  345   Wednesday, November 20, 2013, 08:57 Anders Mjos      Problems/SolutionsBacking pressure TSG:CG1A and CG1B elevated

 

Anders Mjos wrote:

Pressure around 140 mTorr. The pressure started increasing early November 2nd. Will continue to monitor.

Tuesday, November 12, 2013, 09:51 UPDATE
 Backing pressure further increased to ~ 350 mTorr over the weekend. Vacuum group has been informed and will replace the pump this week.

 

 The backing pump (TSG:RP1) was replaced yesterday by Anthony Ip. Backing pressure is down to 1 mTorr on TSG:CG1A

  346   Wednesday, November 27, 2013, 08:27 Anders Mjos      Problems/SolutionsEPICS whiteout

Since yesterday around 4pm. Due to attempt to use the TMS:ER0 device.

IOC rebooted this morning. Archivers restarted.

  347   Monday, December 02, 2013, 08:36 Anders Mjos      Problems/SolutionsSources archiver started
  348   Monday, December 02, 2013, 15:21 Anders Mjos      Problems/SolutionsXantrex 10V 600A installed and in Cathode Negative mode

By Ray Dube. 

  350   Thursday, December 12, 2013, 09:01 Anders Mjos      Problems/SolutionsVacuum excursion over night

Monday, December 16, 2013, 08:53
Some additional smaller magnitude excursions have been observed since the fist on on Dec. 12th. See attached plot. 

Attachment 1: VacuumExcursion-2013-12-12.png
VacuumExcursion-2013-12-12.png
Attachment 2: VacuumExcursion-2013-12-16.png
VacuumExcursion-2013-12-16.png
  352   Friday, December 20, 2013, 15:46 Anders Mjos      Problems/SolutionsWater switched off for the holidays
  353   Thursday, January 02, 2014, 11:53 Anders Mjos      Problems/SolutionsThe computer will not boot Windows

The computer has been brought over to PC support for diagnostics. 

Hard Drive was found to be corrupted. A new HD will be installed and Windows upgraded to a newer version.


Thursday, January 16, 2014

The PC has gotten a new HD with Windows 8.

Xming and PuTTY installed and configured for access to EPICS controls

  355   Thursday, January 16, 2014, 15:00 Anders Mjos      Problems/SolutionsFlow and temperature meter

Flow and temperature meter previously installed on cooling circuits. See attachment for details.

Typical values at 95 psi in and 10 psi out. Cyclotron off.

Device
Temp
[°C]

Flow
[lpm]

Heat Shield and Mounting Support Plate 25 3.9
Tube Heater 25 6.2
Coils and Extraction Electrode 25 5.0
Target Heater 25 5.5

 

Attachment 1: Vortex_Flow_Meter_Config.docx
  356   Friday, January 24, 2014, 10:49 Anders Mjos      Problems/SolutionsVenting the optics section to investigate Emittance Rig installation

Friday, January 24, 2014, 10:49 : Stopped turbos. Vacuum at 2.5E-7 T 

Friday, January 24, 2014, 12:52: Venting

Finished evaluating emittance rig installation.

Friday, January 24, 2014, 14:25: Roughing.

The Cu-tubing for cooling the Turbo pumps broke off during disassembly. New ferrules could not be located on site and may have to be ordered.

The system will be left under roughing vacuum over the weekend.


Wednesday, January 29, 2014

Cooling for Turbo pumps reconnected.

  357   Wednesday, January 29, 2014, 14:42 Anders Mjos      Problems/SolutionsValved off water to TSG and TMS:MB1

CuLCW will be shut off tomorrow. Valved off water supply to MB1 and TSG to minimize air into the system. Turbos are off.

  358   Thursday, January 30, 2014, 15:38 Anders Mjos      Problems/SolutionsStarting turbos after CuLCW shut off

Anders Mjos wrote:

CuLCW will be shut off tomorrow. Valved off water supply to MB1 and TSG to minimize air into the system. Turbos are off.

