190
|
Thursday, February 08, 2018, 14:51 |
Marla Cervantes | UO2/C | 40282-2 | TARGET BOAT | Problems | Carbonizing UO2/C discs for 1stepUCx in graphite sample container _#10 | Thursday, February 08, 2018, 14:50
35 circles from cast#2 of 14 mm diameter were packed into a graphite sample container.
35 x UO2/C circles = 4.76 g
Graphite container = 5.3 g
Graphite tube is placed inside a target boat.
Boat previously coated with TaC and sintered.
Ta-target boat is wrapped with 3 new Ta foils for heat shielding and the boat was installed in Evap1.
Chamber currently pumping down.
Friday, February 09, 2018, 10:40
Initial IGP1 = 4.54e-7 Torr
Tapped up entire process manually to 520A in 25 min
TGHT = 520 A, 5.49 V
Vacuum coming down indicating carbonization process complete.
Current suddenly tripped off from 520 A to 0 A.
There was not a power outage.
There was good vacuum.
Water cooling did not trip off
|
|
191
|
Friday, February 09, 2018, 16:57 |
Marla Cervantes | UO2/C | 40282-2 | TARGET BOAT | Problems resolved | Carbonizing UO2/C discs for 1stepUCx in graphite sample container _#10 |
Marla Cervantes wrote: |
Thursday, February 08, 2018, 14:50
35 circles from cast#2 of 14 mm diameter were packed into a graphite sample container.
35 x UO2/C circles = 4.76 g
Graphite container = 5.3 g
Graphite tube is placed inside a target boat.
Boat previously coated with TaC and sintered.
Ta-target boat is wrapped with 3 new Ta foils for heat shielding and the boat was installed in Evap1.
Chamber currently pumping down.
Friday, February 09, 2018, 10:40
Initial IGP1 = 4.54e-7 Torr
Tapped up entire process manually to 520A in 25 min
TGHT = 520 A, 5.49 V
Vacuum coming down indicating carbonization process complete.
Current suddenly tripped off from 520 A to 0 A.
There was not a power outage.
There was good vacuum.
Water cooling did not trip off
|
Friday, February 09, 2018, 16:49
The power supply was tested and its working normally.
Apparently a glitch on EPICS caused the tripped off.
|
|
192
|
Friday, February 09, 2018, 17:04 |
Marla Cervantes | UO2/C | 40282-2 | TARGET BOAT | Done | Carbonizing UO2/C discs for 1stepUCx in graphite sample container _#10 |
Marla Cervantes wrote: |
Marla Cervantes wrote: |
Thursday, February 08, 2018, 14:50
35 circles from cast#2 of 14 mm diameter were packed into a graphite sample container.
35 x UO2/C circles = 4.76 g
Graphite container = 5.3 g
Graphite tube is placed inside a target boat.
Boat previously coated with TaC and sintered.
Ta-target boat is wrapped with 3 new Ta foils for heat shielding and the boat was installed in Evap1.
Chamber currently pumping down.
Friday, February 09, 2018, 10:40
Initial IGP1 = 4.54e-7 Torr
Tapped up entire process manually to 520A in 25 min
TGHT = 520 A, 5.49 V
Vacuum coming down indicating carbonization process complete.
Current suddenly tripped off from 520 A to 0 A.
There was not a power outage.
There was good vacuum.
Water cooling did not trip off
|
Friday, February 09, 2018, 16:49
The power supply was tested and its working normally.
Apparently a glitch on EPICS caused the tripped off.
|
Friday, February 09, 2018, 17:00
Target remained in EVAP1 for 2 hours at 0 A to ensure cooling.
EVAP1 was vented with Ar and the target was removed from EVAP1.
Graphite container seems unbroken.
Ta boat looks unbroken. |
Attachment 1: 20180209_153539.jpg
|
|
Attachment 2: 20180209_153728.jpg
|
|
Attachment 3: 20180209_153817.jpg
|
|
Attachment 4: Carbonization-current_trippoff.JPG
|
|
Attachment 5: Carbonization-Batch10-090218.docx
|
|
197
|
Monday, March 12, 2018, 11:14 |
Marla Cervantes | UO2/C | 40282-2 | TARGET BOAT | Done | Carbonizing UO2/C discs for 1stepUCx in graphite sample container _#12 | Monday, March 12, 2018, 9:13
35 circles from cast#2 of 14 mm diameter were packed into a graphite sample container.
