare to vent. - Aaron S.
Tuesday, March 10, 2020, 14:48: Tightened all fittings (Just in case). HS side & HS waterline at the feed through. Roughing.
Tuesday, March 10, 2020, 15:06: TP1 @ 38KRPM 1.34e-04T & dropping. TGHT & TBHT PS on. Monitor before heating. -AS
Wednesday, March 11, 2020, 06:25: Vacuum @ 3.39e-07T. TGHT / TBHT PS on. - AS
Wednesday, March 11, 2020, 06:26: Manually tapped up TGHT / TBHT to 10 / 10 A. Ok.
Wednesday, March 11, 2020, 06:28: Auto-ramping TGHT / TBHT @ 4 A per min to 50 / 50 A.
Wednesday, March 11, 2020, 07:07: Vacuum @ 3.64e-07T. TGHT / TBHT @ 50 A. All appears stable. - AS
Wednesday, March 11, 2020, 07:036
Started autoramp at 2 A/min
IGP1= 3.6e-7 Torr
Wednesday, March 11, 2020, 08:06
TGHT=10 5A, 1.3 V TBHT = 105 A, 1.2 V
pressure rising fast; manual ramp down to 95A on both TGHT and TBHT
Wednesday, March 11, 2020, 09:54
IGP1= 4.7e-6 Torr; TGHT = 93.1 A, 1.2 V; TBHT = 95.1 A, 1.1 V
start autoramp at 1A/min (0.5 A/30s)
IGP1= 1.28e-5 Torr
TGHT = 108.3 A, 1.44 V
TBHT = 110 A, 1.29 V
Stop autoramp
Wednesday, March 11, 2020, 10:25
IGP1= 5.9e-5 Torr
manually tapped TGHT and TBHT set-current to 105 A respectively.
pressure dropping.
Wednesday, March 11, 2020, 11:18
IGP1=8.0e-06 Torr
manually ramp to set-current 115 A for both TGHT and TBHT at approximately 2A/ min
allow to stabilize before proceeding
Wednesday, March 11, 2020, 12:12
IGP1=7.02e-6 Torr
TGHT = 112.7 A, 1.5 V
TBHT = 114.6 A, 1.4 V
Auto-ramping at 1A/min TGHT to 430 A and TBHT top 230A
Wednesday, March 11, 2020, 18:45
IGP1= 1.2 e-06 Torr
TGHT=421.8 A, 6.2 V
TBHT = 231.9 A, 3.1 V
auto-ramp TGHT at 1A/min to set-current 530A
Wednesday, March 11, 2020, 23:08
IGP1= 1.3e-6 Torr
TGHT= 519.9 A, 7.87V
TBHT = 232.0 A, 3.1 V
start autoramp TGHT to 600A at 1A/min
Wednesday, March 11, 2020, 23:36
IGP1= 1.6e-6 Torr
TGHT = 542.9 A, 8.2V
TBHT = 232.9 A, 3.1V
Set autoramp to 750A on TGHT at 0.5 A/min
Thursday, March 12, 2020, 06:55
The Voltage set on TGHT was too low so current had not increased
IGP1= 1.5e-6 Torr
TGHT = 640 A, 10V
TBHT 232/9A, 3.1V
Oncrease TGHT voltage set to 14.5 and start autoramp at 3A/min to 750 A
Thursday, March 12, 2020, 7:43
TGHT = 735.7 A, 11.8V
OMEGA = 1595C
Auto -ramp set to 780 A for TGHT
Thursday, March 12, 2020, 7:58
OMEGA = 1655 C
TGHT set to 800 A at 3A/min
Thursday, March 12, 2020, 9:42
OMEGA = 1704 C
TGHT = 789.5 A, 13.0 V
Manual tap up to 837 A set on TGHT and 821 A readback
Thursday, March 12, 2020, 10:00
TGHT readback = 821.0 A, 13.7 V
OMEGA = 1744 C
TBHT same as previous entry.
