ID |
Date |
Author |
Target Material |
Target Oven W.O# |
Source |
Status |
Subject |
294
|
Thursday, September 19, 2024, 22:48 |
Darwin Ortiz Rosales | UO2/C | conditioning oven#3 | LP TUBE | Done | UCx240917 reduction | Thursday, September 19, 2024, 22:44
Cartridge #21 loaded with 211 discs including 3 analysis discs
To be reduced inside a Ta container tube. Tube wrapped in 3 Ta foil heatshields.
Reduction for 4 hours and then 8 hours @ 450A
Good Vacuum: 5.0e-04 Torr
Bad Vacuum: 5.0e-02 Torr
Initial pressure is 1.6 e-06 Torr
Friday, September 20, 2024, 08:47
ramped to 300 A and allowed pressure to drop. Pressure stable around 5.0 e-5 Torr. Will continue ramp at 2A/min
Friday, September 20, 2024, 12:30
At 500A the pressure stops rising. Will leave for 4 hours.
Tuesday, September 24, 2024, 15:46
reduced for 4 hours then ramped down to 450A at -2A/min
After 8 hours ramped down to zero A at -2A/min |
295
|
Tuesday, January 14, 2025, 16:28 |
Darwin Ortiz Rosales | UO2/C | conditioning oven#3 | LP TUBE | In progress | UCx250113 reduction | Tuesday, January 14, 2025, 16:26
Cartridge #22 loaded with 211 discs including 3 analysis discs
To be reduced inside a Ta container tube. Tube wrapped in 3 Ta foil heatshields.
Reduction for 4 hours and then 8 hours @ 450A (see docushare 177267)
Good Vacuum: 5.0e-04 Torr
Bad Vacuum: 5.0e-02 Torr
Initial pressure is 1.6 e-06 Torr
Tuesday, January 14, 2025, 16:27
Left system to pump down earlier in the day.
Wednesday, January 15, 2025, 10:23
Earlier started initial ramp to 60A at 2A/min
Initial pressure IGP1 was 2.65e-06 Torr
Pressure stable now at 2.40e-5 Torr
Starting ramp to 90 A at 1A/min |
41
|
Thursday, September 29, 2011, 10:58 |
John Wong | UO2/C | UCx-heatboat#2 | | Done | UCx#3: Batch#1 - UO2/C mixture of carbonization | Thursday, September 29, 2011, 10:54
UO2/C mixture was made on Tuesday Sept 27, casted on a piece of glass and let dried in the fume hood for ~2days.
Dried UO2/C mass = 61.72g
Target material is wrapped /w graphite sheet and put on a new heatboat coated/sintered /w TaC.
Heat boat is wrapped with 3-Ta heat shields.
Evaporator chamber is currently being pumped down.
Friday, September 30, 2011, 10:01
Evaporator has been pumped down over night, IG currently @ 2.92e-6 Torr, BP @ 27mT.
TGHT will be stepped up to 40A and allow the pressure to slowly increase.
Friday, September 30, 2011, 10:30
TGHT is holding at 40A/0.139V (local @ 37A), and pressure is slowly increasing, expect pressure to stabilize at ~4.5e-5 Torr before being auto-heating.
See attachment#1: TGHT_40A.
Friday, September 30, 2011, 13:39
TGHT has been at 40A for more than 3 hrs. Pressure went as high as 6.9e-5 Torr and it's now coming down. (See attachment#2: TGHT@40A_3hrs)
Auto-heating is initiating. TGHT rate @ 0.1A/min to reach to max current of 525A. (see attachment#3: parameter.jpg)
Sunday, October 09, 2011, 10:44
Target heater reached to 520A and held for a few hours.
Evaporator was cooled down last night and TGHT is now at 0A.
(For the overall process, see Attachment#4: UCx#3_batch1.jpg)
IG1 @ 5.7e-7 Torr. Chamber will be vented with Ar on Tuesday.
TGHT is off and water valve is shut.
Tuesday, October 11, 2011, 13:10
Evaporator glovebox was purged with Ar prior to venting the chamber with Ar.
Layers of burnout marks were coated all around the inside of the evaporator (see attachment#5. Evpr_afterprocess.jpg),
Before cleaning, the evaporator chamber had ~200,000 cpm.
The heating boat containing UCx was removed from the evaporator and stored in the "orange" case, then transferred to the Ar-glove box.
Weight of UCx flasks: 47.15g (See attachment#6: UCx#3_batch1_mass.jpg)
The evaporator was thoroughly cleaned; the burnout marks were removed, and it will be used for UCx#3:batch#2 - UO2/C process.
|
Attachment 1: TGHT_40A.jpg
|
|
Attachment 2: TGHT@40A_3hrs.jpg
|
|
Attachment 3: parameter.jpg
|
|
Attachment 4: UCx#3_batch1.jpg
|
|
Attachment 5: Evpr_afterprocess.jpg
|
|
Attachment 6: UCx#3_batch1_mass.jpg
|
|
42
|
Thursday, October 06, 2011, 12:22 |
John Wong | UO2/C | UCx-heatboat#2 | | Done | UCx#3: Batch#2 - UO2/C mixture of carbonization | Thursday, October 06, 2011, 12:19
UO2/C mixture was made on Oct 4 and casted on a piece of glass costed with WD40, and let dried in the fume hood for 2days.
