Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_1, Page 6 of 15  Not logged in ELOG logo
ID Date Author Target Material Target Oven W.O#down Source Status Subject Text Attachments
  190   Thursday, February 08, 2018, 14:51 Marla CervantesUO2/C40282-2 TARGET BOATProblemsCarbonizing UO2/C discs for 1stepUCx in graphite sample container _#10 Thursday, February 08, 2018, 14:50
35 circles from cast#2 of 14
  
  191   Friday, February 09, 2018, 16:57 Marla CervantesUO2/C40282-2 TARGET BOATProblems resolvedCarbonizing UO2/C discs for 1stepUCx in graphite sample container _#10

    

       
            
  
  192   Friday, February 09, 2018, 17:04 Marla CervantesUO2/C40282-2 TARGET BOATDoneCarbonizing UO2/C discs for 1stepUCx in graphite sample container _#10

    

       
            
 20180209_153539.jpg20180209_153728.jpg20180209_153817.jpgCarbonization-current_trippoff.JPGCarbonization-Batch10-090218.docx 
  197   Monday, March 12, 2018, 11:14 Marla CervantesUO2/C40282-2 TARGET BOATDoneCarbonizing UO2/C discs for 1stepUCx in graphite sample container _#12 Monday, March 12, 2018, 9:13
35 circles from cast#2 of 14
  
  96   Friday, July 04, 2014, 10:23 John WongThO240282-2TARGET BOATDoneTest: Sintering ThO2 with Nb backing foils Friday, July 04, 2014, 10:13
Target boat contains 4 set of samples. 
Each sample consists of 5pack ThO2/Nb. 
 2014-07-03_12.29.29.jpgThO_raw_green_sintered_30um.pngpressure_current_plot.PNG 
  97   Wednesday, July 09, 2014, 13:57 Laura LambertThO240282-2TARGET BOATDoneTest: Sintering ThO2 with Nb backing foils

    

       
            
 test_batch_full_sintering.JPGjul9_2014_(2).jpg 
  164   Wednesday, August 23, 2017, 15:54 Laura LambertUO2/C40282-2TARGET BOATDoneCarbonizing UC2 discs for 1stepUCx in graphite sample container _#1 Wednesday, August 23, 2017, 15:41
2 rounds of UO2/C were cast
 IMG_1768.JPGIMG_1774.JPG 
  173   Tuesday, November 14, 2017, 16:16 Laura LambertUO2/C40282-2TARGET BOATDoneCarbonizing UC2 discs for 1stepUCx in graphite sample container _#2 Tuesday, November 14, 2017, 16:12
Circles from cast 1 were used,
 striptool.JPG 
  199   Wednesday, March 28, 2018, 11:46 Laura LambertUO2/C40282-2TARGET BOATIn progressCarbonizing first full length 1step UCx target Wednesday, March 28, 2018, 11:35
D-shaped discs were cut from
  
  200   Monday, April 09, 2018, 16:51 Laura LambertUO2/C40282-2TARGET BOATProblemsCarbonizing first full length 1step UCx target

    

       
            
 evap1_trip.JPGevap1_trip_archive.JPG 
  201   Monday, April 09, 2018, 16:53 Laura LambertUO2/C40282-2TARGET BOATProblems resolvedCarbonizing first full length 1step UCx target

    

       
            
  
  202   Tuesday, April 10, 2018, 14:49 Laura LambertUO2/C40282-2TARGET BOATDoneCarbonizing first full length 1step UCx target

    

       
            
  
  203   Tuesday, April 17, 2018, 12:45 Laura LambertUO2/C40282-2TARGET BOATDoneProcessing UC2Flk_20 Tuesday, April 17, 2018, 10:30
UO2/C green was prepared April
  
  85   Thursday, January 23, 2014, 16:29 Laura LambertEmpty40282-1TARGET BOATIn progressSintering Ta target boat with TaC coatingThursday, January 23, 2014, 16:26 
 A new target boat was sprayed
with TaC coating and let dry, the coating
 IMG_20140123_143448877.jpgIMG_20140123_143507747.jpg 
  86   Friday, January 24, 2014, 14:45 Laura LambertEmpty40282-1TARGET BOATIn progressSintering Ta target boat with TaC coating

    

       
            
  
  87   Monday, January 27, 2014, 11:03 Laura LambertEmpty40282-1TARGET BOATDoneSintering Ta target boat with TaC coating

    

       
            
 IMG_20140128_113257662.jpg 
  88   Wednesday, February 05, 2014, 14:29 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_01 Wednesday, February 05, 2014, 14:13
1st attempt: 
UO2/C green was prepared on Feb 4,
 UO2_cast1.jpgUO2_cast2.jpgUO2_target_boat.jpgpre_auto-ramp.JPG 
  99   Tuesday, August 26, 2014, 15:27 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_03 Tuesday, August 26, 2014, 11:54
UO2/C green was prepared Aug 20,
2014. The slurry was cast on a piece of glass
 carbonization.JPG 
  100   Tuesday, September 23, 2014, 15:00 Laura LambertUO2/C40282-1TARGET BOATIn progressProcessing UC2Flk_04 Tuesday, September 23, 2014, 14:54
UO2/C green was prepared Sept 18,
2014. The slurry was cast on a piece of glass
  
  101   Friday, October 10, 2014, 14:00 John WongUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_04

    

       
            
 archiver_TGHT&VAC.PNG 
ELOG V2.9.2-2455