Solenoid and cold box were pumped out last Tuesday. Cold box roughing pump
initially would not start. had to retighten all wires on the contactor in
the Sulzer control panel (RP900).
Started compressor on Friday. ran purifier over the weekend.
Started flow in parallel warm return. Started flow to turbines.
Replacing dead monitor on other control computer. |