Dried UO2/C mass = 64.95g
The batch is wrapped with a piece of graphite sheet and waiting to be heated in the evaporator.
Currently, batch#1 is in the evaporator.
Wednesday, October 12, 2011, 10:52
UO2/C mixture was loaded on a heatboat and wrapped with 3-Ta heat shields.
Evaporator has been pumped down overnight, IG currently at 1.57e-6 Torr.
TGHT will be stepped up to 40A.
Wednesday, October 12, 2011, 11:00
TGHT @ 40A/0.128V, local @ 37A. IG @ 1.7e-6 Torr.
Wednesday, October 12, 2011, 12:35
TGHT tripped off @ 40A due to high vacuum (>8E-5 Torr). See attachment#1
Vacuum has come down to 8.5e-6 Torr.
Stepped up TGHT to 35A.
Wednesday, October 12, 2011, 15:19
TGHT was held at 35A for 2.5 hrs. IG @ 4.5e-5 Torr.
Initiated auto heating @ 0.1A/min, Max current @ 525A.
Thursday, October 20, 2011, 16:15
Vacuum suddenly increased to ~ 7.7e-5 Torr when TGHT @ 317A (see attachment#2). There could be a shift in the material during the thermal reduction,
and caused a sudden spike in vacuum.
Currently, IG @ 5.2e-5 Torr, TGHT @ 316.7A.
TGHT reached to 525A and held for >4hrs before cooling down (see attachment#3)
UCx was removed from the evaporator and transferred to the Ar-glove box.
The material looks great!
|
Attachment 1: UCx#3_batch#2_tripped@40A.jpg
|
|
Attachment 2: UCx#3_batch#2_TGHT@317A.JPG
|
|
Attachment 3: UO2_C_batch#2_Archive_overall_process.JPG
|
|
49
|
Wednesday, June 06, 2012, 16:58 |
John Wong | UO2/C | UCx-heatboat#2 | | Done | UC2 flakes for UCx#4: batch#01-04062012 | Wednesday, June 06, 2012, 16:55
The UO2/C green was prepared on June 04, 2012.
UO2 powder used = 50.26g
C-grv used = 10.14g.
Dry UO2/C green mass = 61.71g.
The green was rolled and wrapped in a piece of graphite sheet.
The target boat was wrapped with 3 Ta-heat shield and installed in the Evap#1.
The chamber is currently being pumped down.
Tuesday, June 12, 2012, 11:42
Currently, IEVAPIG1= 1.83e-6 Torr, IEVAP:CG2= 48 mTorr.
Backing line pressure is slightly high. Will get Edi to look into this.
Tuesday, June 12, 2012, 14:38
The backing pump oil was changed (ISAC WP#2012-06-12-1). IEVAP:CG2 is currently reading 27mTorr and IEVAPIG1 at 1.66e-6 Torr.
Tuesday, June 12, 2012, 16:06
TGHT was tabbed up to 50A and stayed for 1.5 hrs. Not much change in the pressure, currently at 1.8e-6 Torr, BP @ 25mTorr.
Keep stepping up TGHT current...
Tuesday, June 12, 2012, 16:37
TGHT at 65A. Pressure is starting to rise.
Tuesday, June 12, 2012, 16:46
Pressure at 6.8e-6 Torr and going up slowly.
Initiated TGHT auto-ramping:
Max current = 525A, rate @ 0.1A/min (see attachment #1)
Wednesday, June 13, 2012, 13:22
TGHT has almost reached to 80A. Pressure is limiting at 4.5e-6 Torr. (see attachment#2)
Thursday, June 14, 2012, 17:11
TGHT has reached to 95.40A, local @ 92A & 0.48V. Pressure is still limiting at 4e-6 Torr. (see attachment #3)
The TGHT current can not go up above 232A because it's voltage limiting at 1.953V (see attachment#4). The carbon thermal-reduction process stops and the vacuum is going down to low 10e-6 Torr.
The voltage can not be increased on EPICS; it has to be adjusted locally.
Auto-ramping aborted.
The TGHT current setpoint was lowered down to 228A.
Sunday, June 17, 2012, 12:03
Asked ISAC Ops (Ed Parton) to help me increase the voltage locally. The voltage nob was turned 1/4 clockwise, and the current was tapped up from 228 to 231A, and it was responding. The voltage nob was further turned to 3/4 clockwise.
Initiated auto-ramping.
