  218   Friday, September 21, 2018, 10:22 Anders MjosUC241369-2 DoneUCx Fully loaded graphite insert thermal test - FL#1.2


   
        
            
  
  153   Wednesday, June 07, 2017, 12:48 Aaron Schmidt    Turbo pump cooling Wednesday, June 07, 2017, 10:00-12:00:
Cooling was split/routed from two bottom
lines with tees and run to the turbo pump.
  
  165   Thursday, September 07, 2017, 14:26 Aaron Schmidt   Maintenanceroughing pump oil replaced Thursday, September 07, 2017, 11:00
-12:00
The roughing pump was disconnected
  
  166   Wednesday, September 20, 2017, 08:07 Aaron Schmidt   MaintenanceIon gauge & RP statusWednesday, September 20, 2017, 08:00: 
-A new ion gauge was installed yesterday
afternoon and the old one removed. The old
  
  212   Tuesday, June 26, 2018, 12:12 Aaron Schmidt   Problems resolvedGloves replaced. Tuesday, June 26, 2018, 09:30. Gloves
on evap 1 changed out. 
The original right one was otrn.
  
  233   Thursday, March 21, 2019, 09:03 Aaron Schmidt   In progressEvap 1 pump down issueOn Tuesday it was noted that evaporator
1 was not pumping down properly. It was vented
and the seal & seal face wiped with a
  
  234   Tuesday, March 26, 2019, 08:58 Aaron Schmidt   MaintenanceRoughing pump oiled.Oiled as per work permit:     
  250   Tuesday, November 05, 2019, 14:50 Aaron Schmidt   MaintenanceFallen Bolt. One of the TBHT bolts  fell out of reach   
  261   Monday, June 01, 2020, 09:29 Aaron Schmidt   ProblemsIEVAP:IGP1 swap out Replacement of electronic / controller
head from INIFICON - BPG to Agilent - Model:
FRG-730 due to EVAP 1 trips.
  
  260   Monday, June 01, 2020, 09:29 Aaron Schmidt   ProblemsIEVAP:IGP1 swap out Replacement of electronic / controller
head from INIFICON - BPG to Agilent - Model:
FRG-730 due to EVAP 1 trips.
  
  264   Tuesday, August 18, 2020, 12:40 Aaron Schmidt    IEVAP:IGP1 swap out INIFICON -  BPG - SN: 232
PN: 353-573
Tuesday, August 18, 2020, 10:38:
  
  3   Monday, March 28, 2011, 11:20    HP-FEBIADDoneDiffusion Bonding of Ta Fins for FEBIAD HP-A (w.o#38481-4)
  
  5   Tuesday, March 29, 2011, 10:20     ProblemsLoss of cooling waterAccording to Jonathan Aoki, the electricians
will be servicing another MCC which will
result in loss of cooling water for about
  
  6   Tuesday, March 29, 2011, 10:30     DoneLoss of cooling water updateIt's the NON-ACTIVE water that will go
off.  The evaporator is on sity water,
so it will be OK.
  