35 x UO2/C circles = 5.21 g
Graphite container = 6.85 g
Graphite tube is placed inside a target boat.
Boat previously coated with TaC and sintered.
Ta-target boat is wrapped with 3 Ta foils for heat shielding and the boat was installed in Evap1.
Chamber currently pumping down.
Monday, March 12, 2018, 13:57
Initial IGP1 = 4.79e-7 Torr
Tapped up entire process manually to 520A in 30 min
TGHT = 520 A, 5.32 V
Vacuum coming down indicating carbonization process complete.
Will remain at max setpoint for 1 hrs to ensure full carbonization before cooling down.
Monday, March 12, 2018, 14:57
Cooling down rate used 3 A/10s.
Tuesday, March 13, 2018, 18:22
Vented with Ar and removed from EVAP1 |
|
96
|
Friday, July 04, 2014, 10:23 |
John Wong | ThO2 | 40282-2 | TARGET BOAT | Done | Test: Sintering ThO2 with Nb backing foils | Friday, July 04, 2014, 10:13
Target boat contains 4 set of samples. Each sample consists of 5pack ThO2/Nb. (see photos).
The container is wrapped with 3 layers of heat shield.
TGHT will be ramped up to 520A at 0.1A/min.
Chamber has been pumped over night, pressure at 4.20e-6 Torr.
The purpose of this test:
1. Will the Ta- target boat survive at that current?
2. How will ThO2 sintered? Shrinkage? Grain-growth? mass loss? density? SEM will be done later.
3. How will the pressure behave at the max operating temperature (or current)?
Friday, July 04, 2014, 12:29
Stepped up TGHT to 40A, Vac went to max at 3.5e-5 Torr and is coming down.
Auto-ramping initiated.
Tuesday, August 19, 2014, 10:20
Sample was successfully sinterred to 520A.
SEM on raw, treated powder, and sintered samples were perform. Pressure vs current plot can also be found. (see attachments)
More information can be found here:
https://www.dropbox.com/sh/fj78m7tyy7mj99p/AABfm-fQMeoaWhf6HjT8Vzn1a
|
Attachment 1: 2014-07-03_12.29.29.jpg
|
|
Attachment 2: ThO_raw_green_sintered_30um.png
|
|
Attachment 3: pressure_current_plot.PNG
|
|
|
97
|
Wednesday, July 09, 2014, 13:57 |
Laura Lambert | ThO2 | 40282-2 | TARGET BOAT | Done | Test: Sintering ThO2 with Nb backing foils |
John Wong wrote: |
Friday, July 04, 2014, 10:13
Target boat contains 4 set of samples. Each sample consists of 5pack ThO2/Nb. (see photos).
The container is wrapped with 3 layers of heat shield.
TGHT will be ramped up to 520A at 0.1A/min.
Chamber has been pumped over night, pressure at 4.20e-6 Torr.
The purpose of this test:
1. Will the Ta- target boat survive at that current?
2. How will ThO2 sintered? Shrinkage? Grain-growth? mass loss? density? SEM will be done later.
3. How will the pressure behave at the max operating temperature (or current)?
Friday, July 04, 2014, 12:29
Stepped up TGHT to 40A, Vac went to max at 3.5e-5 Torr and is coming down.
Auto-ramping initiated.
|
Wednesday, July 09, 2014, 13:55
TGHT reached 520A tuesday morning. [see attached archive screenshot]
Initiated auto-cool at 1.0A/min tuesday afternoon.
Vented in air and took samples out of EVAP1 wednesday morning. [see attached sample photo]
|
Attachment 1: test_batch_full_sintering.JPG
|
|
Attachment 2: jul9_2014_(2).jpg
|
|
|
164
|
Wednesday, August 23, 2017, 15:54 |
Laura Lambert | UO2/C | 40282-2 | TARGET BOAT | Done | Carbonizing UC2 discs for 1stepUCx in graphite sample container _#1 | Wednesday, August 23, 2017, 15:41
2 rounds of UO2/C were cast onto a graphite sheet in the fume hood and let dry.
