Monday, April 11, 2011, 10:22 |
John Wong | Empty | 38295-9 | HP-FEBIAD | Done | Fins diffusion bonding | Mon Apr 11 10:21:56 2011: Target is wrapped
with 3 Ta-heat shields. Evaporator
is pumping down. |
|
11
|
Tuesday, April 12, 2011, 10:30 |
John Wong | Empty | 38481-5 | HP-FEBIAD | Done | Fins diffusion bonding | Tue Apr 12 10:29:38 2011: Target
wrapped with 3 Ta-heat shields. Evaporator
is currently being pumped down. |
|
12
|
Wednesday, April 13, 2011, 10:37 |
John Wong | Empty | 38481-7 | HP-FEBIAD | Done | Diffusion bonding of Ta Fins for FEBIAD-HP | Wed Apr 13 10:37:25 2011: Target
is wrapped with 3 Ta-heat shields.
Evaporator is currently being pumped down. |
|
13
|
Thursday, April 14, 2011, 09:53 |
John Wong | Empty | 37810-1 | HP-FEBIAD | Done | Fins Diffusion bonding | Thu Apr 14 09:52:59 2011: Target is wrapped
with 3-Ta heat shield and ready to go into
the evaporator. |
|
15
|
Thursday, April 14, 2011, 17:03 |
John Wong | Empty | 38481-7 | HP-FEBIAD | Problems resolved | Evap. bolt/washer problems & solutions | Thu Apr 14 14:03:17 2011:
What did we see after the fin diffusion bonding
of Ta fins for FEBIAD-HP (w.o#38481-7) |
6x |
16
|
Monday, April 18, 2011, 18:14 |
John Wong | Empty | 38295-8 | HP-FEBIAD | Problems | Sintering target oven coated with TaC | Mon Apr 18 18:10:53 2011:
FEBIAD-HP target (w.o 38295-8) is
coated with TaC (previously prepared on Feb |
|
17
|
Wednesday, April 20, 2011, 16:42 |
John Wong | Empty | 38481-8 | HP-FEBIAD | Done | Sintering target oven coated with TaC | Wed Apr 20 16:39:46 2011: Target
oven was coated with TaC early today.
The target was allowed to dry and then wrapped |
|
20
|
Wednesday, May 11, 2011, 16:23 |
John Wong | SiC | 38481-8 | HP-FEBIAD | Problems | Organics burnoff & Sintering | Wed May 11 16:20:21 2011: The HP-FEBIAD
(w.o#38481-8) was filled with SiC (8.5mm,
555 discs). The target is wrapped with |
9x |
22
|
Wednesday, May 18, 2011, 13:13 |
John Wong | SiC | 38295-8 | HP-FEBIAD | Problems | Organics burnoff & Sintering | Wed May 18 13:12:24 2011: Target
is wrapped with 3 Ta-heat shields and is
installed in the evaporator which is being |
6x |
36
|
Friday, September 09, 2011, 10:05 |
John Wong | Empty | | HP-FEBIAD | Done | Sintering TaC coating | Friday, September 09, 2011, 10:05
Target oven coated with TaC, and
wrapped with 3-Ta heat shields. Chamber |
|
38
|
Tuesday, September 13, 2011, 16:53 |
John Wong | SiC | 38295-9 | HP-FEBIAD | Done | Ready | Tuesday, September 13, 2011, 16:51
Target is wrapped with 3-Ta heat
shields. |
9x |
1
|
Wednesday, March 23, 2011, 18:23 |
John Wong | | | | | Diffusion Bonding of Ta Fins for FEBIAD HP-A (w.o#38481-4) | March 23, 2011
12:30: Target oven is wrapped with
3 Ta-heat shields. Pumping down evaporator |
|
2
|
Friday, March 25, 2011, 17:22 |
John Wong | | | | | Diffusion Bonding of Ta Fins for FEBIAD HP-A (w.o#38481-4) |
|
|
5
|
Tuesday, March 29, 2011, 10:20 |
| | | | Problems | Loss of cooling water | According to Jonathan Aoki, the electricians
will be servicing another MCC which will
result in loss of cooling water for about |
|
6
|
Tuesday, March 29, 2011, 10:30 |
| | | | Done | Loss of cooling water update | It's the NON-ACTIVE water that will go
off. The evaporator is on sity water,
so it will be OK. |
|
21
|
Tuesday, May 17, 2011, 16:43 |
John Wong | | | | Maintenance | Evaporator Ion gauge replaced | The evaporator ion gauge filament burnt
out on May 11, 2011. A target was in
the evaporator at that time and was about |
|
33
|
Wednesday, September 07, 2011, 13:33 |
John Wong | Empty | | | Maintenance | Changed Evaporator#1 Backing Pump oil | Wednesday, September 07, 2011, 11:18:
IEVAP:CG2 @ 52mT before oil change.
Edi D.V changed the oil for the backing |
|
35
|
Wednesday, September 07, 2011, 15:40 |
Anders Mjos | Empty | | | Maintenance | Re-sealing of Glove Box | 2011-09-01:
Glove box was leaking
(air/argon) between base and box. Light was |
|
37
|
Monday, September 12, 2011, 13:08 |
John Wong | Empty | Target Boat | | Done | Sintering TaC coating on End Caps | Monday, September 12, 2011, 13:07
Target boat is loaded with coated
TaC end caps for sintering. Target |
|
41
|
Thursday, September 29, 2011, 10:58 |
John Wong | UO2/C | UCx-heatboat#2 | | Done | UCx#3: Batch#1 - UO2/C mixture of carbonization | Thursday, September 29, 2011, 10:54
UO2/C mixture was made on Tuesday
Sept 27, casted on a piece of glass and let |