Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_1, Page 10 of 15  Not logged in ELOG logo
ID Date Author Target Materialdown Target Oven W.O# Source Status Subject Text Attachments
  217   Tuesday, September 04, 2018, 10:18 Marla CervantesUC241369-2 In progressUCx Fully loaded graphite insert thermal test - FL#1.2 Monday, September 03, 2018, 10:17
Graphite insert fully loaded
 180904-UCxFL1-T2-2.png 
  218   Friday, September 21, 2018, 10:22 Anders MjosUC241369-2 DoneUCx Fully loaded graphite insert thermal test - FL#1.2


   
        
            
  
  220   Saturday, September 29, 2018, 20:53 John WongUC241369-2 DoneUCx Fully loaded graphite insert thermal test - FL#1.2

    

       
            
  
  221   Thursday, October 11, 2018, 18:13 John WongUC2 LP-SISIn progressConditioning UCx#25Thursday, October 11, 2018, 18:06
Target consists of 284 UCx discs,
total packing length of 8.0 cm. 
 UC#25_conditioning.JPGUC#25_conditioning-450A.JPG 
  223   Tuesday, October 23, 2018, 10:24 Marla CervantesUC2 LP-SISProblemsConditioning UCx#25

    

       
            
  
  224   Tuesday, October 23, 2018, 10:49 Marla CervantesUC2 LP-SISProblems resolvedConditioning UCx#25

    

       
            
  
  225   Tuesday, October 23, 2018, 10:55 Marla CervantesUC2 LP-SISDoneConditioning UCx#25

    

       
            
 OrangeCoat.jpgIonizerTube.jpgClosedSide.jpg 
  228   Tuesday, October 30, 2018, 10:17 Marla CervantesUC243044-7 LP-SISIn progressUCx Fully loaded graphite insert thermal test - FL#1 Tuesday, October 30, 2018, 10:12
A new LP-SIS was coated and syntered
(e-log 420 Evaporator_2) 
 Heat_test.JPG 
  229   Wednesday, October 31, 2018, 10:30 Marla CervantesUC243044-7 LP-SISProblemsUCx Fully loaded graphite insert thermal test - FL#1

    

       
            
 current-trip_off.JPGepics.JPG 
  230   Wednesday, October 31, 2018, 15:23 Marla CervantesUC243044-7 LP-SISDoneUCx Fully loaded graphite insert thermal test - FL#1

    

       
            
 Ta-container.png 
  241   Wednesday, September 18, 2019, 09:57 Marla CervantesUC244062-4LP-SISDoneUCx28 Conditioning #1Wednesday, September 18, 2019, 07:48
A TaC coated target container 
was loaded with a graphite cartridge with
  
  242   Tuesday, September 24, 2019, 06:53 Marla CervantesUC244062-4LP-SISDoneUCx28 Conditioning #2 Tuesday, September 24, 2019, 06:52
The target UCx28 that was previously
  
  243   Wednesday, September 25, 2019, 14:00 Marla CervantesUC244062-4LP-SISDoneUCx28 Conditioning #3Wednesday, September 25, 2019, 14:00 
The target UCx28 that
  
  244   Friday, September 27, 2019, 18:04 Marla CervantesUC244062-4LP-SISDoneUCx28 Conditioning #4Friday, September 27, 2019, 18:03
The target UCx28 that
 IMG_1393.JPG 
  245   Wednesday, October 02, 2019, 11:07 Marla CervantesUC244062-4LP-SISDoneUCx28 Conditioning #5Monday, September 30, 2019, 10:54 
After being exposed to air for 1.5
hours,
  
  247   Tuesday, October 08, 2019, 09:53 Marla CervantesUC244062-6LP-SISDoneUCx29 ConditioningMonday, October 07, 2019, 09:51 
A TaC coated target
  
  251   Wednesday, November 06, 2019, 11:48 Marla CervantesUC244062-3 LP-SISDoneUCx#30 Conditioning Tuesday, November 05, 2019, 16:43
A TaC coated target container 
  
  271   Saturday, June 05, 2021, 09:14 Marla CervantesUC2 TARGET BOATIn progressUCx#33 Conditioning Saturday, June 05, 2021, 08:57
Target #33 was installed in
  
  274   Wednesday, September 15, 2021, 07:19 Marla CervantesUC2 TARGET BOATDoneConditioning 2sc samplesWednesday, September 14, 2021, 21:14
Boat is wrapped with 2 layers
  
  279   Wednesday, April 13, 2022, 10:55 Luca EgoritiUC2 P2N-SISDoneP2N carbothermal reduction P2Ncartridge-220323Wednesday, April 13, 2022, 10:50
P2NC-220323
Preparing the P2N-UCx for online
  
ELOG V2.9.2-2455