  Test-Stand, Page 6 of 53  Not logged in ELOG logo
Entry  Monday, March 05, 2012, 14:41, Friedhelm Ames, , , , , , , , vacuum and optics switched off 

vacuum and optics at teststand switched off to allow work on the water cooling system.

Entry  Monday, March 05, 2012, 19:31, Friedhelm Ames, , , , , , , Failed, turbo pumps failed 

Both turbo pumps at the source box cannot be started. A fault report has been issued.

Entry  Tuesday, March 06, 2012, 15:51, Friedhelm Ames, , , , , , , , turbopumps in mass separator section started 
 
Entry  Wednesday, March 07, 2012, 09:27, Friedhelm Ames, Nb#6, , , , , , Done, water cooling started 

water cooling line valves opened. No response on vacuum TSG:IG1 3.5e-7 T

Entry  Wednesday, March 07, 2012, 13:48, Friedhelm Ames, Nb#6, , , , , , , high voltage conditioning 

High voltage conditioning has been started by ISAC ops. Einzel lens is unstable below 5 kV., o.k. above this.

Entry  Wednesday, March 07, 2012, 17:44, Friedhelm Ames, Nb#6, , , , , , , ramping up heaters 

ramping up heaters has been started by ISAC ops.

Entry  Thursday, March 08, 2012, 09:14, Friedhelm Ames, Nb#6, , , , , , , continue target heating grab.K26109.png

continue target heating up to 580 A. Strip tool for the heating up to 300A from yesyerday see below

Entry  Thursday, March 08, 2012, 14:08, Friedhelm Ames, Nb#6, , , , , , , heater ramped up grab.Z27253.png

heaters have reached final values TGHT 580 A, TBHT 230 A, some sparking during ramp up. see strip tool image attached

Entry  Thursday, March 08, 2012, 17:16, Friedhelm Ames, Nb#6, , , , , , , mass scan started 
 
Entry  Thursday, March 08, 2012, 17:39, Friedhelm Ames, , , , , , , Problems/Solutions, TPS:Q2 amd TMS:MB1 failed 

TPS:Q2 and TMS:MB1 failed during the scan. -> restarted.

Entry  Thursday, March 08, 2012, 18:32, Friedhelm Ames, , , , , , , , mass scan crashed due to a network error 

mass scan crashed due to a network error will be restarted tomorrow

Entry  Friday, March 09, 2012, 08:53, Friedhelm Ames, Nb#6, , , , , , In progress, mass scan started 

mass scan started again. Total current 3.2e-8 A

Entry  Friday, March 09, 2012, 10:56, Friedhelm Ames, Nb#6, , , , , , , scan finished Nb6_mass_spectrum.docx

mass scan is finished and saved see attached.

Entry  Friday, March 09, 2012, 13:30, Friedhelm Ames, NB#6, , , , , , , heater ramping down 

Fc0 23 nA

IG1 9.9e-7 T

start automatic heater ramping down

Entry  Friday, March 09, 2012, 17:25, Friedhelm Ames, , , , , , , , heaters and HV power supplies off 

heaters and HV power supplies have been switched off

IG1 5.1e-9 T.

Entry  Wednesday, April 11, 2012, 09:30, Friedhelm Ames, , , , , , , Failed, TSGRP1 poor vacuum 

The backing pressure at TSGRP1 does not go below 578 mT. Fault report to vacuum.

Entry  Wednesday, April 11, 2012, 09:34, Friedhelm Ames, , , , , , , , turbopumps in mass separator section started 

turbopumps in mass separator section started after power outages

Entry  Wednesday, May 16, 2012, 19:55, Friedhelm Ames, , , , , , , Problems/Solutions, Hall probe reading wrong 

During the mass scan today it was discovered, that the mass calibration was off. Further investigation showed, that the Hall probe readings are a factor of 1.31 lower than during previous measurements. A fault report has been issued to controls.

Entry  Friday, June 29, 2012, 13:39, Friedhelm Ames, , , , , , , , start mass scan 

start mass scan to do new mass calibration

Entry  Friday, June 29, 2012, 15:02, Friedhelm Ames, , , , , , , , mass scan finished mass_spectrum_2012_06_29.PNG

mass spectrum saved as

plotdump-local-clean.txt_Jun29_12_14-55-43.txt