ID |
Date |
Author |
Type |
Category |
Subject |
Text |
 |
301
|
Thu Jun 24 11:52:34 2010 |
Damien Gallop | | | 24Mg5+ to TIGRESS setup | Tuning into ISAC-II was done yesterday,
and continues today. The source was idle
overnight. There were a couple of magnesium |
|
302
|
Mon Jun 28 09:19:16 2010 |
Damien Gallop | | | 24Mg5+ to TIGRESS | Delivery looks like it was pretty smooth
over the weekend. TIGRESS expects to receive
24Na from ITW via the CSB this week. Yield |
|
303
|
Tue Jun 29 09:16:33 2010 |
Damien Gallop | | | 24Mg5+ to TIGRESS | Delivery to TIGRESS has begun. Beam from
the source looks perfect. Looks like happy
times for them. The plan is to eventually |
6x |
304
|
Wed Jun 30 09:11:25 2010 |
Damien Gallop | | | 24Mg5+ to TIGRESS | Delivery / standby continues. |
 |
305
|
Mon Jul 5 11:58:49 2010 |
Damien Gallop | | | 26Mg6+ for TIGRESS | Beam was switched from 24Mg5+ to 26Mg6+
on Canada
Day. Also, the source blinked out on |
|
306
|
Tue Jul 6 08:57:33 2010 |
Damien Gallop | | | 26Mg6+ for TIGRESS EOB | Photo-finish for TIGRESS this morning,
apart from a cavity trip
at around 6:00 a.m.. The MWS is running very |
  |
307
|
Tue Jul 6 19:10:33 2010 |
Damien Gallop | | | OLIS Maintenance | Source pulled down for Mg removal and cleanup.
Done. Supernanogan refurbishing of MCIS optics
complete, plus a comple of other items. Opened |
|
308
|
Wed Jul 7 15:21:36 2010 |
Damien Gallop | | | 16O1+ for SCC Commissioning | A 16O1+ beam from the MWS is being used
for SCC development and commissioning by
agreement. Some sideshows getting there. |
|
309
|
Thu Jul 8 09:38:36 2010 |
Damien Gallop | | | 16O1+ at 32.64keV for accelerator commissioning | Beam idle overnight. Source conditioned
and changed a bit. Slight tweaking required
to bring it back to stable. |
|
310
|
Fri Jul 9 10:00:03 2010 |
Damien Gallop | | | 16O1+ at 32.64keV for accelerator commissioning | Source drifted overnight. Operators made
a slight correction to silence an alarm.
I have tweaked this up. Shown below are before |
8x |
311
|
Mon Jul 12 10:55:14 2010 |
Damien Gallop | | | 16O1+ at 32.64keV for accelerator commissioning | Beam used sporadically over the weekend.
Note temperature response in beam. A power
bump occurred at about 10:00, knocking out |
|
312
|
Tue Jul 13 18:33:04 2010 |
Damien Gallop | | | OLIS Maintenance and Development | A source switchover day was negotiated,
with a goal to provide 12C2+ beam. As a practical
matter, it's been an OLIS Maintenance Day, |
|
313
|
Wed Jul 14 09:23:19 2010 |
Damien Gallop | | | 12C2+ for TIGRESS | OLIS is set up for 12C2+ delivery, with
about 13enA on FC6 from the Supernanogan
source presently. Beam was reasonably stable |
|
314
|
Fri Jul 16 10:22:35 2010 |
Damien Gallop | | | 12C2+ for TIGRESS | Tuning to TIGRESS is continuing. There
is a full expectation that they will take
RIB over the weekend. |
|
315
|
Mon Jul 19 10:56:53 2010 |
Damien Gallop | | | 12C2+ for TIGRESS | Beam from the Supernanogan remains on standby
for TIGRESS pilot beam. There were a couple
of source trips over the weekend, at least |
|
316
|
Tue Jul 20 09:38:45 2010 |
Damien Gallop | | | OLIS Maintenance | Our work permit to leakcheck the Supernanogan
and IOS was signed this morning. The source
is off presently, and work is underway. The |
|
317
|
Thu Jul 22 09:25:21 2010 |
Damien Gallop | | | 74Ge1+ to TITAN | The Supernanogan is producing 74Ge
using the heater source, a first for the
Supernanogan. Development done over the last |
|
318
|
Fri Jul 23 13:00:04 2010 |
Damien Gallop | | | 74Ge1+ to TITAN | Beam remained on FC6 overnight. Beam was
used for a tune check this morning. At noon
today beam was switched to 4He. |
 |
319
|
Mon Jul 26 09:41:46 2010 |
Damien Gallop | | | 74Ge1+ to TITAN | Beam is sitting on FC6 presently. Good
source operation over the weekend. Some pics
to come. RIB delivery to TITAN ended at 08:30 |
|
320
|
Tue Jul 27 08:55:49 2010 |
Damien Gallop | | | OLIS Maintenance | Today we switch from 74Ge1+ to 4He1+, about
as wide a switch as we've done at OLIS. We
will use the MWS for the 4He. |
  |