For this round of samples, circles from cast 1 were used
Graphite powder used = 5.16g
A 14mm punch was used to punch out circles from a 16mm wide strip.
35 circles were packed into a graphite sample container.
graphite container [no endcap] = 3.37g
35 x UO2/C circles = 4.76g
graphite container+smpls = 8.13g
container+smpls+endcap = 10.08g
Graphite tube is placed inside a target boat.
Boat previously coated with TaC and sintered - 1st use of newly sintered boat.
Ta-target boat is wrapped with 3-layers of heat shield and installed in Evap1.
Chamber currently pumping down.
Friday, August 25, 2017, 09:59
IG1 = 3.45e-6 Torr.
Stepped up manually to 80A.
Vacuum stable.
IG1 = 3.0e-5 Torr.
Initiating auto-ramp.
Target boat will be ramped up to 520A at the rate of 0.1A/min.
Vacuum limit stop at 1.0e-4 Torr, backing off at 5.0e-4 Torr.
Monday, August 28, 2017, 08:09
IG1 = 6.3e-6 Torr
TGHT = 455A, 4.65V
Vacuum stable.
Increasing ramping rate to 0.2A/min.
Monday, August 28, 2017, 08:53
IG1 = 7.3e-6 Torr
TGHT = 465A, 4.75V
Vacuum stable.
Increasing ramping rate to 0.5A/min.
Monday, August 28, 2017, 13:17
IG1 = 1.32e-5 Torr
TGHT = 520A, 5.44V
Vacuum still fairly high and not dropping very fast indicating carbonization incomplete.
Increasing max setpoint to 530A and restarting auto-ramp.
Monday, August 28, 2017, 15:13
IG1 = 1.32e-5 Torr
TGHT = 530A, 5.58V
Vacuum still high, wavering up and down/ not dropping - carbonization remains incomplete.
Increasing max setpoint to 540A and restarting auto-ramp.
Tuesday, August 29, 2017, 09:28
IG1 = 3.72e-6 Torr
TGHT = 540A, 5.66V
Carbonization complete.
Initiating auto-cool at 2.0A/min
|
Attachment 1: IMG_1768.JPG
|
|
Attachment 2: IMG_1774.JPG
|
|
|
173
|
Tuesday, November 14, 2017, 16:16 |
Laura Lambert | UO2/C | 40282-2 | TARGET BOAT | Done | Carbonizing UC2 discs for 1stepUCx in graphite sample container _#2 | Tuesday, November 14, 2017, 16:12
Circles from cast 1 were used, the same as the last round of 1stepUCx [see elog i.d. 164]
A 14mm punch was used to punch out circles from the cast.
35 circles were packed into a graphite sample container.
35 x UO2/C circles = 5.43g
Graphite tube is placed inside a target boat.
Boat previously coated with TaC and sintered.
Ta-target boat is wrapped with 3-layers of heat shield and installed in Evap1.
Chamber currently pumping down.
Wednesday, November 15, 2017, 08:53
IGP1 = 1.6e-6 Torr
Tapping up manually...
Wednesday, November 15, 2017, 11:59
IGP1 = 5.0e-5 Torr
Tapped up entire process manually to 520A in 3hrs!!!
TGHT = 520A, 4.98V
Vacuum coming down nicely indicating carbonization process complete
Will remain at max setpoint for 4hrs to ensure full carbonization before cooling down later this afternoon.
Wednesday, November 15, 2017, 15:16
IG1 = 8.65e-6 Torr
TGHT = 520A, 4.92V
Carbonization complete.
Initiating auto-cool at 2.0A/min
Monday, November 20, 2017, 13:28
Evap1 was vented in argon and sample removed/ transfered to glove box on friday.
Discs look good, slightly lighter grayer compared to production UCx discs after second cast but before final carbonization.
Material seems to adhere to graphite backing foil well, no flakes coming off from just moving discs around.
