Sat Apr 9 11:35:14 2011, Tom Davinson, , , TUDA configuration & setup
|
Nominal detector configuration for S1287 is as follows:
Detector Tgt Ladder #2
-Detector Nominal LAB Solid
Distance (cm) Angles (deg) Angle (sr)
S2-1 7.0 9.5-26.4 0.430
S2-2 28.0 2.4-7.1 0.032
W >35.0 0.0-4.1 ~0.020
S2-1 MSL type S2(DS)-500
S2-2 MSL type S2(DS)-500
W MSL type W(DS)-1000
Hardware installed in TUDA chamber is as follows (listing from
upstream to downstream):
1 Upstream support collar
2 PDs (to monitor Ni window)
PD preamplifier assembly
3 4mm dia collimator
CCTV camera?
Target Ladder - Position #1 - 83cm from inner surface of the downstream flange
5mm dia anti-scatter collimator
PDs (to monitor 197Au RBS)
Target Ladder - Position #2 - 75cm from inner surface of the downstream flange
10mm & 3mm dia tuning apertures, ZnS, PDs, (CH2)n targets
4 S2-1 DSSSD
S2 preamplifier assembly
5 S2-2 DSSSD
S2 preamplifier
6 W DSSSD
W preamplifier assembly (to be shipped to TRIUMF)
7 Faraday Cup
8 Downstream 4-vane monitor (not used)
Detector mounts will be within +/-5mm of their nominal positions. |
Sat Apr 9 14:57:30 2011, Tom Davinson, , , MIDAS DAQ configuration 11x
|
tuda2 (by TUDA chamber, SEBT1) was powered off on arrival
- this may have been due to a previous power outage between
March 18-April 4. Rebooted OK.
MIDAS DAQ operational
MIDAS DAQ reads out CAEN V560 Scaler #1 channels #0-7 (see
file VMEDataSources below) on a per event basis.
Data directory tuda2:/data2/data/S1287
S1287 requires 64+64+32+16=176 channels of ADCs/TDCs
i.e. 6x Silena 9418/6V ADCs and 2x CAEN V1190A TDCs.
Currently configured for 11x ADCs, 3x TDCs and 2x Scalers.
Note - VME crate #2 (top) displays a yellow 'overheat'
warning LED. This is probably bogus - the air and PSU
temperatures reported by the front panel look OK.
MIDAS DAQ works for mode 'MIDAS Data Acquisition' and
'TUDA'. For the latter, all scalers and the EPICS variables
(defined by tuda:/MIDAS/TUDA/tcl/EpicsDefn.tcl - see below)
are readout every 20s. |
Mon Apr 11 14:57:08 2011, Tom Davinson, , , SEBT1 & HERACLES wipe tests
|
Work permit (2011-4-11-3) was requested to vent SEBT1 upstream of TUDA chamber
and HERACLES to permit line-of-sight for alignment of TUDA chamber. Note that
Facility Coordinators are Lothar Buchmann/Pat Walden/Sky Sjue and Gordon Ball/Randy
for TUDA and HERACLES respectively.
Wipe test was performed by Tom Davinson (PPE: respirator and gloves).
Samples checked by Fiona Holness RPG - check OK. |
Mon Apr 11 18:39:17 2011, Tom Davinson, , , Monday 11 April
|
TUDA was successfully re-installed on SEBT1 by LB, TD, AML and PM.
Alignment checked by pillar mounted telescope downstream of HERACLES
and target ball between SEBT1 bending magnet and diagnostic section.
With minor adjustments of upper stage table the upstream and downstream
targets were within 15 thou L-R/U-D. Upper stage table and feet locked.
14.00 Cryo pumped by TUDA2:BP5 to <100mTorr
TUDA2.RVC5 closed and cryo compressor switched on
See attachment 1 for EPICS log
Note: MiniSys Eye-IMG ion gauge installed (EPICS readout only)
Re-entrant flange assembly installed - currently the 'window' NW25
fitting is open.
Centre target ladder linear translator re-installed. Note the
downstream linear translator needs to be moved to the upstream
position.
