Tuesday, January 14, 2025, 16:28, Darwin Ortiz Rosales, UO2/C, conditioning oven#3, LP TUBE, Done, UCx250113 reduction
|
Tuesday, January 14, 2025, 16:26
Cartridge #22 loaded with 211 discs including 3 analysis discs |
Thursday, September 19, 2024, 22:48, Darwin Ortiz Rosales, UO2/C, conditioning oven#3, LP TUBE, Done, UCx240917 reduction
|
Thursday, September 19, 2024, 22:44
Cartridge #21 loaded with 211 discs including 3 analysis discs |
Tuesday, September 17, 2024, 06:49, Darwin Ortiz Rosales, UO2/C, , LP TUBE, Done, UCx240916 reduction
|
Tuesday, September 17, 2024, 06:45
Cartridge #20 loaded with 224 discs plus 3 analysis discs
To be reduced inside a Ta container tube. Tube wrapped in 3 Ta foil heatshields. |
Thursday, September 12, 2024, 06:23, Darwin Ortiz Rosales, UO2/C, , LP TUBE, Done, UCx240904 reduction
|
Thursday, September 12, 2024, 06:19
Cartridge #19 loaded with 232 discs including 5 analysis discs
To be reduced inside a Ta container tube. Tube wrapped in 3 Ta foil heatshields. |
Tuesday, April 09, 2024, 14:43, Darwin Ortiz Rosales, UO2, , LP TUBE, Done, UCx240408 reduction
|
Tuesday, April 09, 2024, 14:42
Cartridge #16 loaded with 213 plus 3 analysi discs
To be reduced inside a Ta container tube. Tube wrapped in 3 Ta foil heatshields. |
Monday, November 14, 2011, 11:56, Peter Kunz , UC2, 38634-10, LP-SIS, Done, UCx03: Conditioning up to 175A
|
Evaporator was cleaned Nov 11 from after target was conditioned up to 175A. There was significant condensation of oily fluid on the left side where the
target container was open (D-shaped end cap). There were also deposits in the hole for the ionizer, but the ionizer itself seemed to be clean. |
Friday, October 11, 2013, 18:10, John Wong, UC2, 39814-IV, LP-IG-LIS, Done, UCx#8 - Final Conditioning
|
Friday, October 11, 2013, 18:00
The target container was previously coated with TaC and sintered in Evap 2. |
Tuesday, July 10, 2012, 12:54, John Wong, UC2, 38634-9, LP-SIS, Done, UCx#4 final conditioning completed
|
Tuesday, July 10, 2012, 12:44
Target contains 230 discs of UCx (material from UC2 flakes, batch#01-04062012).
Total UCx mass (UC2 + C-grv extra + C-foil + Org.) = 38.564g |
Thursday, November 03, 2011, 09:24, John Wong, UC2, 38634-10, LP-SIS, Done, UCx#3: Final conditioning
|
Thursday, November 03, 2011, 08:59
Target was previously coated/sintered with TaC & wrapped with 3 Ta-heat shields, including the back-block.
Target was loaded with 365 UC2 discs + 3 samples for analysis. |
Thursday, October 06, 2011, 12:22, John Wong, UO2/C, UCx-heatboat#2, , Done, UCx#3: Batch#2 - UO2/C mixture of carbonization
|
Thursday, October 06, 2011, 12:19
UO2/C mixture was made on Oct 4 and casted on a piece of glass costed with WD40, and let dried in the fume hood for 2days. |
Thursday, September 29, 2011, 10:58, John Wong, UO2/C, UCx-heatboat#2, , Done, UCx#3: Batch#1 - UO2/C mixture of carbonization 6x
|
Thursday, September 29, 2011, 10:54
UO2/C mixture was made on Tuesday Sept 27, casted on a piece of glass and let dried in the fume hood for ~2days.
Dried UO2/C mass = 61.72g |
Friday, June 03, 2022, 06:21, Darwin Ortiz Rosales, UO2/C, 42218-4, LP-IG-LIS, Done, UCx#39 reduction
|
Friday, June 03, 2022, 06:24
A loaded graphite cartridge was set in a tantalum boated and wrapped with 3 tantalum sheets (previous
day) |
Thursday, September 23, 2021, 07:03, Darwin Ortiz Rosales, UO2/C, , TARGET BOAT, Done, UCx#35 C reduction
|
Thursday, September 23, 2021, 06:55
A loaded graphite cartridge was set in a tantalum boated and wrapped with 3 tantalum sheets (Wednesday
September 22) |
Wednesday, June 30, 2021, 13:35, Darwin Ortiz Rosales, UO2/C, , TARGET BOAT, Done, UCx#34 conditioning
|
Target #34 was installed in the EVAP1 and pumped down (Tuesday June 29, 2021).
Target #34 is going to be conditioned on a Ta boat wrapped with 3 Ta foils.
IGP1 = 1.85e-6 Torr |
Wednesday, June 03, 2020, 08:10, Darwin Ortiz Rosales, UO2/C, , TARGET BOAT, Done, UCx#34 Carbothermal Reduction
|
Wednesday, June 03, 2020, 08:11
A loaded graphite cartridge was set in a tantalum boated and wrapped with 3 tantalum sheets (Friday
May 29, 2020) |
Saturday, June 05, 2021, 09:14, Marla Cervantes, UC2, , TARGET BOAT, In progress, UCx#33 Conditioning
|
Saturday, June 05, 2021, 08:57
Target #33 was installed in the EVAP1 and pumped down yesterday (Friday 4).
Target #33 is going to be conditioned on a Ta boat wrapped with 3 Ta foils. |
Tuesday, May 26, 2020, 20:44, Darwin Ortiz Rosales, UO2/C, , TARGET BOAT, Done, UCx#33 Carbothermal Reduction
|
Tuesday, May 26, 2019, 18:20
A loaded graphite cartridge was set in a tantalum boated and wrapped with 3 tantalum sheets (Friday
May 22, 2020) |
Wednesday, November 06, 2019, 11:48, Marla Cervantes, UC2, 44062-3 , LP-SIS, Done, UCx#30 Conditioning
|
Tuesday, November 05, 2019, 16:43
A TaC coated target container was loaded with a graphite cartridge with UCx
The target container has 3 heat shields |
Monday, October 28, 2019, 11:23, Marla Cervantes, UO2/C, , TARGET BOAT, In progress, UCx#30 Carbothermal Reduction
|
Monday, October 28, 2019, 10:29
A loaded graphite cartridge was set in a tantalum boated and wrapped with 3 tantalum sheets
The set up was installed in the EVAP1 and pumped dwon during the weekend. |
Thursday, October 31, 2019, 13:59, Marla Cervantes, UO2/C, , TARGET BOAT, Problems, UCx#30 Carbothermal Reduction
|
Marla Cervantes wrote:
Monday, October 28, 2019, 10:29 |
|