Weight of 35 carbonized discs = 4.387g
Weight loss = 5.43g - 4.387g = 1.043g
|
Attachment 1: striptool.JPG
|
|
|
199
|
Wednesday, March 28, 2018, 11:46 |
Laura Lambert | UO2/C | 40282-2 | TARGET BOAT | In progress | Carbonizing first full length 1step UCx target | Wednesday, March 28, 2018, 11:35
D-shaped discs were cut from cast 2, the same as the last sample of 1stepUCx [see elog i.d. 197]
A 13mm punch was used to punch out discs from pre-cut strips using the old method.
The target consists of 195 discs with 8.1cm in length - all single discs, no packs.
195 x UO2/C discs = 19.79g
Graphite insert is placed inside a target boat with both endcaps on.
Boat previously coated with TaC and sintered.
Ta-target boat is wrapped with 3-layers of heat shield and installed in evap1 yesterday afternoon.
Chamber pumped down overnight.
Wednesday, March 28, 2018, 13:33
IGP1 = 4.03e-7 Torr
Tapped up TGHT manually to 80A, 0.83V - waited 50min, vacuum started to drop/stabilize.
Continued to tap up manually to 430A, 4.22V
Started out slow with a rate of ~10A/5min, and slowly increased to a rate of ~10A/min as vacuum stabilized, slowing down again when reaching carbonization outgassing.
Auto ramp at 0.2A/min from 430A-520A.
Thursday, March 29, 2018, 10:04
Reached 520A around 2am.
TGHT = 520A, 5.13V
IGP1 = 1.74e-6 Torr
Initiated auto-cool this morning at a rate of 1.0A/min.
|
|
200
|
Monday, April 09, 2018, 16:51 |
Laura Lambert | UO2/C | 40282-2 | TARGET BOAT | Problems | Carbonizing first full length 1step UCx target |
Laura Lambert wrote: |
Wednesday, March 28, 2018, 11:35
D-shaped discs were cut from cast 2, the same as the last sample of 1stepUCx [see elog i.d. 197]
A 13mm punch was used to punch out discs from pre-cut strips using the old method.
The target consists of 195 discs with 8.1cm in length - all single discs, no packs.
195 x UO2/C discs = 19.79g
Graphite insert is placed inside a target boat with both endcaps on.
Boat previously coated with TaC and sintered.
Ta-target boat is wrapped with 3-layers of heat shield and installed in evap1 yesterday afternoon.
Chamber pumped down overnight.
Wednesday, March 28, 2018, 13:33
IGP1 = 4.03e-7 Torr
Tapped up TGHT manually to 80A, 0.83V - waited 50min, vacuum started to drop/stabilize.
Continued to tap up manually to 430A, 4.22V
Started out slow with a rate of ~10A/5min, and slowly increased to a rate of ~10A/min as vacuum stabilized, slowing down again when reaching carbonization outgassing.
Auto ramp at 0.2A/min from 430A-520A.
Thursday, March 29, 2018, 10:04
Reached 520A around 2am.
TGHT = 520A, 5.13V
IGP1 = 1.74e-6 Torr
Initiated auto-cool this morning at a rate of 1.0A/min.
|
Monday, April 09, 2018, 16:00
ISAC controls performed a PLC switch over compromising the nuclear ventilation controls WITHOUT NOTIFYING ME
This is the 2nd time in a month this has happened without being notified.
Evap1 has therefore tripped.
During this switch there was a problem which caused the turn over to take even longer.
Sat here tapping reset until nuclear ventilation was 'back on'.
Vacuum proceeded to drop once the tests were complete, then started to spike again, nuc vent remained not ok after tests were done nuc vent ok.
|
Attachment 1: evap1_trip.JPG
|
|
Attachment 2: evap1_trip_archive.JPG
|
|
|
201
|
Monday, April 09, 2018, 16:53 |
Laura Lambert | UO2/C | 40282-2 | TARGET BOAT | Problems resolved | Carbonizing first full length 1step UCx target |
Laura Lambert wrote: |
Laura Lambert wrote: |
Wednesday, March 28, 2018, 11:35
D-shaped discs were cut from cast 2, the same as the last sample of 1stepUCx [see elog i.d. 197]
A 13mm punch was used to punch out discs from pre-cut strips using the old method.
The target consists of 195 discs with 8.1cm in length - all single discs, no packs.
195 x UO2/C discs = 19.79g
Graphite insert is placed inside a target boat with both endcaps on.
Boat previously coated with TaC and sintered.