Currently, TGHT setpoint at 234.90A, local 231A/1.95V.
Vacuum is responding and it's slowly going up (currently at 2.8e-6 Torr) - The carbon thermal reduction process continues...
Monday, June 18, 2012, 00:20
TGHT is going up slowly, currently at 285A. The pressure is limiting as the carbonization process is under way (see attachment 5).
Monday, June 25, 2012, 16:00
The EPICS control was down on Sunday night. So the auto-ramping was aborted.
Control group fixed the problem, and the network is back online.
The auto-ramping has been re-initiated.
TGHT is currently at 314.70A, local at 311/3.04V. IG at 4.21e-5 Torr, BP at 15mTorr.
Saturday, June 30, 2012, 23:08
The carbonization process has finished.
TGHT has reached to 520A and maintained at that current for about 5hrs. (see attachment #6).
Initiated auto-cool down.
Tuesday, July 03, 2012, 13:05
TGHT is now at 0A. The carbonization process is done.
It took over 20 days for this process (see attachment #7), due to some control issues & power supply problem. Also the vacuum limit was set to 4.0e-5 Torrr; that might increase the pumping time.
Next time, try setting the pressure limit to 5.0e-5 Torr.
The chamber will be vented with Ar, and the UC2 flakes will be transferred to the Ar-glove box.
|
Attachment 1: autoheating.GIF
|
|
Attachment 2: TGHT_80A.GIF
|
|
Attachment 3: TGHT_95A.GIF
|
|
Attachment 4: vol_limiting.png
|
|
Attachment 5: TGHT_285A.png
|
|
Attachment 6: TGHT_520A_max.png
|
|
Attachment 7: TGHT_0-520A.png
|
|
50
|
Monday, June 11, 2012, 10:48 |
John Wong | UO2/C | UCx-heatboat#2 | | Problems | UC2 flakes - batch#01-04062012: broken seal & TGHT power supply |
John Wong wrote: |
Wednesday, June 06, 2012, 16:55
The UO2/C green was prepared on June 04, 2012.
UO2 powder used = 50.26g
C-grv used = 10.14g.
Dry UO2/C green mass = 61.71g.
The green was rolled and wrapped in a piece of graphite sheet.
The target boat was wrapped with 3 Ta-heat shield and installed in the Evap#1.
The chamber is currently being pumped down.
|
Monday, June 11, 2012, 10:31
Last week during the pump down of the chamber (vacuum got down to low 10e-5 Torr), the cooling was open in preparation of turning on the target heater. A vacuum excursion was triggered (pressure went up to 300mTorr), and the system was tripped off. It was suspected that there was some leaks.
A leak test was performed - all the water connecters & joints are fine. The seal for the chamber lid was found leaky (5e-8 atm cc/sec). The seal was replaced and the vacuum was improved but no perfect.
The chamber has been pumped down over the weekend, pressure currently at 2.3e-6 Torr.
Coincidentally, the TGHT power supply is broken. The initial action was to turn on the power supply at 0A when the chamber vacuum had gone down to 10-6 Torr. But the power supply did not regular and shot up to 1000A and caused a vacuum excursion. Ray Dube will replaced it.
|
51
|
Tuesday, June 12, 2012, 11:38 |
John Wong | UO2/C | UCx-heatboat#2 | | Problems resolved | UC2 flakes - batch#01-04062012: broken seal & TGHT power supply |
John Wong wrote: |
John Wong wrote: |
Wednesday, June 06, 2012, 16:55
The UO2/C green was prepared on June 04, 2012.
UO2 powder used = 50.26g
C-grv used = 10.14g.
Dry UO2/C green mass = 61.71g.
The green was rolled and wrapped in a piece of graphite sheet.
The target boat was wrapped with 3 Ta-heat shield and installed in the Evap#1.
The chamber is currently being pumped down.
|
Monday, June 11, 2012, 10:31
Last week during the pump down of the chamber (vacuum got down to low 10e-5 Torr), the cooling was open in preparation of turning on the target heater. A vacuum excursion was triggered (pressure went up to 300mTorr), and the system was tripped off. It was suspected that there was some leaks.
A leak test was performed - all the water connecters & joints are fine. The seal for the chamber lid was found leaky (5e-8 atm cc/sec). The seal was replaced and the vacuum was improved but no perfect.
The chamber has been pumped down over the weekend, pressure currently at 2.3e-6 Torr.
Coincidentally, the TGHT power supply is broken. The initial action was to turn on the power supply at 0A when the chamber vacuum had gone down to 10-6 Torr. But the power supply did not regular and shot up to 1000A and caused a vacuum excursion. Ray Dube will replaced it.
|
Tuesday, June 12, 2012, 11:37
Ray Dube repaired the TGHT power supply. It is now operational.
|
53
|
Sunday, June 24, 2012, 22:52 |
John Wong | UO2/C | UCx-heatboat#2 | | Problems | UC2 flakes - batch#01-04062012: IOC problems |
John Wong wrote: |
Wednesday, June 06, 2012, 16:55
The UO2/C green was prepared on June 04, 2012.