Thursday, March 12, 2020, 10:35
Tapped up TGHT to 832.6 A, 13.8 V
OMEGA = 1759 C
TBHT = 232.9 A, 3.6 V
Will not tap further.
Thursday, March 12, 2020, 13:22
IGP1 = 5.0 e-06 Torr (stable)
TGHT = 832.7 A readback (849 A set), 13.7V
TBHT = 232.9 A, 3.6 V
OMEGA = 1758 C
Start cooling at TGHT 3A/min
Thursday, March 12, 2020, 14:08
IGP1= 1.32e-06 Torr
TGHT = 706 A, 11.0 V
TBHT = same as previous
OMEGA = 1583C
Start cooling TBHT at 1A/min continue cooling TGHT at 3A/min
Friday, March 13, 2020, 08:18
IGP1= 3.9e-8 Torr
Will unload sintered container
|
Wednesday, March 04, 2020, 14:33, Aaron Schmidt, , , , Maintenance, PS swap out
|
The TGHT PS was found to be defective.
It was uninstalled w/ Joel S: I2020-02-28-2.
It was replaced with the conditioning station PS & connected. The chiller is not required and has been unplugged.
Wednesday, March 04, 2020, 14:00. Controls Involved (PS still locked out via main breaker)
Wednesday, March 04, 2020, 14:31: Water supplies opened. All ok except Chiller (Disconnected from PS, but not the supply/return, do not open Chiller lines)
Controls work ongoing.
Thursday, March 05, 2020 (Darwin)
Gelo finished installation of the other power supply S:_____________________.
It was tested and proved to be operational and epics controlled. Tested up to 60A
Chiller interlock was removed as it is no longer needed.
Will wait for Aaron to swap FEBIAD assembly in EVAP 2.
|
Tuesday, December 03, 2019, 08:24, Aaron Schmidt, , , LP-FEBIAD, In progress, Temperature mapping.
|
Tuesday, December 03, 2019, 08:15: Waterlines opened. Vacuum ok @ 4.06e-07T
Tuesday, December 03, 2019, 08:23: Unable to start due to flow trip? PS off.
Tuesday, December 03, 2019, 08:25: Turbo & Vac off.
Tuesday, December 03, 2019, 08:51: Vented. Investigate. Install outer shields. Loose wire found on exterior paddle. Trip gone. Roughing.
Tuesday, December 03, 2019, 09:03: Turbo pump on.
Tuesday, December 03, 2019, 09:12: PS on. Vacuum @ 4.46e-05T and dropping.
Wednesday, December 04, 2019, 10:21: Manually tapped up the TGHT / TBHT to 35 / 10 A.
Wednesday, December 04, 2019, 10:22: Auto-ramping TGHT / TBHT to 300 / 150 A @ 2 A per min.
FM
Wednesday, December 04, 2019, 13:48: Auto-ramping TGHT / TBHT to 350 / 175 A @ 2 A per min.
Wednesday, December 04, 2019, 14:20: Auto-ramping TGHT / TBHT to 400/ 190 A @ 2 A per min.
Thursday, December 05, 2019, 10:58: Checking the striptool, approximately 30 minutes ago there was an oscillatory behaviour on the TGHT power. It went down to 0 in a very short time.
Temperature measurements were recorded and indicate a 70C difference from before the event.
Thursday, December 05, 2019, 15:08: Auto-ramping TGHT / TBHT to 450/ 230A @ 2 A per min.
Thursday, December 05, 2019, 19:05: Checking the striptool, at around 6 pm the TGHT power supply trip and didn't come back.
Thursday, December 05, 2019, 19:06: Drop in temperature indicates the target stop glowing.
Thursday, December 05, 2019, 19:07> Turning off power supply on EPICS and setting the slider to 0A.
I will ramp up TGHT in the morning while in the lab.
