Entry  Monday, April 11, 2011, 10:22, John Wong, Empty, 38295-9, HP-FEBIAD, Done, Fins diffusion bonding  pumping_down.jpgAutoheating_parameter_setup.jpggrab.A29589.png
Mon Apr 11 10:21:56 2011: Target is wrapped with 3 Ta-heat shields.  Evaporator is pumping down. 
Mon Apr 11 14:34:32 2011:  Evaporator has been pumped down for over 4 hours.  Vac @ 2.83e-6 Torr.  (see attachment#1 for pumping
down process).
Entry  Tuesday, April 12, 2011, 10:30, John Wong, Empty, 38481-5, HP-FEBIAD, Done, Fins diffusion bonding  grab.s31535.pnggrab.c31573.pngcooling_down.jpg
Tue Apr 12 10:29:38 2011:  Target wrapped with 3 Ta-heat shields.  Evaporator is currently being pumped down.
Tue Apr 12 15:03:55 2011:  Evaporator has been pumped down for over 4 hrs.  Set TGHT @ 20A/ 0.066V, Vac @ 2.46e-6 Torr. (See Attachment#1
pumping down process).
Entry  Wednesday, April 13, 2011, 10:37, John Wong, Empty, 38481-7, HP-FEBIAD, Done, Diffusion bonding of Ta Fins for FEBIAD-HP pumping_down.jpgAutoheating_parameter_setup.jpgcooling_down.jpgwasher_on_target_leg.jpg
Wed Apr 13 10:37:25 2011:  Target is wrapped with 3 Ta-heat shields.  Evaporator is currently being pumped down.
Wed Apr 13 15:28:02 2011:  Evaporator has been pumped down for over 5 hrs.  Vac @ 2.38e-6 Torr.  (See attachment1: Pumping process)
Wed Apr 13 15:29:21 2011: Set TGHT @ 20A/0.074V, Vac 2.98e-6 Torr.
Entry  Thursday, April 14, 2011, 09:53, John Wong, Empty, 37810-1, HP-FEBIAD, Done, Fins Diffusion bonding  cooling_down.jpg
Thu Apr 14 09:52:59 2011: Target is wrapped with 3-Ta heat shield and ready to go into the evaporator. 
Thu Apr 14 11:57:29 2011: The process is on hold until the problem with the screw and the washer of the evaporator is resolved.  See
ID#15 for more details. 
Entry  Thursday, April 14, 2011, 17:03, John Wong, Empty, 38481-7, HP-FEBIAD, Problems resolved, Evap. bolt/washer problems & solutions 6x
 Thu Apr 14 14:03:17 2011:  What did we see after the fin diffusion bonding of Ta fins for FEBIAD-HP (w.o#38481-7) ? : 
1.  A problem occurred during the FEBIAD HP Ta fin diffusion  bonding and was  discovered after the evaporator chamber was opened. 
The  washer was  "wielded" on to the left leg of the target (see attachment  #1: washer  on target leg).  
Entry  Monday, April 18, 2011, 18:14, John Wong, Empty, 38295-8, HP-FEBIAD, Problems, Sintering target oven coated with TaC pumping_down.jpgAutoheating_parameter_setup.jpgvac_curve.jpgoverall_process.jpgoverall_process_2.jpg
Mon Apr 18 18:10:53 2011: 
FEBIAD-HP target (w.o 38295-8) is coated with TaC (previously prepared on Feb 15, 2011).  This target will be used for the SiC run in Oct,
2011.  The target is wrapped with 3 Ta-heat shields and is in the evaporator.  Pumping down of the evaporator is in process, currently vac @
Entry  Wednesday, April 20, 2011, 16:42, John Wong, Empty, 38481-8, HP-FEBIAD, Done, Sintering target oven coated with TaC overall_process.jpg
Wed Apr 20 16:39:46 2011:  Target oven was coated with TaC early today.  The target was allowed to dry and then wrapped with 3 Ta heat-shields. 
The target is in the evaporator and it is being pumped down.  Vac is currently at 9.48e-6 Torr. 
Wed Apr 20 17:51:12 2011 : TGHT @ 60A/0.225V, Vac @ 5.98e-6 Torr. 
Entry  Wednesday, May 11, 2011, 16:23, John Wong, SiC, 38481-8, HP-FEBIAD, Problems, Organics burnoff & Sintering  9x
Wed May 11 16:20:21 2011:  The HP-FEBIAD (w.o#38481-8) was filled with SiC (8.5mm, 555 discs).  The target is wrapped with 3 Ta-heat shields
and is in the evaporator, which is being pumped down. 
Thu May 12 10:52:48 2011:  The evaporator ion gauge, IEVAPIG1 filament burnt out.  The gauge comes in two filaments, so it is now running
Entry  Wednesday, May 18, 2011, 13:13, John Wong, SiC, 38295-8, HP-FEBIAD, Problems, Organics burnoff & Sintering  6x
Wed May 18 13:12:24 2011:  Target is wrapped with 3 Ta-heat shields and is installed in the evaporator which is being pumped down.
Wed May 18 23:11:42 2011:  TGHT was raised to 40A and held for about 6 hours; Vac gradually came down to 2.1e-6 Torr.  TGHT increased
to 90A and pressure is going up, currently vac @ 2.9 e-5 Torr.  Auto heating will begin soon at 0.5A/min --> 820A.  
Entry  Friday, September 09, 2011, 10:05, John Wong, Empty, , HP-FEBIAD, Done, Sintering TaC coating striptool.JPG
Friday, September 09, 2011, 10:05
Target oven coated with TaC, and wrapped with 3-Ta heat shields.  Chamber is currently being pumped down. 
TGHT @ 140A, IG 9.2 e-6 Torr, BP 20mT. 
Entry  Tuesday, September 13, 2011, 16:53, John Wong, SiC, 38295-9, HP-FEBIAD, Done, Ready  9x
Tuesday, September 13, 2011, 16:51
Target is wrapped with 3-Ta heat shields. 
Loaded with 555 SiC discs (total mass 64.24g)
Entry  Wednesday, March 23, 2011, 18:23, John Wong, , , , , Diffusion Bonding of Ta Fins for FEBIAD HP-A (w.o#38481-4) grab.K18246.pnggrab.g20718.pnggrab.r27097.pnggrab.t30095.png
March 23, 2011
12:30: Target oven is wrapped with 3 Ta-heat shields.  Pumping down evaporator
18:24: IEVAPIG1 is reading at 4.55e-6 Torr.  The p/s will be turned on tomorrow since there is no ISAC Ops on site. 
    Reply  Friday, March 25, 2011, 17:22, John Wong, , , , , Diffusion Bonding of Ta Fins for FEBIAD HP-A (w.o#38481-4) 


