  271   Wednesday, January 16, 2013, 01:06 Sebastian RaederRFQ empty      Target installed - pumping downRFQ empty target installed
Wednesday, January 16, 2013, 01:05:
roughing started
  
  272   Thursday, January 17, 2013, 08:16 Sebastian RaederRFQ empty     In progressheatingThursday, January 17, 2013, 08:16: started
heating of the target, vacuum at 2.6E-7T
 Thursday, January 17, 2013,
  
  273   Friday, January 18, 2013, 11:28 Sebastian RaederRFQ empty      stop turbosFriday, January 18, 2013, 11:28: turbos
stopped
  
  284   Tuesday, March 19, 2013, 17:25 Sebastian Raeder      Problems/Solutionsnew turbo installedEdi replaced the faulty turbo pump in the
mass separator section.
Roughing and turbo started
  
  285   Tuesday, March 19, 2013, 19:13 Sebastian Raeder      Problems/Solutions9 Pin connector rewired to match wiring in TM4The 9 Pin connector was rewired in the
ISAC teststand to match the wiring in TM4
The wiring from the connection board
  
  286   Thursday, March 21, 2013, 15:05 Sebastian RaederSiC#28 ITETM4  Done2nd heating of SiC#28 LP-RFQ - short resolved 

    
 20130322_heating.png20130322_massscan_transmission.png20130322_massscan_suppression1.png20130322_suppression2.pnglegs.JPG 
  288   Monday, March 25, 2013, 16:50 Sebastian Raeder      Problems/SolutionsRFQ powersupplies removed - Anode PS still connected to groundThe powersupplies added to the teststand
for operation of the IGLIS source have been
removed from the HV cage as well as the RFQ
  