Ta-target boat is wrapped with 3-layers of heat shield and installed in evap1 yesterday afternoon.
Chamber pumped down overnight.
Wednesday, March 28, 2018, 13:33
IGP1 = 4.03e-7 Torr
Tapped up TGHT manually to 80A, 0.83V - waited 50min, vacuum started to drop/stabilize.
Continued to tap up manually to 430A, 4.22V
Started out slow with a rate of ~10A/5min, and slowly increased to a rate of ~10A/min as vacuum stabilized, slowing down again when reaching carbonization outgassing.
Auto ramp at 0.2A/min from 430A-520A.
Thursday, March 29, 2018, 10:04
Reached 520A around 2am.
TGHT = 520A, 5.13V
IGP1 = 1.74e-6 Torr
Initiated auto-cool this morning at a rate of 1.0A/min.
|
Monday, April 09, 2018, 16:00
ISAC controls performed a PLC switch over compromising the nuclear ventilation controls WITHOUT NOTIFYING ME
This is the 2nd time in a month this has happened without being notified.
Evap1 has therefore tripped.
During this switch there was a problem which caused the turn over to take even longer.
Sat here tapping reset until nuclear ventilation was 'back on'.
Vacuum proceeded to drop once the tests were complete, then started to spike again, nuc vent remained not ok after tests were done nuc vent ok.
|
Monday, April 09, 2018, 16:52
Turns out I wasn't on a list of ppl who need to know about this test when I should be
They also didn't reset the alarms locally outside the hot lab so nuc vent remained not ok until this was reset.
IGP1 reached 0.027 Torr before nuc vent was ok and pumps were able to be turned back on
Pumps back on IGP1 = 1.86e-5 Torr and still pumping down
|
|
202
|
Tuesday, April 10, 2018, 14:49 |
Laura Lambert | UO2/C | 40282-2 | TARGET BOAT | Done | Carbonizing first full length 1step UCx target |
Laura Lambert wrote: |
Laura Lambert wrote: |
Laura Lambert wrote: |
Wednesday, March 28, 2018, 11:35
D-shaped discs were cut from cast 2, the same as the last sample of 1stepUCx [see elog i.d. 197]
A 13mm punch was used to punch out discs from pre-cut strips using the old method.
The target consists of 195 discs with 8.1cm in length - all single discs, no packs.
195 x UO2/C discs = 19.79g
Graphite insert is placed inside a target boat with both endcaps on.
Boat previously coated with TaC and sintered.
Ta-target boat is wrapped with 3-layers of heat shield and installed in evap1 yesterday afternoon.
Chamber pumped down overnight.
Wednesday, March 28, 2018, 13:33
IGP1 = 4.03e-7 Torr
Tapped up TGHT manually to 80A, 0.83V - waited 50min, vacuum started to drop/stabilize.
Continued to tap up manually to 430A, 4.22V
Started out slow with a rate of ~10A/5min, and slowly increased to a rate of ~10A/min as vacuum stabilized, slowing down again when reaching carbonization outgassing.
Auto ramp at 0.2A/min from 430A-520A.
Thursday, March 29, 2018, 10:04
Reached 520A around 2am.
TGHT = 520A, 5.13V
IGP1 = 1.74e-6 Torr
Initiated auto-cool this morning at a rate of 1.0A/min.
|
Monday, April 09, 2018, 16:00
ISAC controls performed a PLC switch over compromising the nuclear ventilation controls WITHOUT NOTIFYING ME
This is the 2nd time in a month this has happened without being notified.
Evap1 has therefore tripped.
During this switch there was a problem which caused the turn over to take even longer.
Sat here tapping reset until nuclear ventilation was 'back on'.
Vacuum proceeded to drop once the tests were complete, then started to spike again, nuc vent remained not ok after tests were done nuc vent ok.
|
Monday, April 09, 2018, 16:52
Turns out I wasn't on a list of ppl who need to know about this test when I should be
They also didn't reset the alarms locally outside the hot lab so nuc vent remained not ok until this was reset.
IGP1 reached 0.027 Torr before nuc vent was ok and pumps were able to be turned back on
Pumps back on IGP1 = 1.86e-5 Torr and still pumping down
|
Tuesday, April 10, 2018, 14:46
Glove box fixed!