18.28 Time from 1 bar to 250mTorr ~12m (turbo ON)
Time from 250mTorr to 5.0E-4Torr ~5m (cryo ON)
Note: Transients in TUDA:PNG5:RDVAC when cryo gate valve opened
Observed pressure decreases to <1E-10Torr (PM tells
me that for this gauge this effectively means 'off'
cf. the usual TUDA ion gauge which reads high when 'off')
Time from 5.0E-4Torr to 5.0E-05Torr ~6m ('good' vacuum)
Total pump down ~24m (empty chamber)
See attachment 2 for EPICS log
07.32 Tuesday 12 April
See attachment 3 for overnight EPICS log
TUDA2:PNG5:RDVAC 7.2E-07Torr |
Tue Apr 12 11:21:38 2011, Tom Davinson, , , Tuesday 12 April
|
The TUDA @ ISAC-II grounding test was successfully completed this am
per work permit 2011-04-12-2.
We measured 60V/0mA (with PSU) and 0.385MOhm with a Digital multimeter.
The TUDA grounding test is now complete. The TUDA ground breaker switch
is now closed and locked. The lockout key has been returned to ISAC Ops.
11.27 TUDA2.PNG5 6.27E-07Torr
11.30 Vent to install experiment configuration and coolant loop
14.00 Experiment configuration (https://elog.triumf.ca/Tuda/S1287/2)
installed.
Coolant loop installed.
FTS RS44LT recirculating chiller coolant (ethanol) drained from
reservoir and returned to 5-litre red plastic gerry can - now stored
in Pat Walden's N. Cupboard in the ISAC-I hall.
FTS RS44LT coolant now 7-stage filtered water from ISAC-II cleaner's
room (on the corridor to rooms 148 & 154).
FTS RS44LT Set Low (SL) parameter changed from -43 deg C to +5 deg C
15.00 Test of coolant loop in air - no gross leaks
15.30 Commence pump down to test coolant loop at vacuum
See attachment 1 - time from turbo ON to 5.0E-5Torr ~18m
FTS RS44 switched on ~25' before datum - set point +5.5 deg C
TUDA.PNG5 pressure continues to decrease - coolant loop appears
to be OK
16.55 FTS RS44 temp +5.8 deg C
TUDA2.PNG5 9.24E-06Torr
FTS RS44 set point +22 deg C
Will leave pumping overnight with FTS RS44 off |
Wed Apr 13 09:37:51 2011, Tom Davinson, , , Wednesday 13 April
|
09.20 TUDA2.PNG5 1.04E-06Torr
See attachments 1 & 2 for EPICS log of pump down and overnight
pumping
09.37 Vent TUDA
14.00 S2-2 and W positions swapped
Coolant loop disconnected - needs to be re-tested
15.08 Time to 250mTorr ~12m
Time from 250mTorr to 4.75-05Torr ~28m
See attachment 3
15.36 FTS RS44 set point +5.5 deg C
17.00 TUDA2.PNG5 4.5E-06Torr
17.14 FTS RS44 set point +22 deg C
17.31 TUDA2.PNG5 6.2E-06Torr
Cryo closed and turbo pump switched off. Will monitor leak-in rate
from good vacuum (< 1E-05 Torr) overnight.
|
Thu Apr 14 10:06:34 2011, Tom Davinson, , , Thursday 14 April
|
10.02 See attachment 1 for overnight EPICS log of TUDA2.CG5
Downstream flange secured by four bolts
Current pressure 1.07Torr - rate of increase ~0.2 Torr/5h
11.30 TUDA chamber pumped down to ~800mbar
Downstream flange bolts removed - no change in pressure observed
N2 bottle connected to TUDA vent valve - to vent and (hopefully)
exceed atmospheric pressure forcing downstream flange to move open
Pressure measured using MKS Baratron 1000Torr gauge
Result - pressure increased from 800 to ~1000mbar in ~45s
TUDA chamber pressure did not noticably exceed atmospheric
pressure and there was no obvious movement of downstream flange.
Gas could be felt escaping from sides of downstream flange.
