    Reply  Friday, September 21, 2018, 10:22, Anders Mjos, UC2, 41369-2, , Done, UCx Fully loaded graphite insert thermal test - FL#1.2 


    
        
            Marla Cervantes wrote:
        
        
            
             Monday, September 03, 2018, 10:17
Entry  Wednesday, June 07, 2017, 12:48, Aaron Schmidt, , , , , Turbo pump cooling 
 Wednesday, June 07, 2017, 10:00-12:00: Cooling was split/routed from two bottom lines with tees and run to the turbo pump.
 
Entry  Thursday, September 07, 2017, 14:26, Aaron Schmidt, , , , Maintenance, roughing pump oil replaced 
 Thursday, September 07, 2017, 11:00 -12:00
The roughing pump was disconnected from Evaporator 1, along with the exhaust/ventilation. No contamination was found on swipes.
The oil was refilled.
Entry  Wednesday, September 20, 2017, 08:07, Aaron Schmidt, , , , Maintenance, Ion gauge & RP status 
Wednesday, September 20, 2017, 08:00: 
-A new ion gauge was installed yesterday afternoon and the old one removed. The old IG was found to be contaminated (300 cpm) and as of 20/09/2017,
it is double bagged and stashed underneath the evaporator for the time being. 
Entry  Tuesday, June 26, 2018, 12:12, Aaron Schmidt, , , , Problems resolved, Gloves replaced. 
 Tuesday, June 26, 2018, 09:30. Gloves on evap 1 changed out. 
The original right one was otrn. Left was o but worn. Both replaced with new gloves.
Entry  Thursday, March 21, 2019, 09:03, Aaron Schmidt, , , , In progress, Evap 1 pump down issue 
On Tuesday it was noted that evaporator 1 was not pumping down properly. It was vented and the seal & seal face wiped with a cloth. The initial pump
down rate was faster, however after 48 hrs, it has still not pumped down to appropriate levels. 
Thursday, March 21, 2019, 08:59: IV1 closed & TP1 off. 
Entry  Tuesday, March 26, 2019, 08:58, Aaron Schmidt, , , , Maintenance, Roughing pump oiled. 
Oiled as per work permit:  I2019-03-26-2.
Tuesday, March 26, 2019, 08:53: Start RP1
Entry  Tuesday, November 05, 2019, 14:50, Aaron Schmidt, , , , Maintenance, Fallen Bolt. 
 One of the TBHT bolts  fell out of reach and may be sitting
on the isolation valve or TP.
Remove TP as per WP:  
Entry  Monday, June 01, 2020, 09:29, Aaron Schmidt, , , , Problems, IEVAP:IGP1 swap out 
 Replacement of electronic / controller head from INIFICON - BPG to Agilent - Model: FRG-730 due to EVAP 1 trips.
Monday, June 01, 2020, 09:37: Swap complete. 
Entry  Monday, June 01, 2020, 09:29, Aaron Schmidt, , , , Problems, IEVAP:IGP1 swap out 
 Replacement of electronic / controller head from INIFICON - BPG to Agilent - Model: FRG-730 due to EVAP 1 trips.
Entry  Tuesday, August 18, 2020, 12:40, Aaron Schmidt, , , , , IEVAP:IGP1 swap out 
 INIFICON -  BPG - SN: 232
PN: 353-573
Tuesday, August 18, 2020, 10:38: Control head for IGP1 swapped with bagged one.
    Reply  Monday, March 28, 2011, 11:20, , , , HP-FEBIAD, Done, Diffusion Bonding of Ta Fins for FEBIAD HP-A (w.o#38481-4) 


    
        
            John
Wong wrote:
        
        
            
            
            
Entry  Tuesday, March 29, 2011, 10:20, , , , , Problems, Loss of cooling water 
According to Jonathan Aoki, the electricians will be servicing another MCC which will result in loss of cooling water for about 8 hours starting at 16:00
March 30.  We shouldn't be running the evaporator or any condensers at that time.
Entry  Tuesday, March 29, 2011, 10:30, , , , , Done, Loss of cooling water update 
It's the NON-ACTIVE water that will go off.  The evaporator is on sity water, so it will be OK.