Entry  Friday, September 24, 2021, 15:40, Luca Egoriti, Ta, , LP-SIS, In progress, Full target release test 1 
 Friday, September 24, 2021, 15:38
Full target loaded with ~500 non-active foils plus 4 active foils.  
Initial pressure when heating: 6.6E-5 T 
Entry  Friday, November 05, 2021, 13:38, Luca Egoriti, Ta, , LP-SIS, In progress, Full target release test 2 Ta-ReleaseTest-2_low-current.JPG
 Friday, November 05, 2021, 13:23
Full target loaded with ~500 non-active foils plus 4 active foils.  
Initial pressure when heating: 1.6E-5 T 
Entry  Wednesday, November 24, 2021, 10:38, Luca Egoriti, Ta, , , In progress, IPF release tests 
Wednesday, November 24, 2021, 10:38
A first, short "FullTa1" target was loaded into the evap1. It consists of a short container (10 cm) with lateral thickness of ~0.2mm.
The ends of the target connect with the TGHT terminals through two copper adapters.
Entry  Wednesday, April 13, 2022, 10:55, Luca Egoriti, UC2, , P2N-SIS, Done, P2N carbothermal reduction P2Ncartridge-220323 
Wednesday, April 13, 2022, 10:50
P2NC-220323
Preparing the P2N-UCx for online operation on June 2022
Entry  Wednesday, May 04, 2022, 09:47, Luca Egoriti, UC2, , P2N-SIS, Done, P2N carbothermal reduction P2NC220408 
 Wednesday, May 04, 2022, 09:42
Yesterday, a second graphite cartridge was installed in EVAP1, it consists of the old, 3-body cartridge design, and was sanded on the outside to
be able to fit a P2N container. 
    Reply  Wednesday, June 05, 2013, 16:52, Laura Lambert, UC2, 39165-6, LP-SIS, Done, Conditioning UCx#06 UCx#6_conditioningstage1.PNG


    
        
            John Wong wrote:
        
        
            
            Thursday, May 30, 2013, 16:16
Entry  Tuesday, June 25, 2013, 14:49, Laura Lambert, UO2/C, Target boat #2, , Done, Processing UC2 flakes (batch#05 - 18062013) 
 Tuesday, June 25, 2013, 14:35
UO2/C green was prepared on June 18, 2013 and let dry over the weekend.
UO2 powder used = 50.25g (Inventory R-00835A UO2 + bottle = 845.94g - before use)
Entry  Friday, August 02, 2013, 11:06, Laura Lambert, UC2, 38634-7, LP-SIS, In progress, Conditioning UCx # 07 
Thursday, August 01, 2013, 16:16
The target container was previously coated with TaC and sintered in Evap 2.
The target is loaded with 210 discs of UCx (material from batch # 04 - 05032013)
    Reply  Tuesday, September 10, 2013, 12:20, Laura Lambert, UO2/C, Target Boat #2, , Done, Processing UC2 flaskes (batch#06 - 08222013 


    
        
            John Wong wrote:
        
        
            
            
            
Entry  Thursday, September 19, 2013, 15:41, Laura Lambert, UO2/C, Target Boat #2, , In progress, Processing UC2 flakes (batch #07 - 09192013) 
Thursday, September 19, 2013, 15:35
UO2/C green was prepared on Aug 17, 2013. The slurry was cast on a piece of glass coated with WD40.
The cast was let dry until Aug 19, 2013.
Entry  Thursday, January 23, 2014, 16:29, Laura Lambert, Empty, 40282-1, TARGET BOAT, In progress, Sintering Ta target boat with TaC coating IMG_20140123_143448877.jpgIMG_20140123_143507747.jpg
Thursday, January 23, 2014, 16:26 
 A new target boat was sprayed with TaC coating and let dry, the coating appeared slightly bubbly once dried [see attached photos].
The target boat was wrapped with 3-layers of Ta-heat shield.
    Reply  Friday, January 24, 2014, 14:45, Laura Lambert, Empty, 40282-1, TARGET BOAT, In progress, Sintering Ta target boat with TaC coating 


    
        
            Laura Lambert wrote:
        
        
            
            Thursday, January 23, 2014, 16:26 
    Reply  Monday, January 27, 2014, 11:03, Laura Lambert, Empty, 40282-1, TARGET BOAT, Done, Sintering Ta target boat with TaC coating IMG_20140128_113257662.jpg


    
        
            Laura Lambert wrote:
        
        
            
            
            
Entry  Wednesday, February 05, 2014, 14:29, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_01 UO2_cast1.jpgUO2_cast2.jpgUO2_target_boat.jpgpre_auto-ramp.JPG
 Wednesday, February 05, 2014, 14:13
1st attempt: 
UO2/C green was prepared on Feb 4, 2014 [tues]. The slurry was cast on a piece of glass coated with WD40.
    Reply  Wednesday, March 05, 2014, 10:30, Laura Lambert, , , TARGET BOAT, In progress, Re-sinterring end caps 


    
        
            John Wong wrote:
        
        
            
            Tuesday, March 04, 2014, 15:43
    Reply  Wednesday, July 09, 2014, 13:57, Laura Lambert, ThO2, 40282-2, TARGET BOAT, Done, Test: Sintering ThO2 with Nb backing foils  test_batch_full_sintering.JPGjul9_2014_(2).jpg


    
        
            John Wong wrote:
        
        
            
            Friday, July 04, 2014, 10:13
Entry  Tuesday, August 26, 2014, 15:27, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_03 carbonization.JPG
 Tuesday, August 26, 2014, 11:54
UO2/C green was prepared Aug 20, 2014. The slurry was cast on a piece of glass coated with WD40 on Aug 21, 2014.
The cast peeled off the glass nicely Aug 22, 2014 and let dry until Aug 25, 2014.
Entry  Tuesday, September 23, 2014, 15:00, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, In progress, Processing UC2Flk_04 
 Tuesday, September 23, 2014, 14:54
UO2/C green was prepared Sept 18, 2014. The slurry was cast on a piece of glass coated with WD40 on Sept 19, 2014.
The cast was let dry over the weekend and peeled off the glass nicely Sept 22, 2014.
Entry  Friday, October 17, 2014, 11:55, Laura Lambert, UC2, 40282-5, LP-SIS, In progress, Conditioning UCx #11 
 Friday, October 17, 2014, 11:47
Target container was previously coated with TaC spray and sintered.
It's is wrapped with 3 layers of Ta-heat shield, including the center block.
    Reply  Monday, November 10, 2014, 13:50, Laura Lambert, UC2, 40282-5, LP-SIS, Done, Conditioning UCx #11 


    
        
            John Wong wrote:
        
        
            
            
            