Conclude - contact with downstream flange O-ring failed at, or near,
atmospheric pressure - this prevented buildup in excess of atmospheric
pressure
11.50 Installed:
preamp services (+/-15V preamp power, +/- preamp test inputs) - 10-way IDC
ribbon cables
detector HT - SMC/BNC cabling
preamp signals - 34-way IDC twist-n-flat ribbon cables
preamp thermocouple attached to an S2-1 preamplifier
15.00 Time to 250mTorr ~14m
Time from 250mTorr to 4.75E-5Torr ~45m
See attachment 2
16.04 FTS RS44 set point +5.5 deg C
16.21 FTS RS44 temperature +5.6 deg C
17.12 TUDA2.PNG5 8.2E-06Torr
FTS RS44 temperature +5.8 deg C
Preamp thermocouple +8 deg C
17.13 +/-15V preamp power ON
17.18 Preamp thermocouple +14 deg C
TUDA2.PNG5 8.0E-06Torr
17.23 Preamp thermocouple +14 deg C
TUDA2.PNG5 7.9E-06Torr
17.28 Preamp thermocouple +15 deg C
TUDA2.PNG5 7.7E-06Torr
17.43 Preamp thermocouple +15 deg C
TUDA2.PNG5 7.0E-06Torr
CAEN SY403 HV mainframe
Channel HT Detector Bias I_L
(V) (uA)
1 1 S2-1 -130 -0.03
2 2 S2-2 -130 -0.06
3 3 W -250 -0.02
4 4 PD -30 -0.03
Low leakage currents as expected - no evidence of high resistance
shorts
All other channels set to 0V
+/-15V PSUs
#1 +15V/0A -15V/0A (MSL type W preamp not installed)
#2 +15V/1.65A -15V/0.65A (2x MSL type S2 + 1x 16ch PD preamp units)
17.58 Preamp thermocouple +13 deg C
TUDA2.PNG5 6.3E-06Torr
18.13 Preamp thermocouple +12 deg C
TUDA2.PNG5 5.8-06Torr
18.29 Preamp thermocouple +12 deg C
TUDA2.PNG5 5.3-06Torr
18.32 +/-15V preamp power OFF
FTS RS44 set point +21 deg C
18.39 Cryo gate valve closed
Turbo off and isolated
4x bolts securing downstream flange removed
Repeat yesterday's leak-in test (bolts removed)
|
Fri Apr 15 11:00:17 2011, Tom Davinson, , , Friday 15 April
|
11.15 See attachment 1 for overnight EPICS log of TUDA2.CG5
Downstream flange *not* secured by four bolts
Current pressure 0.97Torr - rate of increase ~0.2 Torr/5h
This history is very similar to the previous test (with
the flange secured by four bolts)
- see https://elog.triumf.ca/Tuda/S1287/10
Conclude - leak-in rate not affected by (i) lack of bolts
securing downstream flange, (ii) addition of cabling within
TUDA chamber - provided that the TUDA chamber has previously
been pumped to 'good' vacuum (< 1E-05Torr, say).
16.40 Modified preamp services cabling to avoid unterminated test -
input to PD preamp which causes reflections to previous test -
inputs to the S2 preamps.
+/-15V PSUs
#1 +15V/0.25A -15V/0.1A (1x 16ch PD preamp + 1x MSL type W preamp - not installed)
#2 +15V/1.5A -15V/0.55A (2x MSL type S2 + 1x 16ch PD preamp units)
16.51 Time to 250mTorr ~14m
Time from 250mTorr to 4.75E-05Torr ~40m
See attachment 2
17.50 FTS RS44 set point +5.5 deg C
18.48 TUDA2.PNG5 7.8E-06Torr
FTS RS44 set point +21 deg C
Cryo pump gate valve closed
Turbo pump off
Four bolts securing downstream flange removed
Vent to c. 300mbar with *He*
N.B. TUDA2.CG5 reads 770 Torr with 300mBar of He in TUDA chamber
MKS Baratron (capacitance manometer - gas independent reading)
attached to manual vent port of the Varian V550 turbo pump
Pressure reading at 'good' vacuum 0.0 Torr - no offset
Bourdon MKS S2 preamp
Baratron Thermocouple
(mBar) (Torr) (deg C)
19.08 300 221.7
19.18 300 222.0 +19
19.28 300 222.1 +20
19.38 300 222.3 +20
19.48 300 222.4 +21
20.08 300 222.6 +21 |
Sat Apr 16 09:31:56 2011, Tom Davinson, , , Saturday 16 April
|
Continuation of yesterday's test with c. 300mBar of He
in the TUDA chamber.