Friday, December 06, 2019, 14:55: Ramping down TBHT to 0A @ 2A/min
Tuesday, December 10, 2019, 09:11: Manually tapped up the TGHT / TBHT to 35 / 10 A
Tuesday, December 10, 2019, 09:12: Auto-ramping TGHT / TBHT to 400/ 230A @ 2 A per min.
Aborted |
Tuesday, November 26, 2019, 15:21, Darwin Ortiz Rosales, SiC, 42464-3, HP-FEBIAD, Done, Conditioning of SiC discs (sintering) (RUSH)
|
Tuesday, November 26, 2019, 14:53
Total number of foils: 504
Total length packed 17.4 cm
container has 3 Ta heat shields.
No endcaps inserted to facilitate out-gassing
Two TaC coated Ta wire springs inserted at either end.
Initially to ramp TGHT and TBHT to 50A at 1A/min
Then heat manually to OMEGA ~1400 C , ramping TGHT manually and automatically to reach 530A A (Omega slope set = 0.990)
Then temperature= (Correected to 1800C) 1900 C, Omega Slope set = 0.990, manually and automatically ramp to 700A, TGHT will be tapped up accordingly to reach desired Temp.
TBHT will be set fixed at 230 A (max). TBHT heated manually and automatically to max.
Good vac at 3.00 e -5 Torr
Bad vac at 5.00 e-5 Torr
System experienced some vacuum issues due to cooling water leak in a heatshield line.
Evaluation discs not included because no space.
Total Green disc mass measured = 58.250 g
Tuesday, November 26, 2019, 15:00
IGP1= 7.4e-06 Torr. No leak issues found after last fix (Anders will add details).
Tuesday, November 26, 2019, 15:33
TGHT= 52.7A, .22V TBHT= 49.3A, .52V
IGP1= 7.202 e-06 Torr (trending up so will allow to stabilize).
Wednesday, November 27, 2019, 06:09
left with autoramp waiting for vac to drop but no advance overnight.
Pressure did not seem to drop back below 3e-5 Torr magnitude, therefore not much advance in current ramp.
Thursday, November 28, 2019, 11:15
Continued ramping manually
OMEGA = 1429 C (0.99 slope), TGHT = 542A, 7.8V
With slope = 1.08 OMEGA = 1724 C, therefore staying at 0.99 slope
TaC coating sintering plot suggests 753A to reach 1800C (See attachment 1)
Windows a little bit coated but not enough to disturb laser.
Thursday, November 28, 2019, 12:17
TGHT =753A, 11.8V since 12:00 noon.
TBHT= 233.4A, 3.3V
OMEGA= 1735 C (0.99 slope)
Thursday, November 28, 2019, 13:01
OMEGA = 1860C (1.08 slope)
Thursday, November 28, 2019, 14:38
OMEGA temperature began to creep up to ~1880. Tapped TGHT current down to 733.5A, 11.4V
Thursday, November 28, 2019, 15:12
Checked windows and no significant additional buildup of obstructive material.
