20
|
Wednesday, May 11, 2011, 16:23 |
John Wong | SiC | 38481-8 | HP-FEBIAD | Problems | Organics burnoff & Sintering | Wed May 11 16:20:21 2011: The HP-FEBIAD
(w.o#38481-8) was filled with SiC (8.5mm,
555 discs). The target is wrapped with |
9x |
|
21
|
Tuesday, May 17, 2011, 16:43 |
John Wong | | | | Maintenance | Evaporator Ion gauge replaced | The evaporator ion gauge filament burnt
out on May 11, 2011. A target was in
the evaporator at that time and was about |
|
|
22
|
Wednesday, May 18, 2011, 13:13 |
John Wong | SiC | 38295-8 | HP-FEBIAD | Problems | Organics burnoff & Sintering | Wed May 18 13:12:24 2011: Target
is wrapped with 3 Ta-heat shields and is
installed in the evaporator which is being |
6x |
|
23
|
Wednesday, May 25, 2011, 14:42 |
John Wong | UO2/C | UCx-heatboat#1 | LP-SIS | Done | Batch#1: UO2/C mixing & carbonization | Before began the carbonization process,
two cameras were setup in the hotlab for
monitoring the evaporator and the power supply. |
|
|
24
|
Thursday, June 30, 2011, 12:42 |
John Wong | UO2/C | UCx-heatboat#1 | LP-SIS | Done | Batch#2: UO2/C for carbonization | Before began the
carbonization process, two cameras were setup |
|
|
25
|
Monday, July 18, 2011, 15:55 |
John Wong | Empty | 38634-3 | LP-SIS | Done | Sintering TaC coating for UCx#2 | Monday, July 18, 2011, 15:53: Target
oven was coated with TaC and let dry over
the weekend. The target is now installed |
|
|
26
|
Wednesday, July 27, 2011, 13:02 |
John Wong | UC2 | 38634-3 | LP-SIS | Problems | UCx#2 conditioning | Wednesday, July 27, 2011, 12:58:
Target length = 11.2cm
Total UC2/C foils = 245 discs |
|
|
27
|
Wednesday, August 03, 2011, 17:16 |
John Wong | Empty | 38634-8 | LP-SIS | Done | Sintering TaC coating | Wednesday, August 03, 2011, 20:27 : Target
was wrapped with 3 new Ta-heat shields and
2 around the back block. The tar from |
|
|
28
|
Thursday, August 04, 2011, 17:46 |
John Wong | UC2 | 38634-8 | LP-SIS | Problems resolved | Repacking UCx in new target oven | Thursday, August 04, 2011, 17:44:
All the UCx material from target oven 38634-3
was recovered and repacked in this new oven. |
|
|
29
|
Monday, August 29, 2011, 11:21 |
John Wong | Empty | 38634-6 | LP-SIS | Done | Sintering TaC coating oven for TaC#1 | Monday, August 29, 2011, 13:16: Target
oven was coated with TaC and let dry over
night. The target oven is in the evaporator |
|
|
31
|
Tuesday, August 30, 2011, 16:30 |
John Wong | Empty | Target Boat | LP-SIS | Done | Sintering of End Caps |
|
|
|
32
|
Tuesday, September 06, 2011, 17:05 |
John Wong | Empty | 38634-6 | LP-SIS | Done | Sintering TaC coating oven for TaC#1 |
|
|
|
33
|
Wednesday, September 07, 2011, 13:33 |
John Wong | Empty | | | Maintenance | Changed Evaporator#1 Backing Pump oil | Wednesday, September 07, 2011, 11:18:
IEVAP:CG2 @ 52mT before oil change.
Edi D.V changed the oil for the backing |
|
|
34
|
Wednesday, September 07, 2011, 13:41 |
John Wong | TaC | 38634-6 | LP-SIS | Done | TaC#1: Sintering and Organics burn-off | Wednesday, September 07, 2011, 15:31
125 discs of TaC/C
Total discs mass = 125 |
|
|
36
|
Friday, September 09, 2011, 10:05 |
John Wong | Empty | | HP-FEBIAD | Done | Sintering TaC coating | Friday, September 09, 2011, 10:05
Target oven coated with TaC, and
wrapped with 3-Ta heat shields. Chamber |
|
|
37
|
Monday, September 12, 2011, 13:08 |
John Wong | Empty | Target Boat | | Done | Sintering TaC coating on End Caps | Monday, September 12, 2011, 13:07
Target boat is loaded with coated
TaC end caps for sintering. Target |
|
|
38
|
Tuesday, September 13, 2011, 16:53 |
John Wong | SiC | 38295-9 | HP-FEBIAD | Done | Ready | Tuesday, September 13, 2011, 16:51
Target is wrapped with 3-Ta heat
shields. |
9x |
|
39
|
Wednesday, September 21, 2011, 13:23 |
John Wong | Empty | 38634-10 | LP-SIS | Done | Sintering TaC coating on target oven for UCx#3 | Wednesday, September 21, 2011, 13:23
Target oven was wrapped with 3-Ta
heatshields including the back block. |
|
|
40
|
Thursday, September 22, 2011, 20:34 |
John Wong | Empty | 38634-9 | LP-SIS | Done | Sintering TaC coating for UCx#2 (spare) | Thursday, September 22, 2011, 20:21
Target oven was wrapped with 3 Ta-heat
shields and has been pumping down. |
|
|
41
|
Thursday, September 29, 2011, 10:58 |
John Wong | UO2/C | UCx-heatboat#2 | | Done | UCx#3: Batch#1 - UO2/C mixture of carbonization | Thursday, September 29, 2011, 10:54
UO2/C mixture was made on Tuesday
Sept 27, casted on a piece of glass and let |
6x |