Vented in Argon and transferred to glove box.
Graphite insert has moved to within 1mm of the end of the left side of the boat.
This could have happened during removal from evap1, hard to tell.
Either way, clearly a looser fit of the graphite insert in the boat indicating possible shrinkage of graphite insert.
|
|
203
|
Tuesday, April 17, 2018, 12:45 |
Laura Lambert | UO2/C | 40282-2 | TARGET BOAT | Done | Processing UC2Flk_20 | Tuesday, April 17, 2018, 10:30
UO2/C green was prepared April 12th, 2018
The cast peeled off the glass nicely April 13th, 2018
Initial UO2 powder used = 50.56g (Inventory R-01032A, UO2 + bottle = 626.28g before use)
Graphite powder used = 10.38g
Green cast dried UO2/C + organic mass = 61.40g
The green was rolled up and wrapped in a piece of graphite sheet.
The Ta-target boat was wrapped with 3-layers of heat shield [1 reused, 2 new] and installed in evap1 yesterday.
Chamber pumped down overnight.
IGP1 = 8.4e-7 Torr
Tapped up to 35A, 0.46V
Waited ~135min, vacuum stable.
IGP1 = 1.6e-5 Torr
Initiating auto-ramp at 0.2A/min
Target boat will be ramped up to 520A.
Vacuum limit stop at 3.0e-4 Torr, backing off at 6.0e-4 Torr.
Wednesday, April 18, 2018, 09:21
IGP1 = 9.6e-6 Torr
TGHT = 245A, 2.10V
Vacuum stable, increasing ramping rate to 0.5A/min.
Thursday, April 19, 2018, 08:35
IGP1 = 3.21e-6 Torr
Materials have finished carbonizing.
TGHT = 520A, 4.97V
Evap1 has remained at max setpoints for ~6.5hrs
Initiating auto-cool at 1.0A/min
Thursday, May 10, 2018, 10:33
Materials were vented in Ar and transferred to glove box on April 20th
|
|
85
|
Thursday, January 23, 2014, 16:29 |
Laura Lambert | Empty | 40282-1 | TARGET BOAT | In progress | Sintering Ta target boat with TaC coating | Thursday, January 23, 2014, 16:26
A new target boat was sprayed with TaC coating and let dry, the coating appeared slightly bubbly once dried [see attached photos].
The target boat was wrapped with 3-layers of Ta-heat shield.
The boat was installed in Evap#1, chamber is currently being pumped down overnight.
|
Attachment 1: IMG_20140123_143448877.jpg
|
|
Attachment 2: IMG_20140123_143507747.jpg
|
|
|
86
|
Friday, January 24, 2014, 14:45 |
Laura Lambert | Empty | 40282-1 | TARGET BOAT | In progress | Sintering Ta target boat with TaC coating |
Laura Lambert wrote: |
Thursday, January 23, 2014, 16:26
A new target boat was sprayed with TaC coating and let dry, the coating appeared slightly bubbly once dried [see attached photos].
The target boat was wrapped with 3-layers of Ta-heat shield.
The boat was installed in Evap#1, chamber is currently being pumped down overnight.
|
Friday, January 24, 2014, 14:42
Chamber was pumped down to 5.9e-6 Torr overnight.
TGHT was stepped up to 35A.
Waited 20min, vacuum consistently stable, auto-ramp initiated at 0.2A/min and max setpoint to 580A.
Good vacuum: 5e-5 Torr. Bad vacuum: 6e-5 Torr.
|
|
87
|
Monday, January 27, 2014, 11:03 |
Laura Lambert | Empty | 40282-1 | TARGET BOAT | Done | Sintering Ta target boat with TaC coating |
Laura Lambert wrote: |
Laura Lambert wrote: |
Thursday, January 23, 2014, 16:26
A new target boat was sprayed with TaC coating and let dry, the coating appeared slightly bubbly once dried [see attached photos].
The target boat was wrapped with 3-layers of Ta-heat shield.
The boat was installed in Evap#1, chamber is currently being pumped down overnight.
|
Friday, January 24, 2014, 14:42
Chamber was pumped down to 5.9e-6 Torr overnight.
TGHT was stepped up to 35A.