Temperature creeping up again. Tap down TGHT current to 729 A, 11.2 V
OMEGA = 1870C at slope 1.08
Thursday, November 28, 2019, 16:03
Temperature increase to 1880C
Tap down TGHT current to 715A, 10.9V
OMEGA= 1870 C (slope = 1.08)
Thursday, November 28, 2019, 16:22
Temperature creep to 1880 C
Tap down TGHT to 700A, 10.8V
OMEGA= 1845C
IGP1=2.2e-06 Torr
Thursday, November 28, 2019, 16:37
IGP1= 1.9e-06 Torr
OMEGA = 1850C (1.08 slope)
TGHT = 692A, 10.5V TBHT= 233A, 3.2V
Initiating pressure ramp at -2A/min on TGHT and -1A/min on TBHT
Thursday, November 28, 2019, 16:45
IGP1= 1.28e-06 Torr
OMEGA= 1770 C (1.08 slope)
TGHT = 650A, 9.8V
ramp TGHT at -3.5A/min maintain TBHT at -1A/m in
Thursday, November 28, 2019, 17:11
IGP1= 1.14e-06 Torr
OMEGA = 1730 C (1.08 slope)
ramp TGHT at -5A/min maintain TBHT at -1A/m
Thursday, November 28, 2019, 17:20
IGP1- 8.9e-07 Torr
OMEGA=1636C
ramp TGHT at -6A/min maintain TBHT at -1A/min
Thursday, November 28, 2019, 17:34
IGP1= 7e-07 Torr
OMEGA= 1500 C (1.08 slope)
ramp TGHT at -8A/min maintain TBHT at -1A/min
TBHT = 183A
OMEGA 1180C
TGHT =300 A
TBHT = 155A
Initiated -15A/min TGHT and -4A/min TBHT
IGP1= 5.2e-07 Torr
OMEGA below 1000C
begin manual tapdown
Thursday, November 28, 2019, 19:42
Target was dismounted after cooling. Two graphite discs and end caps inserted.
|
Wednesday, November 27, 2019, 17:45, John Wong, SiC, 42464-3, HP-FEBIAD, Done, Conditioning of SiC discs (sintering) (RUSH)
|
Darwin Ortiz Rosales wrote: |
Tuesday, November 26, 2019, 14:53
Total number of foils: 504
Total length packed 17.4 cm
container has 3 Ta heat shields.
No endcaps inserted to facilitate out-gassing
Two TaC coated Ta wire springs inserted at either end.
Initially to ramp TGHT and TBHT to 50A at 1A/min
Then heat manually to OMEGA ~1400 C , ramping TGHT manually and automatically to reach 530A A (Omega slope set = 0.990)
Then temperature= 1900 C (Correction = 1800 C, NOT 1900 - JW), Omega Slope set = 0.990 (use 1.08, check temp, JW), manually and automatically ramp to 700A (check temp to see if it's matching with the 1.08 slope), TGHT will be tapped up accordingly to reach desired Temp.
TBHT will be set fixed at 230 A (max). TBHT heated manually and automatically to max.
Good vac at 3.00 e -5 Torr
Bad vac at 5.00 e-5 Torr
System experienced some vacuum issues due to cooling water leak in a heatshield line.
Evaluation discs not included because no space.
Total Green disc mass measured = 58.250 g
Tuesday, November 26, 2019, 15:00
IGP1= 7.4e-06 Torr. No leak issues found after last fix (Anders will add details).
Tuesday, November 26, 2019, 15:33
TGHT= 52.7A, .22V TBHT= 49.3A, .52V
IGP1= 7.202 e-06 Torr (trending up so will allow to stabilize).
|
Wednesday, November 27, 2019, 17:44
I'll take over from here to step up the target heater, and I'll coordinate it with Darwin.
Wednesday, November 27, 2019, 20:36
Note: Sintering temp should be at 1800 C, NOT 1900. Use Omega slope 1.08 and check temperature. Correction made on elog #471.
Continue to step up TGHT and TBHT, keeping vacuum below 1.5 e-5 Torr.
Thursday, November 28, 2019, 03:06
TGHT reached to 400A/5.29V, TBHT at 230A/3.13V.
Vacuum coming down from 1.3 e-5 Torr.
OMEGA = 1105 C (slope at 0.99).
Instructions for Darwin:
1. Confirm temperature - check the temp plot from the TaC coating step.
2. Change OMEGA slop to 1.08 - check to see if this matches the temp plot. If not, bring it back to 0.99.
3. Continue to step up TGHT, check temp at 1400C (change slop 1.08 and check), 1500 C, 1600 C (check windows for coating - if any coating, then OMEGA is no longer useful hereon)
4. Use the temp plot and continue to tap up TGHT to reach 1800 C and hold it for at least 4 hours or until the vacuum goes below 1 e-6 Torr then proceed with cooling down.
