  ID Date Author Target Material Target Oven W.O#down Source Status Subject Text Attachments
  225   Tuesday, October 23, 2018, 10:55 Marla CervantesUC2 LP-SISDoneConditioning UCx#25

    

       
            
 OrangeCoat.jpgIonizerTube.jpgClosedSide.jpg 
  233   Thursday, March 21, 2019, 09:03 Aaron Schmidt   In progressEvap 1 pump down issueOn Tuesday it was noted that evaporator
1 was not pumping down properly. It was vented
and the seal & seal face wiped with a
  
  234   Tuesday, March 26, 2019, 08:58 Aaron Schmidt   MaintenanceRoughing pump oiled.Oiled as per work permit:     
  239   Monday, June 17, 2019, 08:58 Marla CervantesUO2/C TARGET BOATDoneUCx#27 Carbothermal reductionFriday, June 14, 2019, 17:10
A 14 mm die was used to cut
  
  240   Tuesday, July 30, 2019, 10:27 Marla CervantesUO2/C TARGET BOATDoneUCx#28 Carbothermal reductionFriday,
June 26, 2019, 17:10
 UCx28.JPG 
  246   Wednesday, October 02, 2019, 11:10 Marla CervantesUO2/C TARGET BOATDoneUCx#29 Carbothermal reduction Wednesday, October 02, 2019, 11:09
A graphite cartridge loaded with
UO2/C foils, wrapped with three Ta heat shields
 CarbothermalReduction-UCx29.JPG 
  248   Monday, October 28, 2019, 11:23 Marla CervantesUO2/C TARGET BOATIn progressUCx#30 Carbothermal ReductionMonday, October 28, 2019, 10:29
A loaded graphite cartridge was set
in a tantalum boated and wrapped with 3 tantalum
 UCx30-CarbothramlReduction.JPGUCx30-CurrentDrop.JPG 
  249   Thursday, October 31, 2019, 13:59 Marla CervantesUO2/C TARGET BOATProblemsUCx#30 Carbothermal Reduction

    

       
            
  
  250   Tuesday, November 05, 2019, 14:50 Aaron Schmidt   MaintenanceFallen Bolt. One of the TBHT bolts  fell out of reach   
  259   Tuesday, May 26, 2020, 20:44 Darwin Ortiz RosalesUO2/C TARGET BOATDoneUCx#33 Carbothermal Reduction Tuesday, May 26, 2019,
18:20
  
  261   Monday, June 01, 2020, 09:29 Aaron Schmidt   ProblemsIEVAP:IGP1 swap out Replacement of electronic / controller
head from INIFICON - BPG to Agilent - Model:
FRG-730 due to EVAP 1 trips.
  
  260   Monday, June 01, 2020, 09:29 Aaron Schmidt   ProblemsIEVAP:IGP1 swap out Replacement of electronic / controller
head from INIFICON - BPG to Agilent - Model:
FRG-730 due to EVAP 1 trips.
  
  262   Wednesday, June 03, 2020, 08:10 Darwin Ortiz RosalesUO2/C TARGET BOATDoneUCx#34 Carbothermal ReductionWednesday, June 03, 2020, 08:11 
A loaded graphite cartridge
  
  264   Tuesday, August 18, 2020, 12:40 Aaron Schmidt    IEVAP:IGP1 swap out INIFICON -  BPG - SN: 232
PN: 353-573
Tuesday, August 18, 2020, 10:38:
  
  270   Thursday, April 15, 2021, 15:01 Marla Cervantes    IGP1 patchThursday, March 31, 2021, 14:42 
 
EVAP1's TGHT has
  
  271   Saturday, June 05, 2021, 09:14 Marla CervantesUC2 TARGET BOATIn progressUCx#33 Conditioning Saturday, June 05, 2021, 08:57
Target #33 was installed in
  
  272   Wednesday, June 30, 2021, 13:35 Darwin Ortiz RosalesUO2/C TARGET BOATDoneUCx#34 conditioningTarget
#34 was installed in the EVAP1 and pumped
down (Tuesday June 29, 2021).
  
  273   Wednesday, July 07, 2021, 12:40 Darwin Ortiz RosalesUO2/C TARGET BOATDoneUCx Provisional ID= 200229 conditioning Wednesday, July 07, 2021, 14:39
Target Provisional ID = 200929
  
  274   Wednesday, September 15, 2021, 07:19 Marla CervantesUC2 TARGET BOATDoneConditioning 2sc samplesWednesday, September 14, 2021, 21:14
Boat is wrapped with 2 layers
  
  275   Thursday, September 23, 2021, 07:03 Darwin Ortiz RosalesUO2/C TARGET BOATDoneUCx#35 C reduction Thursday, September 23, 2021, 06:55
A loaded graphite cartridge
  