M9sol Logbooks Solenoid Daily log
  Solenoid logbook  ELOG logo
Message ID: 5     Entry time: Mon Apr 19 15:06:49 2004
Author: Doug Preddy 
Operational Mode: Start Up 
Subject: Started turbines 
Purifier run over the weekend. Both LN2 dewars empty, but purifier cold. 
Disabled CV211 and flowed all charge gas through purifier. Started turbine 
at 11:00am. set strip tool to monitor temps. Started M9BCP2. Pumped out 
beamline between BV% and BV7. Opened BV6.
Attachment 1: april191500.BMP  2.109 MB
ELOG V2.9.2-2455