5. Use the auto cooling program for TGHT (-2A/min) and TBHT (-1A/min)
Note: For ramping up TGHT, keep vacuum below 1.5 e-4 Torr and keep tapping up to reach 1800 C. Above 1100 C, this should be a quick step to get to 1800 C; should take < 2 hrs to get there.
See the striptool or the attachment below to see how I did it.
Once the chamber is cool down, take out a few samples for SEM analysis.
Good luck!
|
Tuesday, November 26, 2019, 15:43, Anders Mjos, SiC, 42464-3, HP-FEBIAD, Problems resolved, Water to vacuum leak on heat shield line
|
This morning, the vacuum responded to shutting of the water of the heat shield circuit (leak rate without pumping leveling out). The vacuum chamber was vented and the heat shield with flexible lines was replaced with another heat shield with fixed lines. The chamber was again pumped down and water opened at ~150 mTorr to test the leak up rate without pumping. No leaks apparent, so continued pumping down with turbo pump. At a vacuum of about 1E-6 Torr the water was again supplied to the heat shield circuit and an increase in vacuum could be observed. Stopped the turbo pump and prepared to vent. Two new heat shield lines were brazed in the machine shop and fitted by Maico after lunch. During this time one of the old lines (from heat shield to feedthrough in box) was leak tested and a leak found at a location just above the VCR. The line had been twisted and due to the twist developed a leak. With the two lines replaced, the vacuum was pumped down again and water could be supplied without any increase in vacuum pressure at 1E-6 Torr. To facilitate the new copper tubing, the restraining bracket for the heat shield VCRs was not mounted. It will have to be fitted later. Until then, please contact Anders for help in removing the heat shield to prevent any damage to the new lines. |
Monday, November 25, 2019, 11:35, Aaron Schmidt, , , , In progress, Flex - line HS installed
|
Leak noted on previous TaC sintering on HP FEBIAD # 42464-3.
Swapped out gaskets on HS flex line a re-tightened.
Monday, November 25, 2019, 11:31: Roughing.
Monday, November 25, 2019, 11:42: Turbo pump on.
Monday, November 25, 2019, 13:38: Vacuum @ 7.29e-06T.
Monday, November 25, 2019, 13:42: Waterlines opened. Vacuum slowly climbed to 7.57e-06T. Waterlines closed / purged.
Monday, November 25, 2019, 13:47: Vacuum @ 6.83e-06T.
Monday, November 25, 2019, 13:50: Waterlines opened. Vacuum gradually climbed again. Waterlines closed / purged.
Monday, November 25, 2019, 13:51: Turbo pump off.
Monday, November 25, 2019, 14:41: Vent. Check seals (All on HS line).
Monday, November 25, 2019, 14:48: Roughing.
Monday, November 25, 2019, 15:06: Vacuum @ 1.22e-04T. Waterlines opened. Vacuum continued to pump down steadily to 8.86e-05T and dropping.
Monday, November 25, 2019, 15:07: Turbo pump off. |
Saturday, November 23, 2019, 14:03, Darwin Ortiz Rosales, TaC, 42464-3, HP-FEBIAD, Done, TaC coating/sintering
|
12.3
Saturday, November 23, 2019, 14:00
Container coated with TaC and wrapped with 3 Ta heat shields.
Desired temperature= 1900 C, Omega Slope set = 0.990, Auto TGHT at 0.2A/min to reach 400A, TGHT will be tapped up accordingly to reach desired Temp.
TBHT will be set fixed at 230 A (max).
Good vac at 3.00e -5 Torr
Bad vac at 5.00e-5 Torr
Chamber pump down was started on Friday November 22; however.
No leaks were observed when turning water lines on.
IGP1= 4.6e-07 Torr
Saturday, November 23, 2019, 15:30
autoramp at 0.5A /min up to 50A for both TGHT and TBHT and maintained for 1 hour.