Bourdon MKS S2 preamp
Baratron Thermocouple
(mBar) (Torr) (deg C)
09.31 300 222.9 +22
10.30 300 223.1 +22
11.29 300 223.2 +22
12.29 300 223.3 +22
13.26 300 223.3 +22
14.27 300 223.5 +22
15.27 300 223.6 +22
16.28 300 223.7 +22
17.28 300 223.8 +23
18.28 300 223.9 +23
19.27 300 223.9 +23
20.27 300 223.9 +22
RAL109 Shaping Amplifier Modules
RAL109 Nominal Nominal Minimum
Resistor FSR Gain LLD
Detector Channels DIP (MeV) (keV/ch) (keV)
S2-1 p+n 0-47 3.3k 71.4 18.6 1300
S2-1 n+n 48-63 3.3k 71.4 18.6 1300
S2-2 p+n 64-111 1k 33.3 8.7 600
S2-2 n+n 112-127 1k 33.3 8.7 600
W p+n 128-143 1k 33.3 8.7 600
W n+n 144-159 1k 33.3 8.7 600
PDs 160-175 10k 183 47.7 3400
All RAL109 LLDs set to ~10mV (minimum)
CAEN V560 Scalers
Channel
0 Triggers
1 Triggers accepted
2 1kHz clock
3 Ortec 439
4 Pulser
5
6
7
8 S2-1 OR ch 0-15
9 S2-1 OR ch 16-31
10 S2-1 OR ch 32-47
11 S2-1 OR ch 48-63
12 S2-2 OR ch 64-79
13 S2-2 OR ch 80-95
14 S2-2 OR ch 96-111
15 S2-2 OR ch 112-127
16 W OR ch 128-143
17 W OR ch 144-159
18 PD OR ch 160-175
19
20
21
22
23
24
25
26
27
28
29
30
31 |
Sun Apr 17 09:47:04 2011, Tom Davinson, , , Sunday 17 April
|
Continuation of yesterday's test with c. 300mBar of He
in the TUDA chamber.
Bourdon MKS S2 preamp
Baratron Thermocouple
(mBar) (Torr) (deg C)
09.45 300 222.8 +21
10.44 300 222.9 +21
11.48 300 223.1 +22
11.49 FTS RS44 set point +22.0 deg C
+/-15V preamp power ON
12.01 300 223.4 +26 FTS RS44 @ set point
12.31 300 223.7 +26
13.00 300 223.9 +26
13.01 FTS RS44 set point +15.0 deg C
13.11 300 223.4 +21 FTS RS44 @ set point
13.41 300 223.0 +22
14.11 300 222.9 +22
15.14 300 222.9 +22
16.11 300 222.9 +22
17.11 300 223.1 +22
18.16 300 223.1 +22
19.10 300 223.2 +22
20.19 300 223.1 +21
20.20 +/-15V preamp power OFF
FTS RS44 set point +20 deg C
20.25 Bolts securing downstream flange re-installed
- finger tight only
20.45 Vent TUDA chamber to air, i.e. chamber contains He & air
See attachment 1. Conclude that the preamps can be operated with
the FTS RS44 recirculating chiller set point +15 deg C with 300mBar
of He. The S2-1 preamplifier thermocouple indicates that the preamplifiers
are operating at about ambient temperature with little apparent effect
on gas pressure.
N.B. For vacuum operation, the FTS RS44 set point should be +5.5 deg C
Pulser tests
BNC PB-4 settings:
Amplitude 90,000 x5 attenuator IN
frequency 266Hz
delay MIN
tail pulse
t_r 50ns tau_d 1000us
INT ref
polarity + (for p+n junction strips, - for n+n ohmic strips)
All ADC & TDC channels OK
ADCs
FWHM
Detector (ch) (keV)
S2-1 p+n #23 1.6 30
S2-1 n+n #8 1.6 30
S2-2 p+n #23 1.7 15
S2-2 n+n #8 1.8 16
W p+n #8 2.2 19 } using signals
W n+n #8 4.3 37 } from S2-2 preamps
PD #0 1.7 81
TDCs (0.8ns/ch)
Centroid FWHM
Detector (ch) (ch)
S2-1 p+n #23 245 1.4
S2-1 n+n #8 254 1.9
S2-2 p+n #23 253 1.7
S2-2 n+n #8 260 1.8
W p+n #8 254 1.8
W n+n #8 266 1.2
PD #0 233 1.6 |
Fri May 6 06:03:00 2011, Tom Davinson, , , Sort programs, spectra titles & calibration procedure
|
A summary of online sort programs can be found at:
~/S1287/sort/README
Program sort2.f remains to be completed.
VME and sort spectra titles can be found in directory:
~/S1287/titles
A summary of the calibration procedure can be found at:
~/S1287/calibration/README |
Thu May 12 03:04:44 2011, Tom Davinson, , , Re: Re-entrant flange alignment
|
> Alignments checks revealed that downstream end of
> TUDA was ~1mm off (can't remember which way).
