  Evaporator_1, Page 7 of 15  Not logged in ELOG logo
  ID Date Author Target Material Target Oven W.O# Source Statusdown Subject Text Attachments
  10   Monday, April 11, 2011, 10:22 John WongEmpty38295-9HP-FEBIADDoneFins diffusion bonding Mon Apr 11 10:21:56 2011: Target is wrapped
with 3 Ta-heat shields.  Evaporator
is pumping down. 
 pumping_down.jpgAutoheating_parameter_setup.jpggrab.A29589.png 
  11   Tuesday, April 12, 2011, 10:30 John WongEmpty38481-5HP-FEBIADDoneFins diffusion bonding Tue Apr 12 10:29:38 2011:  Target
wrapped with 3 Ta-heat shields.  Evaporator
is currently being pumped down.
 grab.s31535.pnggrab.c31573.pngcooling_down.jpg 
  12   Wednesday, April 13, 2011, 10:37 John WongEmpty38481-7HP-FEBIADDoneDiffusion bonding of Ta Fins for FEBIAD-HPWed Apr 13 10:37:25 2011:  Target
is wrapped with 3 Ta-heat shields. 
Evaporator is currently being pumped down.
 pumping_down.jpgAutoheating_parameter_setup.jpgcooling_down.jpgwasher_on_target_leg.jpg 
  13   Thursday, April 14, 2011, 09:53 John WongEmpty37810-1HP-FEBIADDoneFins Diffusion bonding Thu Apr 14 09:52:59 2011: Target is wrapped
with 3-Ta heat shield and ready to go into
the evaporator. 
 cooling_down.jpg 
  17   Wednesday, April 20, 2011, 16:42 John WongEmpty38481-8HP-FEBIADDoneSintering target oven coated with TaCWed Apr 20 16:39:46 2011:  Target
oven was coated with TaC early today. 
The target was allowed to dry and then wrapped
 overall_process.jpg 
  18   Monday, May 09, 2011, 16:10 John WongEmpty38817-1HP-SISDoneDiffusion bonding of Ta FinsMon May  9 16:09:35 2011:  Target
is wrapped with 3 Ta heatshields and the
evaporator is begin pumped down.
 TGHT_ramping_up.gifoverall_process.jpg 
  19   Tuesday, May 10, 2011, 14:58 John WongEmpty38817-2HP-SISDoneDiffusion bonding of Ta Fins for HP-SIS (w.o#38817-2) Tue May 10 14:56:05 2011:  Target
is wrapped with 3 heat-shields.  The
evaporator is pumping down, vac @ 4.72e-6
 starting_process.jpgoverall_process.gif 
  23   Wednesday, May 25, 2011, 14:42 John WongUO2/CUCx-heatboat#1LP-SISDoneBatch#1: UO2/C mixing & carbonizationBefore began the carbonization process,
two cameras were setup in the hotlab for
monitoring the evaporator and the power supply.
 Screen_shot_2011-05-26_at_3.14.00_PM.pngauto_ramping.pngUCx_2011_A_carbonization.pngEvaporator_Ar_flow.pngUC2.png 
  24   Thursday, June 30, 2011, 12:42 John WongUO2/CUCx-heatboat#1LP-SISDoneBatch#2: UO2/C for carbonizationBefore began the
carbonization process, two cameras were setup
 startup_vac.jpgstartup_current.jpgparameter.jpgUCx_2011_b_3days.pnggrab.S13888.png 
  25   Monday, July 18, 2011, 15:55 John WongEmpty38634-3LP-SISDoneSintering TaC coating for UCx#2 Monday, July 18, 2011, 15:53:  Target
oven was coated with TaC and let dry over
the weekend.  The target is now installed
 striptool.jpg 
  27   Wednesday, August 03, 2011, 17:16 John WongEmpty38634-8LP-SISDoneSintering TaC coating Wednesday, August 03, 2011, 20:27 :  Target
was wrapped with 3 new Ta-heat shields and
2 around the back block.  The tar from
 striptool.JPG 
  29   Monday, August 29, 2011, 11:21 John WongEmpty38634-6LP-SISDoneSintering TaC coating oven for TaC#1 Monday, August 29, 2011, 13:16: Target
oven was coated with TaC and let dry over
night.  The target oven is in the evaporator
 TaC_target_oven.JPG 
  30   Tuesday, August 30, 2011, 09:31 Anders MjosEmptyTarget BoatLP-SISDoneSintering of End CapsTuesday, August 30, 2011, 09:29: Target
Boat wrapped with 3 Ta heat shields. 6 D-End
Caps and 6 End Caps coated with TaC. Pumping
  
  31   Tuesday, August 30, 2011, 16:30 John WongEmptyTarget BoatLP-SISDoneSintering of End Caps


   
        
            
  
  32   Tuesday, September 06, 2011, 17:05 John WongEmpty38634-6LP-SISDoneSintering TaC coating oven for TaC#1


   
        
            
 striptool.JPG 
  34   Wednesday, September 07, 2011, 13:41 John WongTaC38634-6LP-SISDoneTaC#1: Sintering and Organics burn-off Wednesday, September 07, 2011, 15:31
125 discs of TaC/C
Total discs mass = 125
 TaC#1.jpgendcaps_after_sintering.pngTaC_aftersintering.jpg 
  36   Friday, September 09, 2011, 10:05 John WongEmpty HP-FEBIADDoneSintering TaC coatingFriday, September 09, 2011, 10:05
Target oven coated with TaC, and
wrapped with 3-Ta heat shields.  Chamber
 striptool.JPG 
  37   Monday, September 12, 2011, 13:08 John WongEmptyTarget Boat DoneSintering TaC coating on End CapsMonday, September 12, 2011, 13:07
Target boat is loaded with coated
TaC end caps for sintering.  Target
 striptool.JPG 
  38   Tuesday, September 13, 2011, 16:53 John WongSiC38295-9HP-FEBIADDoneReady Tuesday, September 13, 2011, 16:51
Target is wrapped with 3-Ta heat
shields. 
 9x 
  39   Wednesday, September 21, 2011, 13:23 John WongEmpty38634-10LP-SISDoneSintering TaC coating on target oven for UCx#3 Wednesday, September 21, 2011, 13:23
Target oven was wrapped with 3-Ta
heatshields including the back block. 
 archiver_TGHT0-580A.JPG 