Waited 20min, vacuum consistently stable, auto-ramp initiated at 0.2A/min and max setpoint to 580A.
Good vacuum: 5e-5 Torr. Bad vacuum: 6e-5 Torr.
|
Monday, January 27, 2014, 11:01
TGHT reached 580A over the weekend.
TGHT auto-cooldown initiated at 2.0A/min.
Tuesday, January 28, 2014, 15:51
Chamber cooled down overnight, vented and opened up this morning.
Target boat looks good! [See attached photos]
|
Attachment 1: IMG_20140128_113257662.jpg
|
|
|
88
|
Wednesday, February 05, 2014, 14:29 |
Laura Lambert | UO2/C | 40282-1 | TARGET BOAT | Done | Processing UC2Flk_01 | Wednesday, February 05, 2014, 14:13
1st attempt:
UO2/C green was prepared on Feb 4, 2014 [tues]. The slurry was cast on a piece of glass coated with WD40.
The cast was let dry until Feb 5, 2014 [wed] - the cast was cracked and too much WD40 was used because there were oil patches [see attached photo: cast1]; however, the cast peeled off the glass very nicely.
2nd attempt:
Due to cracked and oil patches, decided to re-mill and try again.
Scrapped off cast, added the additional compositions:
1g PEG400, 1g Glycerol, 14g 5% PVA, 2mL n-butanol, 2mL methanol, 20mL DI H2O
Re-milled for 3 hours and cast onto glass coated with slightly less WD40.
Before even allowing cast to dry, can see the slurry is far too thick. The slurry would not spread at all.
Will let dry overnight and attempt to scrape off and re-mill with more DI H2O tomorrow.
Thursday, February 06, 2014, 10:57
Second cast was a lot thicker, but peeled off the glass nicely, will not re-cast. [see attached photo: cast2]
Some material was stuck to the WC jar wall and the balls, same as previously.
Initial UO2 powder used = 50.24g (Inventory R-00855A UO2 + bottle = 695.52g before use)
Graphite powder used = 10.05g
1st attempt = did not measure
2nd attempt dried UO2/C + organic mass = 46.56g (expecting to lose more uranium from re-casting a second time/ sticking to jar + balls)
The green was rolled up and wrapped in a piece of graphite sheet. [see attached photo: target boat]
The Ta-target boat was wrapped with 3-layers of heat shield and installed in EVAP1.
Chamber us currently being pumped down.
Target will be ramped up to 520A at the rate of 0.1A/min.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
Friday, February 07, 2014, 10:15
Chamber has pumped down overnight. IG1 currently @ 2.4e-6 Torr.
Stepped up TGHT to 35A/0.187V.
Friday, February 07, 2014, 12:02
TGHT sat at 35A for 2hrs. Pressure took a while to fully stabilize, currently sitting at 1.9e-5 Torr [see attached photo: pre auto-ramp]
Initiating auto-ramping.
Monday, February 24, 2014, 13:37
TGHT reached max setpoint of 520A on friday night.
Power = 5.45V
IGP1 = 3.2e-6 Torr.
Carbonization process is complete.
Initiating auto-cooling at 2.0A/min.
Thursday, October 09, 2014, 13:41
update rename: batch #09 - 02062014 to UC2Flk_01
|
Attachment 1: UO2_cast1.jpg
|
|
Attachment 2: UO2_cast2.jpg
|
|
Attachment 3: UO2_target_boat.jpg
|
|
Attachment 4: pre_auto-ramp.JPG
|
|
|
99
|
Tuesday, August 26, 2014, 15:27 |
Laura Lambert | UO2/C | 40282-1 | TARGET BOAT | Done | Processing UC2Flk_03 | Tuesday, August 26, 2014, 11:54
UO2/C green was prepared Aug 20, 2014. The slurry was cast on a piece of glass coated with WD40 on Aug 21, 2014.
The cast peeled off the glass nicely Aug 22, 2014 and let dry until Aug 25, 2014.
Some materials were stuck on the WC jar wall and balls as always noted.
Initial UO2 powder used = 50.75g (Inventory R-00835A UO2 + bottle = 595.37g before use)
Graphite powder used = 10.78g
Green cast dried UO2/C + organic mass = 62.86g
The green was rolled up and wrapped in a piece of graphite sheet.
