M9sol Logbooks Solenoid Daily log
  Solenoid logbook, Page 9 of 15  ELOG logo
ID Date Author Operational Mode Subjectdown Text Attachments
  127   Wed Jun 14 10:35:30 2006 Willy AnderssonQuench RecoverySwitched to series cooling.Had system in //return cooling overnight with
small flow to keep power 
leads cool. Switched to series mode about
  
  273   Mon Oct 5 11:54:58 2009 Doug PreddyNormal RunningSwitched TIC121 into auto mode    
  30   Fri Jun 25 14:20:58 2004 Willy AnderssonQuench RecoverySwitch to series modeAt about 14:00 solenoid temps dipping below
8 K. Trace of LHe level (dense 
gas) starting to show. Switching to series
  
  47   Thu Sep 2 21:58:34 2004 Willy AnderssonQuench RecoverySwitch to series coolingSolenoid had tripped on powerlead overtemp
at about 09:00 this morning. 
Doug recovered the system to // cooling.
  
  215   Tue Aug 14 12:55:12 2007 Doug PreddyNormal RunningStrip tool savesThere are two strip tools saved:
coils
powerlead
  
  172   Thu Oct 26 04:34:15 2006 Willy AnderssonQuench RecoveryStill in // cold return mode.Leaving system cooling in // cold return mode,
cooldown rates still good. 
Had flow on to powerleads since re-starting
  
  243   Tue Apr 1 15:17:06 2008 Doug PreddyStart UpStarting up vacuum systemsMonday afternoon there was no control of the
vacuum system. The controls were working,
but no output to devices. The "output" breaker
  
  19   Thu Apr 29 23:43:15 2004 Doug PreddyQuench RecoveryStarting flow to solenoidSolenoid quenched due to power leads at 9:00
tonight. Restarted flow in 
parallel warm mode. 
  
  36   Wed Jul 28 22:01:31 2004 Doug PreddyQuench RecoveryStarting flow to solenoidc1 28, c12 29, c6 11.6, c7 12.5 TI121 22.5   
  162   Wed Oct 4 07:29:04 2006 Doug PreddyStart UpStarting cool downStarted compressor yesterday with flow through
the purifier overnight.
Starting tubines this morning in parallel
  
  5   Mon Apr 19 15:06:49 2004 Doug PreddyStart UpStarted turbinesPurifier run over the weekend. Both LN2 dewars
empty, but purifier cold. 
Disabled CV211 and flowed all charge gas
 april191500.BMP 
  52   Mon Oct 4 09:16:29 2004 Doug PreddyStart UpStarted turbinesStarted flow to the turbimes with the solenoid
in parallel warm return.
  
  117   Tue May 23 08:44:28 2006 Doug PreddyStart UpStarted turbinesSolenoid and cold box were pumped out last
Tuesday. Cold box roughing pump 
initially would not start. had to retighten
  
  190   Tue Apr 24 10:21:49 2007 Doug PreddyStart UpStarted flow to turbinesStarted flow to turbines at about 10:00 in
parallel warm mode.
  
  121   Fri May 26 10:03:03 2006 Doug PreddyStart UpStarted flow to power leadsStarted flow to power leads.
Liquid level 15%
  
  220   Mon Sep 24 15:08:41 2007 Doug PreddyStart UpStarted cool down this morningThe vacuum in the cold box was good on Friday
0.0 X 10-4. Let it pump over 
the weekend. Added two bottles of UHP helium
  
  275   Mon Mar 29 09:25:52 2010 Kevin TrithardtStart UpStarted cool down this morning    
  189   Mon Apr 23 16:31:02 2007 Doug PreddyStart UpStarted compressorStartewd compressor and purifer today.   
  274   Wed Mar 24 08:30:33 2010 Doug PreddyStart UpStart upCompressor started yesterday afternoon.
Pumping out solenoid overnight. Cold box
vacuum good. circulating helium to solenoid
  
  160   Thu Aug 17 08:04:44 2006 Doug PreddyQuench RecoverySolenoid tripped at about 3:00 this morningrestarting system.
Compressor would not start. Idid not see
anything that would not let it 
  
ELOG V2.9.2-2455