Saturday, November 23, 2019, 16:15
IGP1= 1.1e-06 Torr
Auto Ramp to 450 A on THGT and 230A on TBHT at 0.5A/min
Saturday, November 23, 2019, 23:44
IGP1= 5.2e-06 Torr
TGHT = 248A, 2.9V TBHT= 233A 2.9V
Increased ramp step to 1A/min to 620 A
Sunday, November 24, 2019, 00:14
IGP1=1.9e-06 Torr
TGHT = 274.3, 3.3V TBHT= 233A, 2.9V
Sunday, November 24, 2019, 07:33
IGP1=3.2e-06 Torr
OMEGA= 1490C
TGHT = 619 A, 9.1V TBHT=233A, 2.9V
Continue ramping THGT at 1A/min to 700 A
Sunday, November 24, 2019, 10:05
IGP1= 2.1 e-05 Torr
OMEGA= 1676 C
TGHT= 700A, 10.6V TBHT= 233A, 2.0V
Start autoramp to 780A as per regression in attachment
Sunday, November 24, 2019, 13:22
Autoramp to 795A for TGHT
Sunday, November 24, 2019, 21:16
OMEGA= 1854 C
TGHT= 789.6A, 12.27V TBHT= 233.A, 2.9V
IGP1= 2.0e-05
Will allow pressure to stabilize lower.
Sunday, November 24, 2019, 22:16
TGHTT= 789.6A, 12.3V TBHT=233.3A, 2.9V
OMEGA=1855C
IGP1 = 6.9e-06Torr
Start cooling TGHT at 2A/min and TBHT at 1A/min |
Friday, November 22, 2019, 18:32, Fernando Maldonado & Marla Cervantes , TaC, , HP-FEBIAD, In progress, TaC coating/sintering
|
Friday, November 22, 2019, 18:18:
Friday, November 22, 2019, 18:18: Roughing
Friday, November 22, 2019, 18:23: Turbo on .
Friday, November 22, 2019, 18:32: Turbo at speed
|
Thursday, November 21, 2019, 08:10, Aaron Schmidt, SiC, , HP-FEBIAD, In progress, Temperature mapping.
|
Thursday, November 21, 2019, 08:09: PS on. Leak issue resolved (Evap 2 Elog 466). Vacuum @ 4.10e-07T.
Thursday, November 21, 2019, 08:15: Auto-ramping TGHT / TBHT @ 2 A per min to 300 / 150 A. |
Friday, November 15, 2019, 13:26, Aaron Schmidt, SiC, , HP-FEBIAD, Problems resolved, Temp map testing - 1. (Leak issue)
|
HS 42752-5 - Setup for Temperature mapping.
Friday, November 15, 2019, 13:26: Roughing.
Friday, November 15, 2019, 13:36: Turbo pump on.
Monday, November 18, 2019, 07:46: Waterlines opened. Vacuum ok @ 3.56e-07T.
Monday, November 18, 2019, 07:48: PS on.
Monday, November 18, 2019, 09:21: PS off. Vacuum slowly spiked to 1.23e-06T. Indicative of a small water leak.
Monday, November 18, 2019, 09:24: HS waterlines purged. vacuum dropped to 5.54e-07T.
Monday, November 18, 2019, 09:27: Valves closed. TP off. BP off.
Monday, November 18, 2019, 10:27: Venting.
Monday, November 18, 2019, 11:06: Gaskets checked / replaced. Roughing.
Monday, November 18, 2019, 11:14: turbo pump on.
Monday, November 18, 2019, 14:19: Waterlines opened.
Monday, November 18, 2019, 14:23: Response on vacuum. Leak is still present & a higher rate (Has an immediate response). Turbos off.
Monday, November 18, 2019, 14:28: Venting.
Monday, November 18, 2019, 14:49: turbo pump on.
Tuesday, November 19, 2019, 07:07: Waterlines opened. Leak is present. Turbo pump off.
