M9sol Logbooks
Solenoid
Daily log
Solenoid logbook, Page 4 of 15
New
|
Reply
|
Find
|
Delete
|
Last day
|
Help
|
Config
Full
| Summary |
Threaded
286 Entries
Goto page
Previous
1
,
2
,
3
, 4,
5
...
13
,
14
,
15
Next
All
ID
Date
Author
Operational Mode
Subject
Text
226
Fri Oct 5 13:25:41 2007
Doug Preddy
Quench Recovery
funny graph
There was a fluctuation of the positive lead
temp with no flow going to
the power leads.
225
Fri Oct 5 10:25:43 2007
Doug Preddy
Quench Recovery
Unknown quench 2
Kevin and I were at the Sulzer panel when
the system quenched 2. No
obvious reasons. Restarted the system.
224
Tue Oct 2 13:02:37 2007
Doug Preddy
Normal Running
PLC problems
While downloading new code for 2A PLC the
M9 and M15 vacuum systems were
shut off. This is due to the two systems
223
Thu Sep 27 07:41:15 2007
Doug Preddy
Start Up
Solenoid cold
Solenoid cold and in series mode. 50% liquid
level. Starting flow to
powerleads.
222
Wed Sep 26 08:52:46 2007
Doug Preddy
Start Up
switched to parallel cold return
221
Tue Sep 25 07:34:04 2007
Doug Preddy
Start Up
PIC229 to 11 bar
adjusted turbine speeds and HIC104 to maintain
their values.
220
Mon Sep 24 15:08:41 2007
Doug Preddy
Start Up
Started cool down this morning
The vacuum in the cold box was good on Friday
0.0 X 10-4. Let it pump over
the weekend. Added two bottles of UHP helium
219
Wed Sep 19 20:53:18 2007
Doug Preddy
Maintenance
More diff pump news
Cold box pumped out to ~ 190 mTorr overnight.Leak
checked the pump again.
Still leaks at dip stick.Tried resetting
218
Tue Sep 18 18:48:11 2007
Curtis Ballard
Maintenance
cold box leak check
The leak check of the cold box diff pump fittings.
Found a leak at the
base of the diff pump on the tee that is
217
Fri Sep 14 12:44:52 2007
Doug Preddy
Start Up
started compressor
running purifier over weekend
216
Wed Sep 12 12:01:02 2007
Doug Preddy
Maintenance
regenerated adsorber
regenerated adsorber
replaced MV902 "ON" switch (used nitrogen
precooling on switch)
215
Tue Aug 14 12:55:12 2007
Doug Preddy
Normal Running
Strip tool saves
There are two strip tools saved:
coils
powerlead
214
Tue Aug 14 10:15:22 2007
Doug Preddy
Maintenance
Solenoid ramped down
Solenoid ramped down and locked out for M9A
slits work.
213
Mon Aug 6 08:41:31 2007
Doug Preddy
Quench Recovery
Cold box trip at 6:00
compressor off due to cold box trip at 6:00
this morning. Restarted system
and started flow to solenoid in parallel
212
Tue Jul 31 07:53:57 2007
Kevin Trithardt
Normal Running
cycled power leads
got a page for the power lead temp
came down and cycled the power leads.. did
not seem to make a difference..
211
Sun Jul 29 04:58:27 2007
Doug Preddy
Quench Recovery
Energizing solenoid
LHe level~50%. Still have a slight ripple
in the power leads, but they are
cold enough to power the solenoid. LHe_in
210
Sat Jul 28 22:30:13 2007
Doug Preddy
Quench Recovery
quench again
recovered system and energized solenoid at
about 6:00 this evening.
At 9:30 power lead temps quenched solenoid
209
Sat Jul 28 15:45:17 2007
Doug Preddy
Quench Recovery
quench recovery
The solenoid tripped off this morning due
to pwer lead over temp. The
compressor was also off. I restarted this
208
Thu Jul 5 11:01:47 2007
Kevin Trithardt
Other
Current lead warm up
Due to curent lead temperature occilation
Doug recommended warming up the
current leads.
207
Thu Jul 5 03:04:50 2007
Doug Preddy
Normal Running
Power lead problems
The power leads temps are starting to cycle
again. Earlier today M9
experimentor cycled HIC142 to stablize the
Goto page
Previous
1
,
2
,
3
, 4,
5
...
13
,
14
,
15
Next
All
ELOG V2.9.2-2455