ID |
Date |
Author |
Target Material |
Target Oven W.O# |
Source |
Status |
Subject |
Text |
|
295
|
Tuesday, January 14, 2025, 16:28 |
Darwin Ortiz Rosales | UO2/C | conditioning oven#3 | LP TUBE | Done | UCx250113 reduction | Tuesday, January 14, 2025, 16:26
Cartridge #22 loaded with 211 discs |
|
294
|
Thursday, September 19, 2024, 22:48 |
Darwin Ortiz Rosales | UO2/C | conditioning oven#3 | LP TUBE | Done | UCx240917 reduction | Thursday, September 19, 2024, 22:44
Cartridge #21 loaded with 211 discs |
|
293
|
Tuesday, September 17, 2024, 06:49 |
Darwin Ortiz Rosales | UO2/C | | LP TUBE | Done | UCx240916 reduction | Tuesday, September 17, 2024, 06:45
Cartridge #20 loaded with 224 discs
plus 3 analysis discs |
|
292
|
Thursday, September 12, 2024, 06:23 |
Darwin Ortiz Rosales | UO2/C | | LP TUBE | Done | UCx240904 reduction |
Thursday, September 12, 2024, 06:19
Cartridge #19 loaded with 232 discs
including 5 analysis discs |
|
291
|
Tuesday, April 09, 2024, 14:43 |
Darwin Ortiz Rosales | UO2 | | LP TUBE | Done | UCx240408 reduction | Tuesday, April 09, 2024, 14:42
Cartridge #16 loaded with 213 plus
3 analysi discs |
|
44
|
Monday, November 14, 2011, 11:56 |
Peter Kunz | UC2 | 38634-10 | LP-SIS | Done | UCx03: Conditioning up to 175A | Evaporator was cleaned Nov 11 from after
target was conditioned up to 175A. There
was significant condensation of oily fluid |
|
81
|
Friday, October 11, 2013, 18:10 |
John Wong | UC2 | 39814-IV | LP-IG-LIS | Done | UCx#8 - Final Conditioning | Friday, October 11, 2013, 18:00
|
|
55
|
Tuesday, July 10, 2012, 12:54 |
John Wong | UC2 | 38634-9 | LP-SIS | Done | UCx#4 final conditioning completed | Tuesday, July 10, 2012, 12:44
Target contains 230 discs of UCx
(material from UC2 flakes, batch#01-04062012). |
|
43
|
Thursday, November 03, 2011, 09:24 |
John Wong | UC2 | 38634-10 | LP-SIS | Done | UCx#3: Final conditioning | Thursday, November 03, 2011, 08:59
Target was previously coated/sintered
with TaC & wrapped with 3 Ta-heat shields, |
|
42
|
Thursday, October 06, 2011, 12:22 |
John Wong | UO2/C | UCx-heatboat#2 | | Done | UCx#3: Batch#2 - UO2/C mixture of carbonization | Thursday, October 06, 2011, 12:19
|
|
41
|
Thursday, September 29, 2011, 10:58 |
John Wong | UO2/C | UCx-heatboat#2 | | Done | UCx#3: Batch#1 - UO2/C mixture of carbonization | Thursday, September 29, 2011, 10:54
UO2/C mixture was made on Tuesday
Sept 27, casted on a piece of glass and let |
6x |
282
|
Friday, June 03, 2022, 06:21 |
Darwin Ortiz Rosales | UO2/C | 42218-4 | LP-IG-LIS | Done | UCx#39 reduction |
Friday, June 03, 2022, 06:24
|
|
275
|
Thursday, September 23, 2021, 07:03 |
Darwin Ortiz Rosales | UO2/C | | TARGET BOAT | Done | UCx#35 C reduction | Thursday, September 23, 2021, 06:55
A loaded graphite cartridge |
|
272
|
Wednesday, June 30, 2021, 13:35 |
Darwin Ortiz Rosales | UO2/C | | TARGET BOAT | Done | UCx#34 conditioning | Target
#34 was installed in the EVAP1 and pumped
down (Tuesday June 29, 2021). |
|
262
|
Wednesday, June 03, 2020, 08:10 |
Darwin Ortiz Rosales | UO2/C | | TARGET BOAT | Done | UCx#34 Carbothermal Reduction | Wednesday, June 03, 2020, 08:11
A loaded graphite cartridge |
|
271
|
Saturday, June 05, 2021, 09:14 |
Marla Cervantes | UC2 | | TARGET BOAT | In progress | UCx#33 Conditioning | Saturday, June 05, 2021, 08:57
Target #33 was installed in |
|
259
|
Tuesday, May 26, 2020, 20:44 |
Darwin Ortiz Rosales | UO2/C | | TARGET BOAT | Done | UCx#33 Carbothermal Reduction | Tuesday, May 26, 2019,
18:20 |
|
251
|
Wednesday, November 06, 2019, 11:48 |
Marla Cervantes | UC2 | 44062-3 | LP-SIS | Done | UCx#30 Conditioning | Tuesday, November 05, 2019, 16:43
A TaC coated target container |
|
248
|
Monday, October 28, 2019, 11:23 |
Marla Cervantes | UO2/C | | TARGET BOAT | In progress | UCx#30 Carbothermal Reduction | Monday, October 28, 2019, 10:29
A loaded graphite cartridge was set
in a tantalum boated and wrapped with 3 tantalum |
|
249
|
Thursday, October 31, 2019, 13:59 |
Marla Cervantes | UO2/C | | TARGET BOAT | Problems | UCx#30 Carbothermal Reduction |
|
|
|