M9sol Logbooks Solenoid Daily log
  Solenoid logbook  ELOG logo
Entry  Fri Dec 19 13:07:25 2003, Willy Andersson, Maintenance, To-Do list for M9SOL M9Blist3.txt
    Reply  Fri Dec 19 13:59:53 2003, Doug Preddy, Maintenance, To-Do list for M9SOL 
Message ID: 3     Entry time: Fri Dec 19 13:59:53 2003     In reply to: 2
Author: Doug Preddy 
Operational Mode: Maintenance 
Subject: To-Do list for M9SOL 
> I had distributed this list by email earlier this month. I have added
> a few items at the bottom. I am posting it on the M9SOL Elog under
> Maintenance. Some of the items may not be achievable or practical but
> I thought it would be a useful first attempt at a To-Do list.

A couple of other things to add:
Rebuild cooling water circulation pump with new seals and bearings.
Add air bleeds to the copper nonactive water lines.
Doug
ELOG V2.9.2-2455