  Evaporator_1, Page 7 of 15  Not logged in ELOG logo
  ID Date Author Target Material Target Oven W.O# Source Status Subject Text Attachments
  175   Thursday, November 23, 2017, 13:39 Marla CervantesUO2/C40282-2 TARGET BOATDoneCarbonizing UO2/C discs for 1stepUCx in graphite sample container _#3 Thursday, November 23, 2017, 13:34
Circles from cast 1 were used,
 171124_1e-1.jpg 
  174   Wednesday, November 22, 2017, 14:20 Laura Lambert   MaintenanceNew eye wash for hot lab! Wednesday, November 22, 2017, 11:05
Eye wash installed yesterday, simple
attachment on sink spout.
  
  173   Tuesday, November 14, 2017, 16:16 Laura LambertUO2/C40282-2TARGET BOATDoneCarbonizing UC2 discs for 1stepUCx in graphite sample container _#2 Tuesday, November 14, 2017, 16:12
Circles from cast 1 were used,
 striptool.JPG 
  172   Tuesday, November 07, 2017, 14:38 Laura LambertEmpty LP-FEBIADDoneTBHT test with LP-FEBIAD Tuesday, November 07, 2017, 14:34
LP-FEBIAD used several years ago
for temperature measurements is used for
 evap1_data.xlsx 
  171   Tuesday, November 07, 2017, 12:04 Laura Lambert   MaintenanceNoise levels checked - ear protection not required. Tuesday, November 07, 2017, 11:58
Noise levels were checked with monitor
by Terry.
  
  170   Tuesday, November 07, 2017, 11:57 Laura Lambert   MaintenanceInterlocks limits changed to 100mTorr Tuesday, November 07, 2017, 11:55
Interlocks limits updated/ changed
to 100mTorr for both TGHT and TBHT by Ray
  
  169   Tuesday, October 10, 2017, 14:16 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_19 Tuesday, October 10, 2017, 14:11
UO2/C green was prepared Oct
  
  168   Wednesday, September 27, 2017, 12:05 Laura LambertUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_18 Wednesday, September 27, 2017, 09:25
UO2/C green was prepared Sept
  
  167   Thursday, September 21, 2017, 11:35 Laura LambertEmpty  DoneTesting TBHT [1st run!], RP [new oil] and IG [new gauge] Thursday, September 21, 2017, 11:32
Copper plate attached to TBHT to
allow current to be applied.
  
  166   Wednesday, September 20, 2017, 08:07 Aaron Schmidt   MaintenanceIon gauge & RP statusWednesday, September 20, 2017, 08:00: 
-A new ion gauge was installed yesterday
afternoon and the old one removed. The old
  
  165   Thursday, September 07, 2017, 14:26 Aaron Schmidt   Maintenanceroughing pump oil replaced Thursday, September 07, 2017, 11:00
-12:00
The roughing pump was disconnected
  
  164   Wednesday, August 23, 2017, 15:54 Laura LambertUO2/C40282-2TARGET BOATDoneCarbonizing UC2 discs for 1stepUCx in graphite sample container _#1 Wednesday, August 23, 2017, 15:41
2 rounds of UO2/C were cast
 IMG_1768.JPGIMG_1774.JPG 
  163   Thursday, July 27, 2017, 09:08 Laura Lambert   Problems resolved*hot lab is HOT*

    

       
            
  
  162   Thursday, July 20, 2017, 15:57 Laura LambertUC242218-15LP-SISDoneConditioning UCx#21

    

       
            
 IMG_3249.JPGIMG_3251.JPGIMG_3257.JPGIMG_3258.JPGIMG_3260.JPG 
  161   Thursday, July 20, 2017, 15:35 Laura LambertUC242218-15LP-SISProblems resolvedConditioning UCx#21

    

       
            
  
  160   Thursday, July 20, 2017, 15:00 Laura LambertUC242218-15LP-SISProblemsConditioning UCx#21

    

       
            
 Capture.JPGCapture3.JPG 
  159   Wednesday, July 19, 2017, 14:17 Laura LambertUC242218-15LP-SISIn progressConditioning UCx#21

    

       
            
  
  158   Wednesday, July 19, 2017, 14:15 Laura LambertUC242218-15LP-SISProblems resolvedConditioning UCx#21

    

       
            
  
  157   Thursday, July 13, 2017, 14:50 Laura LambertUC242218-15LP-SISProblemsConditioning UCx#21

    

       
            
  
  156   Thursday, July 13, 2017, 12:49 Laura Lambert   Problems*hot lab is HOT*Thursday, July 13, 2017, 12:48
NOTE: hot lab reached 27degrees every
day this week and went up to 28C today! 
 Capture.JPG 