Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 10 of 34  Not logged in ELOG logo
  ID Date Authordown Target Material Target Oven W.O# Source Status Subject Text Attachments
  269   Friday, January 08, 2016, 11:15 Laura LambertTa41369-5HP-SISDoneTemperature measurements

    

       
            
  
  270   Monday, January 11, 2016, 15:47 Laura LambertSiC41077-3LP-SISDoneConditioning SiC test target for test stand measurementsMonday, January 11, 2016, 15:25
Small center block LP-SIS
 Photo_2016-0-13.jpgPhoto_2016-01-13_#2.jpgPhoto_2016-01-13_#3.jpgPhoto_2016-01-13_#4.jpg 
  271   Thursday, January 14, 2016, 11:48 Laura Lambert   MaintenanceBacking Pump Replaced Thursday, January 14, 2016, 11:47
Backing pump was making very loud
high pitched noises during last couple processes
  
  273   Friday, February 12, 2016, 11:09 Laura LambertEmpty41077-1LP-SISDonesintering TaC coated small center block container Friday, February 12, 2016, 11:01
Container coated with
  
  274   Tuesday, February 16, 2016, 14:02 Laura LambertEmpty40202-5TARGET BOATIn progresssintered TaC coating on target boat [container style with no ionizer tube] Tuesday, February 16, 2016, 14:19
coated with TaC yesterday and let
dry overnight.
  
  276   Thursday, February 18, 2016, 17:21 Laura LambertEmpty40202-5TARGET BOATDonesintered TaC coating on target boat [container style with no ionizer tube]

    

       
            
  
  280   Monday, March 14, 2016, 09:22 Laura LambertTa41790-1LP-SISIn progressTa#47 LP-SIS (with new center block) conditioning

    

       
            
  
  291   Tuesday, April 26, 2016, 13:50 Laura LambertEmpty40860-2LP-IG-LISDonesintering TaC coating on UCx#16 containerTuesday, April 26, 2016, 13:32
Container coated with TaC using
 TaC_coating_sintered1.jpgTaC_coating_sintered2.jpgTaC_coating_sintered3.jpg 
  292   Tuesday, May 03, 2016, 14:44 Laura Lambert    VACUUM PUMP REPLACEMENT Tuesday, May 03, 2016, 14:29
Turned vacuum pump on this morning,
sounded awful: loud grinding bad noises.
  
  293   Wednesday, May 04, 2016, 13:45 Laura Lambert 40282-3TARGET BOATIn progressConditioning Nb samples for Tobias Wednesday, May 04, 2016, 13:28
Target boat has a layer of niobium
foil on the bottom of the boat.
 Nb_samples_in_boat_(2).jpg 
  295   Tuesday, May 10, 2016, 11:57 Laura Lambert 40282-3TARGET BOATDoneConditioning Nb samples for Tobias

    

       
            
  
  298   Friday, May 20, 2016, 08:54 Laura LambertSiC TARGET BOATIn progressHeat-treatment: Beta-SiC (1um) target discs

    

       
            
  
  300   Wednesday, May 25, 2016, 11:40 Laura LambertEmpty41369-4HP-SISIn progresssintering TaC coating on SiC#33 container Wednesday, May 25, 2016, 11:37
Container coated with TaC using
  
  302   Thursday, June 09, 2016, 15:48 Laura LambertSiC41369-4HP-SISIn progressSintering SiC#33 - 1st beta-SiC target! Thursday, June 09, 2016, 15:39
First target using beta-SiC material!
 target_with_end-coils.jpg 
  304   Monday, June 13, 2016, 09:53 Laura LambertSiC41369-4HP-SISIn progressSintering SiC#33 - 1st beta-SiC target!

    

       
            
 current_vs_voltage_vs_temp.xlsxTapping_up_from_520A_to_1800C.JPG 
  306   Thursday, June 16, 2016, 10:58 Laura LambertSiC41369-4HP-SISDoneSintering SiC#33 - 1st beta-SiC target!

    

       
            
  
  307   Thursday, June 16, 2016, 11:01 Laura LambertSiC41369-4HP-SISDoneConditioning SiC#33 - 1st beta SiC target! Thursday, June 16, 2016, 10:59
Previously sintered over weekend
[see elog i.d 306]
 9x 
  308   Monday, June 27, 2016, 11:08 Laura LambertEmpty41790-3LP-SISDonesintering TaC coating on UCx#17 container Monday, June 27, 2016, 11:07
Container coated with TaC using
 LP-SIS_post_sintering_TaC(3).jpgLP-SIS_post_sintering_TaC(4).jpg 
  309   Friday, July 15, 2016, 11:52 Laura LambertEmpty40860-3LP-IG-LISDonesintering TaC coating on SiC#34 container Friday, July 15, 2016, 11:49
Container previously coated
 Evernote_Camera_Roll_20160524_134232.jpgEvernote_Camera_Roll_20160524_134233.jpgEvernote_Camera_Roll_20160524_1342331.jpgEvernote_Camera_Roll_20160524_1342332.jpgsnapshot_of_striptool_sintering_TaC_coating.JPG 
  310   Tuesday, July 26, 2016, 16:53 Laura LambertTa41369-6HP-SISDoneConditioning Ta#49 Tuesday, July 26, 2016, 16:50
loaded into evap2
pumped down, HS water valves opened,
  
ELOG V2.9.2-2455