UO2 powder used = 50.26g
C-grv used = 10.14g.
Dry UO2/C green mass = 61.71g.
The green was rolled and wrapped in a piece of graphite sheet.
The target boat was wrapped with 3 Ta-heat shield and installed in the Evap#1.
The chamber is currently being pumped down.
Tuesday, June 12, 2012, 11:42
Currently, IEVAPIG1= 1.83e-6 Torr, IEVAP:CG2= 48 mTorr.
Backing line pressure is slightly high. Will get Edi to look into this.
Tuesday, June 12, 2012, 14:38
The backing pump oil was changed (ISAC WP#2012-06-12-1). IEVAP:CG2 is currently reading 27mTorr and IEVAPIG1 at 1.66e-6 Torr.
Tuesday, June 12, 2012, 16:06
TGHT was tabbed up to 50A and stayed for 1.5 hrs. Not much change in the pressure, currently at 1.8e-6 Torr, BP @ 25mTorr.
Keep stepping up TGHT current...
Tuesday, June 12, 2012, 16:37
TGHT at 65A. Pressure is starting to rise.
Tuesday, June 12, 2012, 16:46
Pressure at 6.8e-6 Torr and going up slowly.
Initiated TGHT auto-ramping:
Max current = 525A, rate @ 0.1A/min (see attachment #1)
Wednesday, June 13, 2012, 13:22
TGHT has almost reached to 80A. Pressure is limiting at 4.5e-6 Torr. (see attachment#2)
Thursday, June 14, 2012, 17:11
TGHT has reached to 95.40A, local @ 92A & 0.48V. Pressure is still limiting at 4e-6 Torr. (see attachment #3)
The TGHT current can not go up above 232A because it's voltage limiting at 1.953V (see attachment#4). The carbon thermal-reduction process stops and the vacuum is going down to low 10e-6 Torr.
The voltage can not be increased on EPICS; it has to be adjusted locally.
Auto-ramping aborted.
The TGHT current setpoint was lowered down to 228A.
Sunday, June 17, 2012, 12:03
Asked ISAC Ops (Ed Parton) to help me increase the voltage locally. The voltage nob was turned 1/4 clockwise, and the current was tapped up from 228 to 231A, and it was responding. The voltage nob was further turned to 3/4 clockwise.
Initiated auto-ramping.
Currently, TGHT setpoint at 234.90A, local 231A/1.95V.
Vacuum is responding and it's slowly going up (currently at 2.8e-6 Torr) - The carbon thermal reduction process continues...
Monday, June 18, 2012, 00:20
TGHT is going up slowly, currently at 285A. The pressure is limiting as the carbonization process is under way (see attachment 5).
|
Sunday, June 24, 2012, 22:51
The Evaporator IOC has lost communication (see attachment #6). The TGHT auto ramping was not responding to the vacuum limit and kept ramping up, so the program had to be aborted.
On the live camera, it showed that TGHT stopped at 311A/3.02V and the pressure was at 5.05e-5 Torr.
An email has sent to Controls and hopefully things get resolved on Monday.
|
Attachment 1: IOC_problem.png
|
|
54
|
Monday, June 25, 2012, 16:00 |
John Wong | UO2/C | UCx-heatboat#2 | | Problems resolved | UC2 flakes - batch#01-04062012: Fiber converters failed |
John Wong wrote: |
John Wong wrote: |
Wednesday, June 06, 2012, 16:55
The UO2/C green was prepared on June 04, 2012.
UO2 powder used = 50.26g
C-grv used = 10.14g.
Dry UO2/C green mass = 61.71g.
The green was rolled and wrapped in a piece of graphite sheet.
The target boat was wrapped with 3 Ta-heat shield and installed in the Evap#1.
The chamber is currently being pumped down.
Tuesday, June 12, 2012, 11:42
Currently, IEVAPIG1= 1.83e-6 Torr, IEVAP:CG2= 48 mTorr.
Backing line pressure is slightly high. Will get Edi to look into this.
Tuesday, June 12, 2012, 14:38
The backing pump oil was changed (ISAC WP#2012-06-12-1). IEVAP:CG2 is currently reading 27mTorr and IEVAPIG1 at 1.66e-6 Torr.
Tuesday, June 12, 2012, 16:06
TGHT was tabbed up to 50A and stayed for 1.5 hrs. Not much change in the pressure, currently at 1.8e-6 Torr, BP @ 25mTorr.
Keep stepping up TGHT current...
Tuesday, June 12, 2012, 16:37
TGHT at 65A. Pressure is starting to rise.
Tuesday, June 12, 2012, 16:46
Pressure at 6.8e-6 Torr and going up slowly.
