M9sol Logbooks Solenoid Daily log
  Solenoid logbook  ELOG logo
Message ID: 214     Entry time: Tue Aug 14 10:15:22 2007
Author: Doug Preddy 
Operational Mode: Maintenance 
Subject: Solenoid ramped down 
Solenoid ramped down and locked out for M9A slits work.
ELOG V2.9.2-2455