Opened up for water flow.

Thursday, January 30, 2014, 15:30: Started turbos

Thursday, January 30, 2014, 15:34: TP2 and TP6 at speed. Vacuum at 2.5E-5 T

Thursday, January 30, 2014, 15:34: TP1B at speed. Vacuum at 1.3E-5 T

Thursday, January 30, 2014, 15:38: TP1A at speed. Vacuum at 1.6E-6 T

  359   Wednesday, February 05, 2014, 11:27 Anders Mjos      Problems/SolutionsEmittance Rig installation

Wednesday, February 05, 2014, 11:27 : Stopped turbos

  • 2x spacers ITD0468 1/8" THK installed to shift the wire scanner screen closer to the wire scanner. (ITD0469 1/16" THK spacers not used).
  • Emittance Rig installed. Manually actuated from out -> in -> out position. No interference observed.
  • Replaced two insulators on wire scanner screens that broke in the installation process. New insulators kindly donated from ISIS.

By Anders and Ayan.

Wednesday, February 05, 2014, 16: Roughing


Thursday, February 06, 2014, 08:42: Turbos started

Thursday, February 06, 2014, 08:50: Turbos at speed. IG6 6.2E-6 T, IG1 1.3 E-6 T

Attachment 1: Spacers_Installed.jpg
Spacers_Installed.jpg
Attachment 2: Emittance_Rig_Inside.jpg
Emittance_Rig_Inside.jpg
Attachment 3: Emittance_Rig_Outside.jpg
Emittance_Rig_Outside.jpg
  361   Friday, March 07, 2014, 11:38 Anders Mjos      Problems/SolutionsTMS:TP2 stopped over night

See fault report 7240


Tuesday, March 11, 2014, 09:04: Stopping TMS:TP6. Vacuum at 9.7E-6 T.


Wednesday, March 12, 2014, 10:22: Venting TMS section for TP2 replacement.

Edi replaced TP2

Wednesday, March 12, 2014, 15:36: Roughing TMS section.

Wednesday, March 12, 2014, 15:45: Starting turbos.

Wednesday, March 12, 2014, 15:49: Turbos at speed. Vacuum at 3.6E-5 T.

Wednesday, March 12, 2014, 15:55: Vacuum at 1.5E-5 T.

  362   Tuesday, March 11, 2014, 09:03 Anders Mjos      Problems/SolutionsLeak on water line for Heat Shield

Tuesday, March 11, 2014, 09:03: Venting to investigate

  366   Friday, March 21, 2014, 14:12 Anders Mjos      Problems/SolutionsElevated backing pressure on ISAC Test Stand TMS:RP2

The performance of the roughing pump has gradually gone down. Notably after the system has been vented. See attached screenshot from the archiver.

E-fault 7258.

 

Attachment 1: TMSCG2_2014-03-21.png
TMSCG2_2014-03-21.png
  372   Wednesday, April 23, 2014, 09:37 Anders Mjos      Problems/SolutionsStarted Sources archiver

The archiver was not running

  375   Thursday, May 08, 2014, 15:09 Anders Mjos      Problems/SolutionsSOURCES archiver reported stopped

 Archiver restarted.

  376   Friday, May 09, 2014, 10:48 Anders Mjos      Problems/SolutionsEPICS white-out e-fault 7380

Monday, May 12, 2014, 10:02: Jane R. power cycled the hardware. EPICS is back up. Sources archiver required a restart.

  378   Thursday, May 15, 2014, 14:58 Anders Mjos      Problems/SolutionsIOC rebooted to recover from white-out.

Restarted archivers.

  379   Tuesday, May 20, 2014, 11:17 Anders Mjos      Problems/SolutionsBurnt off GND connection on Service Cap

The ground connection between B and F (ISK4523D Rev 6) was found burnt off. It will be switched out as per CATHODE BIAS configuration (ISK4563D Rev 3) by Ray D.