ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
Text |
|
51
|
Monday, March 05, 2012, 14:41 |
Friedhelm Ames | | | | | | | | vacuum and optics switched off | vacuum and optics at teststand switched
off to allow work on the water cooling system. |
|
52
|
Monday, March 05, 2012, 19:31 |
Friedhelm Ames | | | | | | | Failed | turbo pumps failed | Both turbo pumps at the source box cannot
be started. A fault report has been issued. |
|
56
|
Tuesday, March 06, 2012, 15:51 |
Friedhelm Ames | | | | | | | | turbopumps in mass separator section started | |
|
57
|
Wednesday, March 07, 2012, 09:27 |
Friedhelm Ames | Nb#6 | | | | | | Done | water cooling started | water cooling line valves opened. No response
on vacuum TSG:IG1 3.5e-7 T |
|
59
|
Wednesday, March 07, 2012, 13:48 |
Friedhelm Ames | Nb#6 | | | | | | | high voltage conditioning | High voltage conditioning has been started
by ISAC ops. Einzel lens is unstable below
5 kV., o.k. above this. |
|
60
|
Wednesday, March 07, 2012, 17:44 |
Friedhelm Ames | Nb#6 | | | | | | | ramping up heaters | ramping up heaters has been started by
ISAC ops. |
|
61
|
Thursday, March 08, 2012, 09:14 |
Friedhelm Ames | Nb#6 | | | | | | | continue target heating | continue target heating up to 580 A. Strip
tool for the heating up to 300A from yesyerday
see below |
|
62
|
Thursday, March 08, 2012, 14:08 |
Friedhelm Ames | Nb#6 | | | | | | | heater ramped up | heaters have reached final values TGHT
580 A, TBHT 230 A, some sparking during ramp
up. see strip tool image attached |
|
63
|
Thursday, March 08, 2012, 17:16 |
Friedhelm Ames | Nb#6 | | | | | | | mass scan started | |
|
64
|
Thursday, March 08, 2012, 17:39 |
Friedhelm Ames | | | | | | | Problems/Solutions | TPS:Q2 amd TMS:MB1 failed | TPS:Q2 and TMS:MB1 failed during the scan.
-> restarted. |
|
65
|
Thursday, March 08, 2012, 18:32 |
Friedhelm Ames | | | | | | | | mass scan crashed due to a network error | mass scan crashed due to a network error
will be restarted tomorrow |
|
66
|
Friday, March 09, 2012, 08:53 |
Friedhelm Ames | Nb#6 | | | | | | In progress | mass scan started | mass scan started again. Total current
3.2e-8 A |
|
67
|
Friday, March 09, 2012, 10:56 |
Friedhelm Ames | Nb#6 | | | | | | | scan finished | mass scan is finished and saved see attached. |
|
68
|
Friday, March 09, 2012, 13:30 |
Friedhelm Ames | NB#6 | | | | | | | heater ramping down | Fc0 23 nA
IG1 9.9e-7 T
start automatic heater ramping down |
|
69
|
Friday, March 09, 2012, 17:25 |
Friedhelm Ames | | | | | | | | heaters and HV power supplies off | heaters and HV power supplies have been
switched off
IG1 5.1e-9 T. |
|
70
|
Wednesday, April 11, 2012, 09:30 |
Friedhelm Ames | | | | | | | Failed | TSGRP1 poor vacuum | The backing pressure at TSGRP1 does not
go below 578 mT. Fault report to vacuum. |
|
71
|
Wednesday, April 11, 2012, 09:34 |
Friedhelm Ames | | | | | | | | turbopumps in mass separator section started | turbopumps in mass separator section started
after power outages |
|
95
|
Wednesday, May 16, 2012, 19:55 |
Friedhelm Ames | | | | | | | Problems/Solutions | Hall probe reading wrong | During the mass scan today it was discovered,
that the mass calibration was off. Further
investigation showed, that the Hall probe |
|
117
|
Friday, June 29, 2012, 13:39 |
Friedhelm Ames | | | | | | | | start mass scan | start mass scan to do new mass calibration |
|
118
|
Friday, June 29, 2012, 15:02 |
Friedhelm Ames | | | | | | | | mass scan finished | mass spectrum saved as
plotdump-local-clean.txt_Jun29_12_14-55-43.txt
|
|