ID |
Date |
Author |
Target Material |
Target Oven W.O# |
Source |
Status |
Subject |
Text |
|
23
|
Wednesday, May 25, 2011, 14:42 |
John Wong | UO2/C | UCx-heatboat#1 | LP-SIS | Done | Batch#1: UO2/C mixing & carbonization | Before began the carbonization process,
two cameras were setup in the hotlab for
monitoring the evaporator and the power supply. |
|
24
|
Thursday, June 30, 2011, 12:42 |
John Wong | UO2/C | UCx-heatboat#1 | LP-SIS | Done | Batch#2: UO2/C for carbonization | Before began the
carbonization process, two cameras were setup |
|
25
|
Monday, July 18, 2011, 15:55 |
John Wong | Empty | 38634-3 | LP-SIS | Done | Sintering TaC coating for UCx#2 | Monday, July 18, 2011, 15:53: Target
oven was coated with TaC and let dry over
the weekend. The target is now installed |
|
26
|
Wednesday, July 27, 2011, 13:02 |
John Wong | UC2 | 38634-3 | LP-SIS | Problems | UCx#2 conditioning | Wednesday, July 27, 2011, 12:58:
Target length = 11.2cm
Total UC2/C foils = 245 discs |
|
27
|
Wednesday, August 03, 2011, 17:16 |
John Wong | Empty | 38634-8 | LP-SIS | Done | Sintering TaC coating | Wednesday, August 03, 2011, 20:27 : Target
was wrapped with 3 new Ta-heat shields and
2 around the back block. The tar from |
|
28
|
Thursday, August 04, 2011, 17:46 |
John Wong | UC2 | 38634-8 | LP-SIS | Problems resolved | Repacking UCx in new target oven | Thursday, August 04, 2011, 17:44:
All the UCx material from target oven 38634-3
was recovered and repacked in this new oven. |
|
29
|
Monday, August 29, 2011, 11:21 |
John Wong | Empty | 38634-6 | LP-SIS | Done | Sintering TaC coating oven for TaC#1 | Monday, August 29, 2011, 13:16: Target
oven was coated with TaC and let dry over
night. The target oven is in the evaporator |
|
30
|
Tuesday, August 30, 2011, 09:31 |
Anders Mjos | Empty | Target Boat | LP-SIS | Done | Sintering of End Caps | Tuesday, August 30, 2011, 09:29: Target
Boat wrapped with 3 Ta heat shields. 6 D-End
Caps and 6 End Caps coated with TaC. Pumping |
|
31
|
Tuesday, August 30, 2011, 16:30 |
John Wong | Empty | Target Boat | LP-SIS | Done | Sintering of End Caps |
|
|
32
|
Tuesday, September 06, 2011, 17:05 |
John Wong | Empty | 38634-6 | LP-SIS | Done | Sintering TaC coating oven for TaC#1 |
|
|
34
|
Wednesday, September 07, 2011, 13:41 |
John Wong | TaC | 38634-6 | LP-SIS | Done | TaC#1: Sintering and Organics burn-off | Wednesday, September 07, 2011, 15:31
125 discs of TaC/C
Total discs mass = 125 |
|
39
|
Wednesday, September 21, 2011, 13:23 |
John Wong | Empty | 38634-10 | LP-SIS | Done | Sintering TaC coating on target oven for UCx#3 | Wednesday, September 21, 2011, 13:23
Target oven was wrapped with 3-Ta
heatshields including the back block. |
|
40
|
Thursday, September 22, 2011, 20:34 |
John Wong | Empty | 38634-9 | LP-SIS | Done | Sintering TaC coating for UCx#2 (spare) | Thursday, September 22, 2011, 20:21
Target oven was wrapped with 3 Ta-heat
shields and has been pumping down. |
|
43
|
Thursday, November 03, 2011, 09:24 |
John Wong | UC2 | 38634-10 | LP-SIS | Done | UCx#3: Final conditioning | Thursday, November 03, 2011, 08:59
Target was previously coated/sintered
with TaC & wrapped with 3 Ta-heat shields, |
|
44
|
Monday, November 14, 2011, 11:56 |
Peter Kunz | UC2 | 38634-10 | LP-SIS | Done | UCx03: Conditioning up to 175A | Evaporator was cleaned Nov 11 from after
target was conditioned up to 175A. There
was significant condensation of oily fluid |
|
55
|
Tuesday, July 10, 2012, 12:54 |
John Wong | UC2 | 38634-9 | LP-SIS | Done | UCx#4 final conditioning completed | Tuesday, July 10, 2012, 12:44
Target contains 230 discs of UCx
(material from UC2 flakes, batch#01-04062012). |
|
57
|
Friday, August 24, 2012, 16:44 |
John Wong | UC2 | 39165-5 | LP-SIS | In progress | Conditioning UCx#5 | Friday, August 24, 2012, 16:40
Target is loaded with 245 discs of
UCx (material from batch#02-13062012), |
|
58
|
Monday, September 03, 2012, 02:56 |
Peter Kunz | UC2 | 39165-5 | LP-SIS | In progress | Conditioning UCx05 | Organic/volatile burnoff complete at TGHT
= 190A. Rampdown initiated. |
|
59
|
Tuesday, September 04, 2012, 17:26 |
Peter Kunz | UC2 | 39165-5 | LP-SIS | In progress | Conditioning UCx05 | Organic gunk cleaned out. Beginning 2nd phase
of conditioning. |
|
60
|
Friday, September 07, 2012, 17:21 |
Peter Kunz | UC2 | 39165-5 | LP-SIS | In progress | Conditioning UCx05 | Target 6h at 520A. IEVAP:IG1 8.4e-6 Torr.
Cool down sequence initiated. |
|