    
        
            John Wong wrote:
        
        
            
            March 23, 2011
Entry  Tuesday, March 29, 2011, 10:20, , , , , Problems, Loss of cooling water 
According to Jonathan Aoki, the electricians will be servicing another MCC which will result in loss of cooling water for about 8 hours starting at 16:00
March 30.  We shouldn't be running the evaporator or any condensers at that time.
Entry  Tuesday, March 29, 2011, 10:30, , , , , Done, Loss of cooling water update 
It's the NON-ACTIVE water that will go off.  The evaporator is on sity water, so it will be OK.
Entry  Tuesday, May 17, 2011, 16:43, John Wong, , , , Maintenance, Evaporator Ion gauge replaced  
The evaporator ion gauge filament burnt out on May 11, 2011.  A target was in the evaporator at that time and was about to being the sintering process. 
The gauge had two filaments, so vacuum group helped to switch to the second filament.  The evaporator was vented on May 17, 2011, and a new ion gauge
with two filaments was installed.  The gauge was tested and it's working fine. 
Entry  Wednesday, September 07, 2011, 13:33, John Wong, Empty, , , Maintenance, Changed Evaporator#1 Backing Pump oil  
Wednesday, September 07, 2011, 11:18:  
IEVAP:CG2 @ 52mT before oil change. 
Edi D.V changed the oil for the backing pump.  WP#2011-09-07-2. CG2 currently @ 21mT.
Entry  Wednesday, September 07, 2011, 15:40, Anders Mjos, Empty, , , Maintenance, Re-sealing of Glove Box 
2011-09-01:

    Glove box was leaking (air/argon) between base and box. Light was shining through.
    Removed old neoprene seal at base.

   Resealed glove box between base and box with DAP Butylflex. No light shining through after repair.
    Replaced rubber disks at 4 feed-throughs.
Entry  Monday, September 12, 2011, 13:08, John Wong, Empty, Target Boat, , Done, Sintering TaC coating on End Caps striptool.JPG
Monday, September 12, 2011, 13:07
Target boat is loaded with coated TaC end caps for sintering.  Target boat is wrapped with 3 Ta-heat shields. 
Max TGHT = 580A
Entry  Thursday, September 29, 2011, 10:58, John Wong, UO2/C, UCx-heatboat#2, , Done, UCx#3: Batch#1 - UO2/C mixture of carbonization  6x
Thursday, September 29, 2011, 10:54
UO2/C mixture was made on Tuesday Sept 27, casted on a piece of glass and let dried in the fume hood for ~2days. 
Dried UO2/C mass = 61.72g
ELOG V2.9.2-2455