Tuesday, November 19, 2019, 11:24: After venting, changed 1 gasket. Setup LD & completed a leak check with the lines pressurized to 75 PSI of He.
Tuesday, November 19, 2019, 11:25: Roughing.
Tuesday, November 19, 2019, 11:33: Turbo pump on.
Wednesday, November 20, 2019, 08:59: Waterlines opened. Leak is present. Turbo pump off.
Wednesday, November 20, 2019, 11:26: FEBIAD Removed. U-Line installed to check Evap 2 Connection. FEBIAD examined outside.
Wednesday, November 20, 2019, 11:34: Turbo pump on.
Wednesday, November 20, 2019, 13:05: HPA off (Was running through HS line still. Vac @ 5.54e-06T).
Wednesday, November 20, 2019, 13:07: Open waterline. Vacuum @ 3.88e-06T & dropping steadily.
Wednesday, November 20, 2019, 13:12: Vacuum @ 3.69e-06T & dropping. No leak detected via Vac.
Wednesday, November 20, 2019, 13:14: Waterline Closed / purged. Turbo pumps off.
Wednesday, November 20, 2019, 13:58: Turbo pump on.
Wednesday, November 20, 2019, 13:50: Cleaned seal / FEBIAD re-installed. Roughing.
Thursday, November 21, 2019, 08:06: Waterlines opened. Vacuum ok @ 4.10e-07T.
Notes:
1) The FEBIAD left cooling line was the culprit for the leaks. A fine copper build up was noted on the gasket / sealing face. Images included.
2) Evap 2 was leak checked separately as well & is OK. |
Monday, November 04, 2019, 14:25, Darwin Ortiz Rosales, Endcaps, 40282-4, TARGET BOAT, Done,
|
Monday, November 04, 2019, 14:19
Each endcap is separated with a disc of graphite foil and rolled into packs one pack of 4 and one pack of 8 within a foil envelope in a target boat.
There are also 3 coated springs interspersed.
The boat is wrapped with 3-layers of Ta heatshields.
Chamber pumped down overnight.
OMEGA slope = 0.99
Will Tap TGHT up to 40 A then autoramp to 400A at 1A/min.
Final desired temperature on OMEGA (tap)= 1800C
Tuesday, November 05, 2019, 11:30
IGP1 = 9.6e-7 Torr
Autoramp TGHT to 40A at 1A/min
Tuesday, November 05, 2019, 11:44
IGP1= 2.6e-06 Torr
TGHT = 40.8 A, 0.37V
Will leave at 40 A for 1 hour
Tuesday, November 05, 2019, 12:39
IGP1=2.5e-6 Torr
TGHT =40.0A, .33V
Start ramping TGHT to 400A at 0.1A/min
Wednesday, November 06, 2019, 09:32
IGP1=7.8e-7 Torr
TGHT = 168.4A, 2.38V
increase ramp speed to 1A/min
Wednesday, November 06, 2019, 14:07
IGP1= 2.34e-6 Torr
TGHT=400.0 A, 6.98V
set TGHT autoramp to 460A @ 1A/min aiming for 1850C (see attached plot)
Wednesday, November 06, 2019, 15:18
OMEGA = 1776 C
TGHT = 460.0A, 8.52V
IGP1= 4.7e-6 Torr
Starting manual tap up to 1810C
Wednesday, November 06, 2019, 15:36
OMEGA=1810 C
TGHT = 468.8A, 8.74V
IGP1=4.14e-6
Wednesday, November 06, 2019, 19:04
OMEGA=1822 C (has been between 1817-1824 C over 3.5 hours )
TGHT=468.8A, 8.67V
IGP1=1.9498e-06 Torr
Start TGHT ramp down at -2A/min
Thursday, November 07, 2019, 09:55
THGT = 0A, 0V overnight
IGP1= 3.2 e-07 Torr
Proceeding with unloading.
End caps looked good for online use.
|
|