The Ta-target boat is wrapped with 3-Ta layers of heat shield and installed in Evap1.
Chamber is currently being pumped down.
Target will be ramped up to 520A at the rate of 0.1A/min
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr
Wednesday, August 27, 2014, 11:18
Chamber has pumped down overnight. IG1 = 6.4e-6 Torr
Stepped TGHT up to 35A.
Wednesday, August 27, 2014, 14:41
Waited 1.5hrs for vacuum to fully stabilize, currently sitting at 2.2e-5 Torr.
Initiating auto-ramp.
Friday, September 12, 2014, 14:09
TGHT reached max 520A/5.6V last night.
Carbonization process complete (see attachment: carbonization)
IG1 = 7.6e-6 Torr
Initiating auto-cool at 2A/min
Will vent the chamber with Ar on Monday.
Monday, September 22, 2014, 14:52
complete, UO2/C in glove box
Thursday, October 09, 2014, 13:45
update rename: batch #11 - 08262014 to UC2Flk_03 |
Attachment 1: carbonization.JPG
|
|
|
100
|
Tuesday, September 23, 2014, 15:00 |
Laura Lambert | UO2/C | 40282-1 | TARGET BOAT | In progress | Processing UC2Flk_04 | Tuesday, September 23, 2014, 14:54
UO2/C green was prepared Sept 18, 2014. The slurry was cast on a piece of glass coated with WD40 on Sept 19, 2014.
The cast was let dry over the weekend and peeled off the glass nicely Sept 22, 2014.
Some materials were stuck on the WC jar wall and balls as always noted.
Initial UO2 powder used = 50.04g (Inventory R-00835A UO2 + bottle = 544.51g before use)
Graphite powder used = 9.98g
Green cast dried UO2/C + organic mass = 59.35g
The green was rolled up and wrapped in a piece of graphite sheet.
The Ta-target boat is wrapped with 3-layers of heat shield and installed in Evap1.
Chamber is currently being pumped down.
Target will be ramped up to 520A at the rate of 0.1A/min
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
Wednesday, September 24, 2014, 11:27
Chamber pumped down overnight.
IGP1 = 2.3e-6 Torr
Manually stepping TGHT up to 30A
Wednesday, September 24, 2014, 14:00
Vacuum stable.
IGP1 = 1.3e-5 Torr.
Initiating auto-ramp.
|
|
101
|
Friday, October 10, 2014, 14:00 |
John Wong | UO2/C | 40282-1 | TARGET BOAT | Done | Processing UC2Flk_04 |
Laura Lambert wrote: |
Tuesday, September 23, 2014, 14:54
UO2/C green was prepared Sept 18, 2014. The slurry was cast on a piece of glass coated with WD40 on Sept 19, 2014.
The cast was let dry over the weekend and peeled off the glass nicely Sept 22, 2014.
Some materials were stuck on the WC jar wall and balls as always noted.
Initial UO2 powder used = 50.04g (Inventory R-00835A UO2 + bottle = 544.51g before use)
Graphite powder used = 9.98g
Green cast dried UO2/C + organic mass = 59.35g
The green was rolled up and wrapped in a piece of graphite sheet.
The Ta-target boat is wrapped with 3-layers of heat shield and installed in Evap1.
Chamber is currently being pumped down.
Target will be ramped up to 520A at the rate of 0.1A/min
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
Wednesday, September 24, 2014, 11:27
Chamber pumped down overnight.
IGP1 = 2.3e-6 Torr
Manually stepping TGHT up to 30A
Wednesday, September 24, 2014, 14:00
Vacuum stable.
IGP1 = 1.3e-5 Torr.
Initiating auto-ramp.
|
Friday, October 10, 2014, 13:51
TGHT has reached to 520A for over 20hrs; Carbonization process is complete (see attachment).
Ramping down at 2A/min.
As much as I like to come to work, Monday is a holiday. So, the chamber will be kept under vacuum.
On Tuesday, the chamber will be vent in Ar.
Friday, October 17, 2014, 11:47
Vented and taken out on tuesday.
|
Attachment 1: archiver_TGHT&VAC.PNG
|
|
|