Entry  Thu Nov 3 06:19:50 2005, Doug Preddy, Quench Recovery, restart system 
Last night at about 7:00 there was a large power bump that shut the 
compressor and water pump off. I came in this morning and am restarting the 
system.
Entry  Thu Nov 3 09:27:16 2005, Doug Preddy, Quench Recovery, started flow to solenoid 
started flow to solenoid in parallel cold return.
Entry  Tue Nov 15 07:25:10 2005, Doug Preddy, Normal Running, power supply problem 
Saturday November 12 the solenoid power supply ramped itself down to zero. 
It would not ramp up unless the ramp rate was set to 30 minutes. At this 
setting the power supply ramped up to the required current. It seems to 
ramp slower than the 30 minute rate. Klaus also looked at the problem. His 
suggestion is to exercise/clean the switches and pots.
Entry  Mon Dec 12 09:24:29 2005, Doug Preddy, Quench Recovery, Solenoid Quench on power lead temp 
The solenoid tripped on power lead temps at about 9:15. I am recovering it 
from it's all around mode into parallel cold return.
Entry  Thu Dec 22 15:10:44 2005, Doug Preddy, Shut Down, shut down system 
shuttting down the system. isolated cold box by closing v135. preparing to 
pump out cold box.
Entry  Tue May 23 08:44:28 2006, Doug Preddy, Start Up, Started turbines 
Solenoid and cold box were pumped out last Tuesday. Cold box roughing pump 
initially would not start. had to retighten all wires on the contactor in 
the Sulzer control panel (RP900).
Started compressor on Friday. ran purifier over the weekend.
Started flow in parallel warm return. Started flow to turbines.
Replacing dead monitor on other control computer.
Entry  Thu May 25 07:34:18 2006, Doug Preddy, Start Up, switched to parallel cold return 
switched to parallel cold return
Entry  Fri May 26 07:29:54 2006, Doug Preddy, Start Up, CV155 closed 
CV155 closed.
Temps about 15K
Entry  Fri May 26 08:45:38 2006, Doug Preddy, Start Up, Changed to series mode 
Changed to series mode.
Liquid level building.
Entry  Fri May 26 10:03:03 2006, Doug Preddy, Start Up, Started flow to power leads 
Started flow to power leads.
Liquid level 15%
Entry  Fri May 26 14:34:24 2006, Doug Preddy, Start Up, Ready to run 
Solenoid is cold, liquid level is 35%, power leads cold and seem stable.
Added one bottle helium to buffer tank. Pressure is 7 psi..
Entry  Tue May 30 14:36:41 2006, Doug Preddy, Normal Running, power leads warming 
power leads warming. closed HIC 142, then re-opened. temps falling
Entry  Tue Jun 13 10:54:27 2006, Doug Preddy, Quench Recovery, Compressor tripped off 
No indicator lights etc as to why the compressor tripped. The only  light 
was a cold box fault. I had to shut off the main breaker before the 
compressor would come back on.
Started cooling in parallel  cold return.
Entry  Fri Jun 16 08:12:04 2006, Doug Preddy, Normal Running, LI108 indicates high on EPICS screen 
LI108 indicates high on EPICS screen (150%)  Controller shows ~64%
Entry  Fri Jun 30 11:13:00 2006, Doug Preddy, Normal Running, E-log is back up and running 
I would have made an entry when it died, but-----
Entry  Fri Jun 30 11:17:57 2006, Doug Preddy, Normal Running, Solenoid recovered 
Tuesday night. June 27, 2006, the solenoid quenched for no apparent 
reason. It was restarted Wednesday morning. The vacuum in the solenoid 
went away (up to 8 Torr). This was found to be a result of a leaking 
isolation valve between the solenoid and T2. T2 was vented, which caused 
the solenoid to slowly vet. When T2 was pumped out again, the solenoid 
vacuum recovered. This caused a delay in recovering the solenoid. As of 
Friday morning 7:15 the solenoid power supply was ramped up.
Entry  Mon Jul 3 23:01:34 2006, Doug Preddy, Quench Recovery, power lead warming/ripples caused quench 
power lead warming/ripples caused quench at 18:45 today. Compressor stayed 
on, but flow to solenoid stopped.
I started flow to solenoid at 22:40.
Entry  Thu Jul 6 15:00:15 2006, Doug Preddy, Normal Running, test 
 
Entry  Thu Jul 6 15:04:17 2006, Doug Preddy, Normal Running, test M9daily log070306.XLS
test
Entry  Thu Jul 20 00:25:16 2006, Doug Preddy, Quench Recovery, Solenoid quenched @ 11:15 
Solenoid Quenched on C1 temp. It went above 5K. Shut off compressor. 
Restarting system @ 12:15