Thursday, September 19, 2013, 15:41, Laura Lambert, UO2/C, Target Boat #2, , In progress, Processing UC2 flakes (batch #07 - 09192013)
|
Thursday, September 19, 2013, 15:35
UO2/C green was prepared on Aug 17, 2013. The slurry was cast on a piece of glass coated with WD40.
The cast was let dry until Aug 19, 2013. |
Friday, September 20, 2013, 13:49, John Wong, UO2/C, Target Boat #2, , Done, Processing UC2Flk_00
|
Laura Lambert wrote:
Thursday, September 19, 2013, 15:35 |
Wednesday, February 05, 2014, 14:29, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_01
|
Wednesday, February 05, 2014, 14:13
1st attempt:
UO2/C green was prepared on Feb 4, 2014 [tues]. The slurry was cast on a piece of glass coated with WD40. |
Monday, March 24, 2014, 17:53, John Wong, UO2/C, , TARGET BOAT, Done, Processing UC2Flk_02
|
Monday, March 24, 2014, 17:50
UO2/C cast was prepared on March 21 and let dry over the weekend. The cast looks pretty good, and it was rolled up and wrapped in a
piece of graphite sheet. |
Tuesday, August 26, 2014, 15:27, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_03
|
Tuesday, August 26, 2014, 11:54
UO2/C green was prepared Aug 20, 2014. The slurry was cast on a piece of glass coated with WD40 on Aug 21, 2014.
The cast peeled off the glass nicely Aug 22, 2014 and let dry until Aug 25, 2014. |
Tuesday, September 23, 2014, 15:00, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, In progress, Processing UC2Flk_04
|
Tuesday, September 23, 2014, 14:54
UO2/C green was prepared Sept 18, 2014. The slurry was cast on a piece of glass coated with WD40 on Sept 19, 2014.
The cast was let dry over the weekend and peeled off the glass nicely Sept 22, 2014. |
Friday, October 10, 2014, 14:00, John Wong, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_04
|
Laura Lambert wrote:
Tuesday, September 23, 2014, 14:54 |
Monday, January 26, 2015, 11:28, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_05
|
Monday, January 26, 2015, 11:19
UO2/C green was prepared Jan 20, 2015. The slurry was cast on a piece of glass coated with WD40 on Jan 21, 2015.
The cast was let dry over the weekend and peeled off the glass nicely Jan 26, 2014. [see attached picture] |
Monday, May 11, 2015, 11:49, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_06
|
Monday, May 11, 2015, 11:45
UO2/C green was prepared May 6, 2015. The slurry was cast on a piece of glass coated with WD40
on May 7, 2015. |
Thursday, July 30, 2015, 17:19, John Wong, UO2/C, 40282-1, TARGET BOAT, In progress, Processing UC2_flk_07
|
Thursday, July 30, 2015, 17:10
The mixture of UO2/C was prepared on July 13, 2015. See screen shot for more info.
The material is loaded into a target boat and wrapped with 3 layers of Ta-heat shield. |
Tuesday, August 11, 2015, 10:23, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2_flk_07
|
John Wong wrote:
Thursday, July 30, 2015, 17:10 |
Wednesday, August 19, 2015, 11:44, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_08 8x
|
Wednesday, August 19, 2015, 11:02
UO2/C green was prepared Aug 11, 2015. The slurry was cast on a piece of glass coated with WD40
on Aug 12, 2015. |
Monday, September 14, 2015, 15:31, John Wong, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_09
|
Monday, September 14, 2015, 15:28
Green cast dried UO2/C + organic mass = 61.31g
The green was rolled up and wrapped in a piece of graphite sheet. |
Friday, December 04, 2015, 15:06, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, 1stepUCx project - round1
|
Wednesday, December 02, 2015, 14:08
UO2/C was cast onto a graphite sheet in the fume hood and let dry.
Initial UO2 powder used = 25.11g (Inventory R-00835A, UO2 + bottle = 243.44g before use) |
Thursday, December 10, 2015, 10:59, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, 1stepUCx project - round2
|
Thursday, December 10, 2015, 08:54
Filled graphite tube with 34 UO2/C discs cast onto graphite.
34 discs = 4.10g |
Tuesday, March 08, 2016, 11:19, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_10
|
Tuesday, March 08, 2016, 10:01
UO2/C green was prepared March 2, 2016.
This was the first time using the new rack built for holding multiple casts [see photo attached] |
Tuesday, April 05, 2016, 11:12, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_11
|
Tuesday, April 05, 2016, 10:58
UO2/C green was prepared March 31, 2016.
The cast peeled off the glass nicely April 1, 2016 and finished drying over the weekend. [see |
Friday, September 23, 2016, 16:09, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, Done, Processing UC2Flk_12
|
Friday, September 23, 2016, 16:01
*Note: materials were scaled back small amount since only 48.5g of UO2 was left in bottle when usually 50g required to make slurry
UO2/C green was prepared September 22, 2016. |
Monday, November 07, 2016, 13:34, Laura Lambert, UO2/C, 40282-1, TARGET BOAT, In progress, Processing UC2Flk_13
|
Monday, November 07, 2016, 13:29
UO2/C green was prepared Nov 3rd, 2016.
This is the first cast made with the new batch of UO2 [but from the same purchase as the last |
Tuesday, November 15, 2016, 10:02, John Wong, UO2/C, 40282-1, TARGET BOAT, In progress, Processing UC2Flk_13
|
Laura Lambert wrote:
Monday, November 07, 2016, 13:29 |
|