|
ID |
Date |
Author |
Target Material |
Target Oven W.O# |
Source |
Status |
Subject |
Text |
|
|
276
|
Friday, September 24, 2021, 15:40 |
Luca Egoriti | Ta | | LP-SIS | In progress | Full target release test 1 | Friday, September 24, 2021, 15:38
Full target loaded with ~500 non-active
foils plus 4 active foils. |
|
|
277
|
Friday, November 05, 2021, 13:38 |
Luca Egoriti | Ta | | LP-SIS | In progress | Full target release test 2 | Friday, November 05, 2021, 13:23
Full target loaded with ~500 |
|
|
278
|
Wednesday, November 24, 2021, 10:38 |
Luca Egoriti | Ta | | | In progress | IPF release tests | Wednesday, November 24, 2021, 10:38
A first, short "FullTa1"
target was loaded into the evap1. It consists |
|
|
279
|
Wednesday, April 13, 2022, 10:55 |
Luca Egoriti | UC2 | | P2N-SIS | Done | P2N carbothermal reduction P2Ncartridge-220323 | Wednesday, April 13, 2022, 10:50
P2NC-220323
Preparing the P2N-UCx for online |
|
|
280
|
Wednesday, May 04, 2022, 09:47 |
Luca Egoriti | UC2 | | P2N-SIS | Done | P2N carbothermal reduction P2NC220408 | Wednesday, May 04, 2022, 09:42
Yesterday, a second graphite cartridge
was installed in EVAP1, it consists of the |
|
|
66
|
Wednesday, June 05, 2013, 16:52 |
Laura Lambert | UC2 | 39165-6 | LP-SIS | Done | Conditioning UCx#06 |
|
|
|
68
|
Tuesday, June 25, 2013, 14:49 |
Laura Lambert | UO2/C | Target boat #2 | | Done | Processing UC2 flakes (batch#05 - 18062013) | Tuesday, June 25, 2013, 14:35
UO2/C green was prepared on June
18, 2013 and let dry over the weekend. |
|
|
73
|
Friday, August 02, 2013, 11:06 |
Laura Lambert | UC2 | 38634-7 | LP-SIS | In progress | Conditioning UCx # 07 | Thursday, August 01, 2013, 16:16
The target container was previously
coated with TaC and sintered in Evap 2. |
|
|
77
|
Tuesday, September 10, 2013, 12:20 |
Laura Lambert | UO2/C | Target Boat #2 | | Done | Processing UC2 flaskes (batch#06 - 08222013 |
|
|
|
78
|
Thursday, September 19, 2013, 15:41 |
Laura Lambert | UO2/C | Target Boat #2 | | In progress | Processing UC2 flakes (batch #07 - 09192013) | Thursday, September 19, 2013, 15:35
UO2/C green was prepared on Aug 17,
2013. The slurry was cast on a piece of glass |
|
|
85
|
Thursday, January 23, 2014, 16:29 |
Laura Lambert | Empty | 40282-1 | TARGET BOAT | In progress | Sintering Ta target boat with TaC coating | Thursday, January 23, 2014, 16:26
A new target boat was sprayed
with TaC coating and let dry, the coating |
|
|
86
|
Friday, January 24, 2014, 14:45 |
Laura Lambert | Empty | 40282-1 | TARGET BOAT | In progress | Sintering Ta target boat with TaC coating |
|
|
|
87
|
Monday, January 27, 2014, 11:03 |
Laura Lambert | Empty | 40282-1 | TARGET BOAT | Done | Sintering Ta target boat with TaC coating |
|
|
|
88
|
Wednesday, February 05, 2014, 14:29 |
Laura Lambert | UO2/C | 40282-1 | TARGET BOAT | Done | Processing UC2Flk_01 | Wednesday, February 05, 2014, 14:13
1st attempt:
UO2/C green was prepared on Feb 4, |
|
|
90
|
Wednesday, March 05, 2014, 10:30 |
Laura Lambert | | | TARGET BOAT | In progress | Re-sinterring end caps |
|
|
|
97
|
Wednesday, July 09, 2014, 13:57 |
Laura Lambert | ThO2 | 40282-2 | TARGET BOAT | Done | Test: Sintering ThO2 with Nb backing foils |
|
|
|
99
|
Tuesday, August 26, 2014, 15:27 |
Laura Lambert | UO2/C | 40282-1 | TARGET BOAT | Done | Processing UC2Flk_03 | Tuesday, August 26, 2014, 11:54
UO2/C green was prepared Aug 20,
2014. The slurry was cast on a piece of glass |
|
|
100
|
Tuesday, September 23, 2014, 15:00 |
Laura Lambert | UO2/C | 40282-1 | TARGET BOAT | In progress | Processing UC2Flk_04 | Tuesday, September 23, 2014, 14:54
UO2/C green was prepared Sept 18,
2014. The slurry was cast on a piece of glass |
|
|
102
|
Friday, October 17, 2014, 11:55 |
Laura Lambert | UC2 | 40282-5 | LP-SIS | In progress | Conditioning UCx #11 | Friday, October 17, 2014, 11:47
Target container was previously coated
with TaC spray and sintered. |
|
|
104
|
Monday, November 10, 2014, 13:50 |
Laura Lambert | UC2 | 40282-5 | LP-SIS | Done | Conditioning UCx #11 |
|
|
|