Initiated TGHT auto-ramping:
Max current = 525A, rate @ 0.1A/min (see attachment #1)
Wednesday, June 13, 2012, 13:22
TGHT has almost reached to 80A. Pressure is limiting at 4.5e-6 Torr. (see attachment#2)
Thursday, June 14, 2012, 17:11
TGHT has reached to 95.40A, local @ 92A & 0.48V. Pressure is still limiting at 4e-6 Torr. (see attachment #3)
The TGHT current can not go up above 232A because it's voltage limiting at 1.953V (see attachment#4). The carbon thermal-reduction process stops and the vacuum is going down to low 10e-6 Torr.
The voltage can not be increased on EPICS; it has to be adjusted locally.
Auto-ramping aborted.
The TGHT current setpoint was lowered down to 228A.
Sunday, June 17, 2012, 12:03
Asked ISAC Ops (Ed Parton) to help me increase the voltage locally. The voltage nob was turned 1/4 clockwise, and the current was tapped up from 228 to 231A, and it was responding. The voltage nob was further turned to 3/4 clockwise.
Initiated auto-ramping.
Currently, TGHT setpoint at 234.90A, local 231A/1.95V.
Vacuum is responding and it's slowly going up (currently at 2.8e-6 Torr) - The carbon thermal reduction process continues...
Monday, June 18, 2012, 00:20
TGHT is going up slowly, currently at 285A. The pressure is limiting as the carbonization process is under way (see attachment 5).
|
Sunday, June 24, 2012, 22:51
The Evaporator IOC has lost communication (see attachment #6). The TGHT auto ramping was not responding to the vacuum limit and kept ramping up, so the program had to be aborted.
On the live camera, it showed that TGHT stopped at 311A/3.02V and the pressure was at 5.05e-5 Torr.
An email has sent to Controls and hopefully things get resolved on Monday.
|
Monday, June 25, 2012, 15:57
The Control Support group investigated the problem and found out that the fiber converters on both ends failed. They have been replaced with brand new switches with fiber connections.
The Evap EPICS is back online.
|
23
|
Wednesday, May 25, 2011, 14:42 |
John Wong | UO2/C | UCx-heatboat#1 | LP-SIS | Done | Batch#1: UO2/C mixing & carbonization | Before began the carbonization process, two cameras were setup in the hotlab for monitoring the evaporator and the power supply. On duty ISAC Ops also helps to monitor on a regular basis and to grab the striptools + cameras (twice/shift) and put this information in the ISAC Logbook with subject header: "UCx_2011_A 'date time'", for easy search.
Wed May 25 14:39:31 2011: UO2/C cast was dried in the fumehood over the weekend. The cast was pilled off from the coated WD40 glass plate, rolled up and put in a target heating boat (/w TaC coating & sintered). The boat was wrapped with 3 Ta-heat shields, then installed in the evaporator which is currently being pumped down.
Thu May 26 11:40:06 2011: Vac @ 1.75e-6 torr, BP @ 0.032T. TGHT stepped up to 30A/0.092V (panel @ 27A), ; TGHT has been held for over 10 mins, no change in vacuum yet.
Thu May 26 11:46:48 2011: TGHT @ 40A/0.123V (panel @ 37A), Vac 2.3e-6 Torr, BP@0.032T.
Thu May 26 15:13:19 2011: TGHT has been at 40A/0.123V for sometime. Currently, Vac @ 4.39e-5 Torr, BP@ 0.27T. (See Attachement#1)
Thu May 26 17:28:36 2011: Auto ramping has begun. (see attachment#2). TGHT @ 40.60A, (panel @ 38A), vac @ 3.84 e-5 Torr.
Wed Jun 1 13:28:58 2011: TGHT currently at 395A/3.16V, vac @ 4.47e-5 Torr. Heating sequence changed for the increment from 4.5e-5 Torr to 5.0e-5 Torr.
Fri Jun 3 09:54:28 2011 : The organics burnoff and the carbonization process are complete (see Attachment#3 for the striptool). The cooling process will begin at a rate of 2A/min.
Tue Jun 14 21:24:41 2011 : The evaporator was about to be vented by argon on Jun 10 (Fri), but it was found that the argon cylinder was almost empty; a new one was replaced (see Attachment #4: Evaporator_Ar_flow). After the argon cylinder was replaced, the evaporator was purged with the gas and the vent valve was connected to the cylinder for venting of the evaporator. The target oven was removed and stored in the hermetic transfer vessel, then transferred to the glove box. (See attachment #5: UC2, Note: typo. Should read Ar gas, NOT N2). The flakes were stored in the jar labelled "Stock# 2011_A", with total weight of 35g. |
Attachment 1: Screen_shot_2011-05-26_at_3.14.00_PM.png
|
|
Attachment 2: auto_ramping.png
|
|
Attachment 3: UCx_2011_A_carbonization.png
|
|
Attachment 4: Evaporator_Ar_flow.png
|
|
Attachment 5: UC2.png
|
|
24
|
Thursday, June 30, 2011, 12:42 |
John Wong | UO2/C | UCx-heatboat#1 | LP-SIS | Done | Batch#2: UO2/C for carbonization | Before began the carbonization process, two cameras were setup in the hotlab for monitoring the evaporator and the power supply. On duty ISAC Ops also helps to monitor on a regular basis and to grab the striptools + cameras (twice/shift) and put this information in the ISAC Logbook with subject header: "UCx_2011_B 'date time'", for easy search.
