  3   Fri Dec 19 13:59:53 2003 Doug PreddyMaintenanceTo-Do list for M9SOL> I had distributed this list by email earlier
this month. I have added
> a few items at the bottom. I am posting
  
  28   Fri May 21 09:27:39 2004 Doug PreddyMaintenanceIdle modePower supply was ramped down yesterday as
there are no users.
The Sundance server was rebooted yesterday.
  
  51   Fri Oct 1 11:39:55 2004 Doug PreddyMaintenanceLoading of compressor not workingWhen the compressor was restarted on Monday,
the remote load button would 
not respond. The compressor was shut off.
  
  91   Fri Mar 11 09:18:30 2005 Doug PreddyMaintenanceservices on systemThe cold box was isolated and pumped out after
it warmed up. It has been 
refilled with helium.
  
  92   Mon Apr 18 09:52:11 2005 Doug PreddyMaintenanceRelays replacedThe following relays have been replaced in
the Sulzer control panel:
K341, K379, K132, K324A, K314, K125, K127,
  
  93   Thu May 19 15:05:31 2005 Doug PreddyMaintenanceSTA 120 replacedThe turbine 2 speed indicator control box
STA 120 has been replaced with a 
newer style Jaquet controller. This is similar
 M9 Turbine 2.doc 
  185   Fri Jan 26 15:10:37 2007 Doug PreddyMaintenancenew control computer installedI have installed a new control computer at
the M9 solenoid control panel
  
  186   Mon Mar 5 14:59:41 2007 Doug PreddyMaintenancePasswordOn the weekend someone used this log to send
spam messages. I have 
installed a password for the write privilege.
  
  196   Wed May 16 10:02:35 2007 Doug PreddyMaintenancewarming up power leadsPower lead temps have been slowly increasing
over the last wekk. I ramped 
the solenoid down and am warming the power
  
  201   Tue Jun 12 12:48:25 2007 Doug PreddyMaintenanceadded one bottle UHP helium to system    
  214   Tue Aug 14 10:15:22 2007 Doug PreddyMaintenanceSolenoid ramped downSolenoid ramped down and locked out for M9A
slits work.
  
  216   Wed Sep 12 12:01:02 2007 Doug PreddyMaintenanceregenerated adsorberregenerated adsorber
replaced MV902 "ON" switch (used nitrogen
precooling on switch)
  
  218   Tue Sep 18 18:48:11 2007 Curtis BallardMaintenancecold box leak checkThe leak check of the cold box diff pump fittings.
 Found a leak at the 
base of the diff pump on the tee that is
  
  219   Wed Sep 19 20:53:18 2007 Doug PreddyMaintenanceMore diff pump newsCold box pumped out to ~ 190 mTorr overnight.Leak
checked the pump again. 
Still leaks at dip stick.Tried resetting
  
  229   Wed Oct 24 12:04:06 2007 Doug PreddyMaintenancepower lead and cryopump regenerationRegenerating M9B:CP2 as temperature was up
to almost 20k.
Shut off flow to power leads to allow them
  
  233   Fri Nov 9 16:24:33 2007 Doug PreddyMaintenance2APLC Diedthumb wheel panel all lite up. 2APLC rebooted
by Klara (Thanks). M9BMP2 not 
pumping properly. Edi is looking at it. 
  
  234   Fri Nov 9 18:56:20 2007 Doug PreddyMaintenanceSystem Ready to RunM9BMP2 was replaced. Vacuum good. Solenoid
is ramped up. :)
  
  258   Tue Sep 9 15:04:23 2008 Doug PreddyMaintenanceJumpered interlock for diff pump water flowJumpered interlock for diff pump water flow
in Proteus box.
  
  259   Fri Sep 26 09:44:25 2008 Doug PreddyMaintenanceWater flow interlock restoredyesterday   
  266   Wed Dec 10 15:44:58 2008 Doug PreddyMaintenanceRepairs to solenoid power supplyKlaus and company pulled the ramp rate card
out of the solenoid power supply. Operational
checks were done and the rate switch was
  