  171   Tuesday, November 07, 2017, 12:04 Laura Lambert   MaintenanceNoise levels checked - ear protection not required. Tuesday, November 07, 2017, 11:58
Noise levels were checked with monitor
by Terry.
  
  174   Wednesday, November 22, 2017, 14:20 Laura Lambert   MaintenanceNew eye wash for hot lab! Wednesday, November 22, 2017, 11:05
Eye wash installed yesterday, simple
attachment on sink spout.
  
  212   Tuesday, June 26, 2018, 12:12 Aaron Schmidt   Problems resolvedGloves replaced. Tuesday, June 26, 2018, 09:30. Gloves
on evap 1 changed out. 
The original right one was otrn.
  
  216   Friday, August 17, 2018, 11:23 Marla CervantesUC2NA DoneUCx 1-step casting -Oxidation test Friday, August 17, 2018, 11:17
Four discs of UCx produced with the
1-step casting method were placed in a glass
  
  217   Tuesday, September 04, 2018, 10:18 Marla CervantesUC241369-2 In progressUCx Fully loaded graphite insert thermal test - FL#1.2 Monday, September 03, 2018, 10:17
Graphite insert fully loaded
 180904-UCxFL1-T2-2.png 
  218   Friday, September 21, 2018, 10:22 Anders MjosUC241369-2 DoneUCx Fully loaded graphite insert thermal test - FL#1.2


   
        
            
  
  220   Saturday, September 29, 2018, 20:53 John WongUC241369-2 DoneUCx Fully loaded graphite insert thermal test - FL#1.2

    

       
            
  
  233   Thursday, March 21, 2019, 09:03 Aaron Schmidt   In progressEvap 1 pump down issueOn Tuesday it was noted that evaporator
1 was not pumping down properly. It was vented
and the seal & seal face wiped with a
  
  234   Tuesday, March 26, 2019, 08:58 Aaron Schmidt   MaintenanceRoughing pump oiled.Oiled as per work permit:     
  235   Wednesday, March 27, 2019, 08:56 Marla Cervantes 43630-6 DoneGraphite insert test 4 Wednesday, March 27, 2019, 08:50
A graphite insert was set into a
tantalum tube in the evaporator 2 for 3 days
  
  236   Friday, April 05, 2019, 10:08 Marla Cervantes 43630-3 DoneTaC coating/sintering for graphite insert test Friday, April 05, 2019, 10:04
A tantalum tube was coated
 EVAP1-TaC_Coating.JPG 
  237   Wednesday, April 10, 2019, 13:38 Marla Cervantes 43630-3  DoneGraphite insert test #6 Wednesday, April 10, 2019, 13:30
Tantalum foil caps were added to
a graphite insert (see picture caps)
 caps.jpgCurren-voltage-plot.JPG 
  238   Friday, May 24, 2019, 15:25 Marla Cervantes 43943-1 DoneGraphite insert test - FOILS Friday, May 24, 2019, 15:04
A TaC coated tantalum tube, loaded
with graphite foils was transferred to EVAP1
  
  250   Tuesday, November 05, 2019, 14:50 Aaron Schmidt   MaintenanceFallen Bolt. One of the TBHT bolts  fell out of reach   
  252   Wednesday, January 22, 2020, 18:10 Marla CervantesEmptyP2N-02  DoneP2N test#1The assembly consists of two tantalum
foils, 0.001" thick, which are radially
crimped to form a cylindrical surface. The
 6x 
  253   Wednesday, January 29, 2020, 10:11 Marla CervantesEmptyP2N-02 DoneP2N test#2The assembly consists of two tantalum
foils, 0.001" thick, which are radially
crimped to form a cylindrical surface. The
 P2N-test2_final_voltage.JPGP2N-test2.JPG 
  254   Thursday, January 30, 2020, 09:37 Marla CervantesUO2/CP2N-02 In progressP2N target material carbothermal reductionWednesday, January 29 2020, 05:55  
A P2N container  with
  
  255   Thursday, January 30, 2020, 10:15 Marla CervantesUO2/CP2N-02 ProblemsP2N target material carbothermal reduction

    

       
            
  
  256   Thursday, January 30, 2020, 11:53 Marla CervantesUO2/CP2N-02 Problems resolvedP2N target material carbothermal reduction

    

       
            
  
  257   Thursday, January 30, 2020, 13:11 Marla CervantesUO2/CP2N-02 ProblemsP2N target material carbothermal reduction

    

       
            
 voltage-rising.JPG 