P/S camera: http://isaccamera1, user/pw = admin
Evaporator camera: http://isac-cam01, user =admin, pw=yield
Thu Jun 30 12:24:31 2011
UO2 used = 50.29g
Green UO2/C = 71.96g, rolled up /w graphite sheet (15cm x 12cm), and put in the target boat, then wrapped with 3 Ta-heat shields. The target is installed in the evaporator and is being pumped down.
Thu Jun 30 12:45:39 2011: Currently Vac @ 3.75e-5, CG2 @ 0.045T.
Friday, July 01, 2011, 13:28: Vac @ 2.2-6 Torr. TGHT set at 10A yesterday.
Friday, July 01, 2011, 13:42: TGHT stepped up to 36A (panel 33A), 0.134V. No change in vacuum, 2.38e-6 Torr, CG @33mT.
Friday, July 01, 2011, 13:51: TGHT stepped up to 50A (panel 47A), 0.194V. Vac @ 5.7e-6 Torr, CG2 @ 33mT.
Friday, July 01, 2011, 14:09 : Vac was rising slowly. TGHT stepped up to 57A and the pressure started to increase faster. TGHT was brought back down to 30A, and vac is coming down gradually. (See attachment 1#2: Startup Vac/Current)
Friday, July 01, 2011, 14:16 : Auto ramping began. 0.1/min, max currently @ 525A. (see attachement #3: Parameter)
Monday, July 04, 2011, 12:33: TGTH @ 146.20A, Vac @ 4.74e-5 Torr. (see attachment#4: 3-day trend). Increase auto ramping rate to 0.5/min.
Monday, July 04, 2011, 13:01: TGHT @ 148A, Vac @ 5.20e-5 torr. Auto rampiing paused until vacuum goes down to 5.0e-5 torr. (see attachment#4)
Monday, July 04, 2011, 17:34: TGHT @ 220A, VAC started to come down, indicating the burning off organics was done. Increased heating rate to 1A/min.
Friday, July 08, 2011, 21:30: As per Peter Kunz, "I started the target cooldown sequence for IEVAP:TGHT1 at 20:35. The pressure came down to 4e-6 torr. The ramp down rate is 2A/min. Please check if the target heater current comes down to 0A. Then it can cool off over the weekend."
Monday, July 11, 2011, 12:17: Evap glove box flashed with Ar gas, set pressure ~100psi. Chamber also vented with Ar, set pressure @ ~5psi.
|
Attachment 1: startup_vac.jpg
|
|
Attachment 2: startup_current.jpg
|
|
Attachment 3: parameter.jpg
|
|
Attachment 4: UCx_2011_b_3days.png
|
|
Attachment 5: grab.S13888.png
|
|
56
|
Thursday, July 19, 2012, 17:14 |
John Wong | UO2/C | Target boat #2 | | Done | Processing UC2 flakes for UCx#5 - (batch#02-13062012) | Thursday, July 19, 2012, 17:09
UO2/C green was prepared on June 13, 2012.
UO2 powder used = 50.32g (Inventory R-00835A UO2 + bottle = 946.48g left)
Graphite powder used = 10.00g
The green was rolled and wrapped in a piece of graphite sheet.
The target boat was wrapped with 3 Ta-heat shield and installed in the Evap#1.
The chamber is currently being pumped down.
Friday, July 20, 2012, 09:50
IG1 currently at 6.2e-6 Torr, BP @ 31mTorr.
The target will be ramped up to 520A at 0.1A/min.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
TGHT tabbed up to 50A. Not much of change in the vacuum.
Initiated autoramping..
Friday, July 20, 2012, 10:18
TGHT tripped up at 51A due to high vacuum.
Lowered TGHT to 30A and begin auto ramping. Pressure is holding at 7e-5 Torr.
Wednesday, July 25, 2012, 11:57
TGHT has reached to 100A, and the vacuum is starting to come down from the high limit, 5e-5 Torr. (see attachment#1).
The organic burn-off is almost to complete and the carbonization process will begin soon.
Tuesday, August 07, 2012, 12:18
The carbonization process is completed. The target heater reached to 520A (local 515A,5.17V), vacuum at 4.0 e-6 Torr. (see attachment #2)
Cooling down is in process at 2A/min.
Tuesday, August 07, 2012, 17:44
TGHT has reached to 0A. IG currently @ 1.3e-6 Torr, BP @ 34mTorr.
