ID |
Date |
Author |
Target Material |
Target Oven W.O# |
Source |
Status |
Subject |
Text |
|
256
|
Thursday, January 30, 2020, 11:53 |
Marla Cervantes | UO2/C | P2N-02 | | Problems resolved | P2N target material carbothermal reduction |
|
|
257
|
Thursday, January 30, 2020, 13:11 |
Marla Cervantes | UO2/C | P2N-02 | | Problems | P2N target material carbothermal reduction |
|
|
258
|
Friday, January 31, 2020, 15:36 |
Marla Cervantes | UO2/C | P2N-02 | | Done | P2N target material carbothermal reduction |
|
|
259
|
Tuesday, May 26, 2020, 20:44 |
Darwin Ortiz Rosales | UO2/C | | TARGET BOAT | Done | UCx#33 Carbothermal Reduction | Tuesday, May 26, 2019,
18:20 |
|
262
|
Wednesday, June 03, 2020, 08:10 |
Darwin Ortiz Rosales | UO2/C | | TARGET BOAT | Done | UCx#34 Carbothermal Reduction | Wednesday, June 03, 2020, 08:11
A loaded graphite cartridge |
|
263
|
Thursday, August 13, 2020, 14:37 |
Marla Cervantes | UO2/C | P2N-02 | | Problems | P2N target material carbothermal reduction |
|
|
265
|
Tuesday, August 18, 2020, 20:45 |
Marla Cervantes | UO2/C | P2N-02 | | Problems resolved | P2N target material carbothermal reduction |
|
|
266
|
Wednesday, August 19, 2020, 07:49 |
Marla Cervantes | UO2/C | P2N-02 | | Done | P2N carbothermal reduction (#2) | Wednesday,
August 19, 2020, 07:47
|
|
267
|
Tuesday, September 08, 2020, 20:45 |
Marla Cervantes | UO2/C | P2N-02 | | Done | P2N-2 carbothermal reduction | Tuesday, September 08, 2020, 20:44
A P2N oven with three heat shields, |
|
268
|
Thursday, September 10, 2020, 14:07 |
Marla Cervantes | UO2/C | P2N-02 | | Done | P2N-2 Conditioning | Thursday, September 10, 2020, 14:01
A P2N target was carbothermal reduced
but at the maximum current, the power supply |
|
269
|
Tuesday, March 30, 2021, 16:04 |
Marla Cervantes | UO2/C | P2N-02 | | Done | P2N-3 carbothermal reduction | Green
target material characteristics (elog |
|
272
|
Wednesday, June 30, 2021, 13:35 |
Darwin Ortiz Rosales | UO2/C | | TARGET BOAT | Done | UCx#34 conditioning | Target
#34 was installed in the EVAP1 and pumped
down (Tuesday June 29, 2021). |
|
273
|
Wednesday, July 07, 2021, 12:40 |
Darwin Ortiz Rosales | UO2/C | | TARGET BOAT | Done | UCx Provisional ID= 200229 conditioning | Wednesday, July 07, 2021, 14:39
Target Provisional ID = 200929 |
|
275
|
Thursday, September 23, 2021, 07:03 |
Darwin Ortiz Rosales | UO2/C | | TARGET BOAT | Done | UCx#35 C reduction | Thursday, September 23, 2021, 06:55
A loaded graphite cartridge |
|
281
|
Wednesday, June 01, 2022, 08:42 |
Darwin Ortiz Rosales | UO2/C | Target Boat | | Done | UO2 reduction Provisional ID C211209-1 | Wednesday, June 01, 2022, 08:39
A loaded graphite cartridge |
|
282
|
Friday, June 03, 2022, 06:21 |
Darwin Ortiz Rosales | UO2/C | 42218-4 | LP-IG-LIS | Done | UCx#39 reduction |
Friday, June 03, 2022, 06:24
|
|
283
|
Tuesday, June 07, 2022, 07:09 |
Darwin Ortiz Rosales | UO2/C | Target Boat | | Done | UO2 reduction ID C220510-1 | Tuesday, June 07, 2022, 07:05
A loaded graphite cartridge |
|
284
|
Friday, October 07, 2022, 08:14 |
Darwin Ortiz Rosales | UO2/C | | LP-SIS | Done | C-220928UCx conditioning experiments | Friday, October 07, 2022, 07:55
Cartridge-220928UCx was installed |
|
286
|
Monday, November 28, 2022, 05:59 |
Darwin Ortiz Rosales | UO2/C | | LP-SIS | Done | C221125experiment | Monday, November 28, 2022, 05:58
Left weekend to pump down
current IGPI= 7.23e-7 Torr |
|
287
|
Monday, December 19, 2022, 10:45 |
Darwin Ortiz Rosales | UO2/C | | LP TUBE | Done | C-221207 Reduction | Monday, December 19, 2022, 10:38
Cartridge with 175 discs (including
5 analysis discs) loaded into a graphite |
|