Purifier run over the weekend. Both LN2 dewars empty, but purifier cold.
Disabled CV211 and flowed all charge gas through purifier. Started turbine
at 11:00am. set strip tool to monitor temps. Started M9BCP2. Pumped out
beamline between BV% and BV7. Opened BV6. |