M9sol Logbooks Solenoid Daily log
  Solenoid logbook  ELOG logo
Message ID: 132     Entry time: Mon Jul 3 23:01:34 2006
Author: Doug Preddy 
Operational Mode: Quench Recovery 
Subject: power lead warming/ripples caused quench 
power lead warming/ripples caused quench at 18:45 today. Compressor stayed 
on, but flow to solenoid stopped.
I started flow to solenoid at 22:40.
ELOG V2.9.2-2455