ID |
Date |
Author |
Target Material |
Target Oven W.O# |
Source |
Status |
Subject |
Text |
|
225
|
Tuesday, October 23, 2018, 10:55 |
Marla Cervantes | UC2 | | LP-SIS | Done | Conditioning UCx#25 |
|
|
233
|
Thursday, March 21, 2019, 09:03 |
Aaron Schmidt | | | | In progress | Evap 1 pump down issue | On Tuesday it was noted that evaporator
1 was not pumping down properly. It was vented
and the seal & seal face wiped with a |
|
234
|
Tuesday, March 26, 2019, 08:58 |
Aaron Schmidt | | | | Maintenance | Roughing pump oiled. | Oiled as per work permit: |
|
239
|
Monday, June 17, 2019, 08:58 |
Marla Cervantes | UO2/C | | TARGET BOAT | Done | UCx#27 Carbothermal reduction | Friday, June 14, 2019, 17:10
A 14 mm die was used to cut |
|
240
|
Tuesday, July 30, 2019, 10:27 |
Marla Cervantes | UO2/C | | TARGET BOAT | Done | UCx#28 Carbothermal reduction | Friday,
June 26, 2019, 17:10
|
|
246
|
Wednesday, October 02, 2019, 11:10 |
Marla Cervantes | UO2/C | | TARGET BOAT | Done | UCx#29 Carbothermal reduction | Wednesday, October 02, 2019, 11:09
A graphite cartridge loaded with
UO2/C foils, wrapped with three Ta heat shields |
|
248
|
Monday, October 28, 2019, 11:23 |
Marla Cervantes | UO2/C | | TARGET BOAT | In progress | UCx#30 Carbothermal Reduction | Monday, October 28, 2019, 10:29
A loaded graphite cartridge was set
in a tantalum boated and wrapped with 3 tantalum |
|
249
|
Thursday, October 31, 2019, 13:59 |
Marla Cervantes | UO2/C | | TARGET BOAT | Problems | UCx#30 Carbothermal Reduction |
|
|
250
|
Tuesday, November 05, 2019, 14:50 |
Aaron Schmidt | | | | Maintenance | Fallen Bolt. | One of the TBHT bolts fell out of reach |
|
259
|
Tuesday, May 26, 2020, 20:44 |
Darwin Ortiz Rosales | UO2/C | | TARGET BOAT | Done | UCx#33 Carbothermal Reduction | Tuesday, May 26, 2019,
18:20 |
|
261
|
Monday, June 01, 2020, 09:29 |
Aaron Schmidt | | | | Problems | IEVAP:IGP1 swap out | Replacement of electronic / controller
head from INIFICON - BPG to Agilent - Model:
FRG-730 due to EVAP 1 trips. |
|
260
|
Monday, June 01, 2020, 09:29 |
Aaron Schmidt | | | | Problems | IEVAP:IGP1 swap out | Replacement of electronic / controller
head from INIFICON - BPG to Agilent - Model:
FRG-730 due to EVAP 1 trips. |
|
262
|
Wednesday, June 03, 2020, 08:10 |
Darwin Ortiz Rosales | UO2/C | | TARGET BOAT | Done | UCx#34 Carbothermal Reduction | Wednesday, June 03, 2020, 08:11
A loaded graphite cartridge |
|
264
|
Tuesday, August 18, 2020, 12:40 |
Aaron Schmidt | | | | | IEVAP:IGP1 swap out | INIFICON - BPG - SN: 232
PN: 353-573
Tuesday, August 18, 2020, 10:38: |
|
270
|
Thursday, April 15, 2021, 15:01 |
Marla Cervantes | | | | | IGP1 patch | Thursday, March 31, 2021, 14:42
EVAP1's TGHT has |
|
271
|
Saturday, June 05, 2021, 09:14 |
Marla Cervantes | UC2 | | TARGET BOAT | In progress | UCx#33 Conditioning | Saturday, June 05, 2021, 08:57
Target #33 was installed in |
|
272
|
Wednesday, June 30, 2021, 13:35 |
Darwin Ortiz Rosales | UO2/C | | TARGET BOAT | Done | UCx#34 conditioning | Target
#34 was installed in the EVAP1 and pumped
down (Tuesday June 29, 2021). |
|
273
|
Wednesday, July 07, 2021, 12:40 |
Darwin Ortiz Rosales | UO2/C | | TARGET BOAT | Done | UCx Provisional ID= 200229 conditioning | Wednesday, July 07, 2021, 14:39
Target Provisional ID = 200929 |
|
274
|
Wednesday, September 15, 2021, 07:19 |
Marla Cervantes | UC2 | | TARGET BOAT | Done | Conditioning 2sc samples | Wednesday, September 14, 2021, 21:14
Boat is wrapped with 2 layers |
|
275
|
Thursday, September 23, 2021, 07:03 |
Darwin Ortiz Rosales | UO2/C | | TARGET BOAT | Done | UCx#35 C reduction | Thursday, September 23, 2021, 06:55
A loaded graphite cartridge |
|