The chamber will be vented with Ar gas tomorrow and the UC2 flakes will be transfer to the Ar-glove box.
|
Attachment 1: TGHT_100A.png
|
|
Attachment 2: UC2_flakes_0-520A.GIF
|
|
63
|
Tuesday, April 02, 2013, 17:46 |
John Wong | UO2/C | Target boat #2 | | Done | Processing UC2 flakes for UCx#6 (batch#03 - 02042013) | Tuesday, April 02, 2013, 17:25
UO2/C green was prepared on Mar 11, 2013.
UO2 powder used = 50.32g (Inventory R-00835A UO2 + bottle = 896.16
Graphite powder used = 10.00g
The green was rolled and wrapped in a piece of graphite sheet
The target boat was wrapped with 3 -Ta heat shields and installed in the Evap#1.
The chamber is currently being pumped down.
The target will be ramped up to 520A at the rate of 0.1A/min.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
Wednesday, April 03, 2013, 11:28
IG1 currently at 3.56e-6 Torr, BP at 28mTorr.
Tabbing up TGHT to 50A.
After 20 mins, IG got up to 7.5e-5 torr (tripping at 8e-5 Torr). Lower TGHT to 20A.
Initiated autoramping...
Monday, April 15, 2013, 14:33
The domestic water will be shut off tomorrow, April 16 at 07:00 for ARIEL work. The evaporator cooling water will be shut off; therefore the process must stop for now.
TGHT is current at 315.5A, IG1 at 5.2e-5 Torr.
Cooling down at 1A/min.
Tuesday, April 16, 2013, 16:28
The cooling water is back online. The carbonization process will continue...
TGHT will be ramped up to 300A at 2A/min. Then the ramping rate will changed to 0.1A/min to have TGHT reach to 520A.
IG is currently at 1.2e-6 Torr.
Wednesday, April 17, 2013, 10:53
TGHT continues to ramp at 0.1A/min.
Sunday, April 21, 2013, 22:11
The synthesis of UC2 is complete.
Auto cooling is initiated. Ramping down at 1A/min.
The chamber will be vented with Ar tomorrow.
|
64
|
Monday, May 06, 2013, 14:34 |
John Wong | UO2/C | Target boat #2 | | Done | Processing UC2 flakes (batch#04 - 05032013) | Monday, May 06, 2013, 14:29
UO2/C green was prepared on May 2, 2013 and let dry over the weekend.
UO2 powder used = 50.36g (Inventory R-00835A UO2 + bottle = 896.30)
Graphite powder used = 10g
The green was rolled up and wrapped in a piece of graphite sheet.
The Ta-target boat was wrapped with 3-Ta heat shields and installed in the Evap#1
The chamber is currently being down down.
The target will be ramped up to 520A at the rate of 0.1A/min.
Vacuum limit stop at 5.0e-5 Torr, backing off at 6.0e-5 Torr.
Tuesday, May 07, 2013, 11:12
Currently, IG @ 5.6e-6 Torr; BP @ 25mTorr. Vacuum spikes intermittently...
Stepping up TGHT to 50A. After about 15 min, vacuum climbed up to 5.5e-5 Torr.
Lowered TGHT to 25A, and continue heating at that current...
Tuesday, May 07, 2013, 12:18
Vacuum is coming down to 2.6e-5 Torr.
Auto-heating initiated...
Friday, May 24, 2013, 14:19
The carbonization process has come the end.
TGHT has reached to 520A for ~14hrs.
IG1 @ 6.34e-6 Torr, BP @ 25mTorr.
Autocooling is initiated; ramping rate @ 1A/min.
The chamber will be remained under vacuum, and will be vented in Ar next week.
Monday, May 27, 2013, 14:11
The chamber was vented with Ar.
UC2 was transfered to the Ar glovebox.
Evap#1 is off.
Wednesday, May 29, 2013, 17:14
See attachment#1 for TGHT vs IG1 data retrieval.
|
Attachment 1: UC2_flakes_batch#04-05032013.PNG
|
|
68
|
Tuesday, June 25, 2013, 14:49 |
Laura Lambert | UO2/C | Target boat #2 | | Done | Processing UC2 flakes (batch#05 - 18062013) | Tuesday, June 25, 2013, 14:35
UO2/C green was prepared on June 18, 2013 and let dry over the weekend.
UO2 powder used = 50.25g (Inventory R-00835A UO2 + bottle = 845.94g - before use)
Graphite powder used = 10.0g
The green was rolled up and wrapped in a piece of graphite sheet.