Was the downstream flange bolted into position? |
Fri May 20 05:47:08 2011, Tom Davinson, , , 3.25MeV/u 21Ne(5+)
|
|
Sun May 22 11:45:03 2011, Tom Davinson, , , 4.11MeV/u 21Ne(5+)
|
|
Tue May 24 01:16:37 2011, Tom Davinson, Routine, General, Re: End of Shift summary
|
1.TDCs. We have been sorting offline, and we have now established that between run 66 and run 79, the TDC mode
was incorrectly set (not in common stop mode) after a DAQ crash causing broad loci in the E vs T spectra and
times of the wrong sign. This was corrected from Run 81 onwards.
TDC channel 0 (reference channel) should have been recorded in the EbyE data - common stop TDC values
can therefore be calculated offline by switching the egid2logical logical variable csm from TRUE to FALSE.
2. The offline sort is behaving very badly and many of the sorts run since yesterday to now are wrong. Make sure
you (a) sort on a different machine than the DAQ and (b) make sure that the sort is killed each time you start a
new sort and (c) make sure that it is sorting the righrt run number.
Amen |
Fri May 27 14:24:00 2011, Tom Davinson, , , S1287 data transfer
|
S1287 data files R1_*.gz to R100_*.gz transferred from directory
tuda2:/data2/data/S1287 to directory tuda3:/data3/data/S1287
This releases c.18Gb of space in the tuda2:/data2 filesystem |
Fri Jan 11 09:48:58 2013, Tom Davinson, Other, General, Re: multiplicities, hit patterns and good hits in an event
|
Jessica Tomlinson wrote: |
I have attached a pdf of a series of slides with some multiplicity and hit pattern plots on, also a list of cuts. As well as this I looked at how many 'good hits' (explained in pdf) I am getting per event.
Before Christmas I found that the code was not clearing the raw arrays read in by MIDAS and so unless a new piece of data filled the array channel number the data from the last event was being read into the next event too. It was only clearing the 'data(i) arrays which is what the data is unpacked as. I have now got it clearing both so data is not read in for multiple events.
|
?
As far as I am aware it has never been necessary to explicitly zero the 'raw' (or packed) data arrays containing the
ADC/TDC data and active channels in each event. Usually it is only necessary to zero those elements of the 'unpacked'
arrays which contain event data. |
Thu May 26 23:46:40 2011, Sarah and Brian, Routine, General, Thu 16:00-00:00 summary
|
Run139
Started 19:05:03
Stopped 20:36:36
Rates were reaching well above 8500, ops were measuring 160 epa on FC0 so they decreased it to 120 epa before starting next run.
Run 140
Started 20:42:12 - Scalers were acting up, stopped the run
Stopped 20:55:50
Run 141
Started 20:56:14
Stopped at 22:50:02
Rates were too low (~4289), ops were measuring 70 epa on FC0, got ops to increase current to 120 epa before starting next run.
Run 142
Started 22:56:34
Stopped 23:32:13
Rates were reaching above 9000 again, ops were reading 150 epa on FC0. Brought it back down to 115 epa before starting next run.
Run 143
Started 23:36:38 - scalers were acting up, stopped the run
Stopped 23:37:46
Run 144
Started 23:40:17
****submitting summary early in case browser crashes again. will update with any changes. |
Tue May 24 00:01:03 2011, Oliver and Hicham, Routine, , end of shift summary
|
Things have been running smoothly from 4 pm to midnight.
Reading in FC0 = 120-130 epA
Total trigger (accepted trigger) = 7500 (4000) Hz
Gas temperature has dropped from 30 to 22 deg C (due to evening cooling of experimental hall?). As a consequence, pressure has dropped by 0.2% (current value 249.8 torr).
Runs during this shift: 87, 88, 89, 90, and 91 (still running).
Runs 87-90 have been analyzed with sorting code.
Good night
|
Mon May 23 09:59:23 2011, Mike Bentley, Routine, General, End/Dtart of Run Summary (BRF/MAB)
|
Ran all night OK, currently 14epA, H2 stable, DAQ stable
ISSUES:
1. Analysis of S4200 in offline sort lead to conclusion that specttrum is dominated by protons, 8MeV punchthrough visible??.Not many events at high energies, where Alex MC predicts them to be.
2.Noticed that 3 channels in particular in S2-2 have very high rates. All in same bank - can we raise thresholds? Strips 34,36,46 in S2-2, we think (from mapping in sort code)
3. The loci in the E vs T spectrum are (a) still aparrently upside down from what expected and (b) very wide in time. There is also a suspiciously sharp edge to the timing peak. Look at eny E vs T loci in the sort
4.Been sorting over night - nearly caught up.
We looked a run (54) from the first H2 run at 4.4 MeV/u and compared with the current data. The The S4200 spectrum and the E vs T loci look exactly the same.
|