The Ta-target boat was wrapped with a 3-Ta heat shields and installed in the Evap#1 on June 24, 2013
The chamber has been pumped down
IG1 currently at 4.6E-06 torr
Target will be ramped up to 520A at the rate of 0.1A/min
Vacuum limit stop at 5.0E-05 torr, backing off at 6.0E-05 torr
|
69
|
Tuesday, June 25, 2013, 16:28 |
John Wong | UO2/C | Target boat #2 | | Done | Processing UC2 flakes (batch#05 - 18062013) |
Laura Lambert wrote: |
Tuesday, June 25, 2013, 14:35
UO2/C green was prepared on June 18, 2013 and let dry over the weekend.
UO2 powder used = 50.25g (Inventory R-00835A UO2 + bottle = 845.94g - before use)
Graphite powder used = 10.0g
The green was rolled up and wrapped in a piece of graphite sheet.
The Ta-target boat was wrapped with a 3-Ta heat shields and installed in the Evap#1 on June 24, 2013
The chamber has been pumped down
IG1 currently at 4.6E-06 torr
Target will be ramped up to 520A at the rate of 0.1A/min
Vacuum limit stop at 5.0E-05 torr, backing off at 6.0E-05 torr
|
Tuesday, June 25, 2013, 16:26
TGHT was stepped up to 30A for about 1hr and lowered to 20A before the pressure went up t0 ~ 1.5e-5 Torr.
Auto ramping initiated...
|
70
|
Tuesday, July 02, 2013, 11:13 |
Peter Kunz | UO2/C | Target boat #2 | | Done | Processing UC2 flakes (batch#05 - 18062013) |
1. stage - burning off organics complete
2. stage - carbonization began 1-8 am 2013/07/02 |
Attachment 1: UO2-C-01.png
|
|
71
|
Thursday, July 11, 2013, 16:22 |
John Wong | UO2/C | Target boat #2 | | Done | Processing UC2 flakes (batch#05 - 18062013) |
Peter Kunz wrote: |
1. stage - burning off organics complete
2. stage - carbonization began 1-8 am 2013/07/02
|
Thursday, July 11, 2013, 16:11
EPICS was down and wiped out all the strip tools, but Evap stayed on. Data archivers showed the system was down at around mid-night on July 10 - no data was archived for 12 hours.
TGHT has stayed at 520A (max) for at least 4 hours since I started the Evap EPICS back.
Vacuum is currently at 7.7e-6 Torr.
The carbonization process is complete.
Auto-cool down in process - at 1A/min.
|
72
|
Monday, July 15, 2013, 09:45 |
John Wong | UO2/C | Target boat #2 | | Done | Processing UC2 flakes (batch#05 - 18062013) |
John Wong wrote: |
Peter Kunz wrote: |
1. stage - burning off organics complete
2. stage - carbonization began 1-8 am 2013/07/02
|
Thursday, July 11, 2013, 16:11
EPICS was down and wiped out all the strip tools, but Evap stayed on. Data archivers showed the system was down at around mid-night on July 10 - no data was archived for 12 hours.
TGHT has stayed at 520A (max) for at least 4 hours since I started the Evap EPICS back.
Vacuum is currently at 7.7e-6 Torr.
The carbonization process is complete.
Auto-cool down in process - at 1A/min.
|
Monday, July 15, 2013, 09:43
The TGHT reached to zero on Friday and the chamber has been left under vacuum over the weekend, currently at 1.3e-6 Torr.
The chamber will be vented in Ar and the UC2 flakes will be transported into the Ar-glove box.
The process is complete
|
48
|
Monday, May 14, 2012, 15:22 |
John Wong | | Target boat | | | Testing the new graphite foil from Ceramaterial | Monday, May 14, 2012, 15:04
Due to the differences in the use of the graphite foils in past SiC targets (C-grv foil from Alpha Aesar) and the newly prepared SiC#27 (C-grv foil from Ceramaterial), the out-gassing period for SiC#27 took over 6 days compared to 3 days for the vacuum to come down (see https://elog.triumf.ca/TIS/Evaporator_1/47).
A few pieces of the new graphite foil is loaded on the target boat to test the out gassing reaction.
The Evap #1 chamber has been pumped down to low 10e-5.
Set to same parameter, see attachment#1
Initiated auto heating...
Tuesday, May 15, 2012, 14:46
The target heater was ramped up to 820A. There was so much out gassing as the temperature was increased. The voltage did not hold at that current and the target heater was tripped off after the midnight. (see attachment #2)
After the chamber was vented, it was discovered that the target boat's legs were bent due to over heating. Both end of the targets where they touched the base got vaporized. The boat was also got squeezed. (see attachment #3).
However, the heated graphite foils (~1600C at 820A) looks pretty good. As per the supplier, CeraMaterials, the graphite was treated to 2000C. See attachment #4 for the certificate.
|
Attachment 1: parameter.JPG
|
|
Attachment 2: TGHT_0-820A.GIF
|
|
Attachment 3: graphite_test_target_boat.pdf
|
|
Attachment 4: Graphite_Foil-Certifcate_of_Compliance-Triumf_Order-1-16-12.pdf
|
|
|