ID Date Authordown Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  1032   Thursday, November 28, 2024, 13:47 Isaiah Rabuka         November 28, 2024 1:46PM
Checked in on sample in ATTS.
  
  1034   Tuesday, December 03, 2024, 15:49 Isaiah Rabuka          Tuesday,
December 03, 2024, 15:48
  
  1035   Wednesday, December 04, 2024, 15:43 Isaiah Rabuka          Wednesday,
December 04, 2024, 15:42 Depressurized the
  
  1037   Thursday, December 05, 2024, 14:06 Isaiah Rabuka         Thursday, December 05, 2024, 14:05
Pressurized ATTS with argon, swapped out
samples, and repressurized and heated chamber.
  
  1039   Friday, December 06, 2024, 16:03 Isaiah Rabuka          Friday, December
06, 2024, 16:03 Heated and cooled a sample
  
  1040   Tuesday, December 10, 2024, 14:38 Isaiah Rabuka          Tuesday,
December 10, 2024, 14:38 Depressurized ATTS
  
  14   Wednesday, September 28, 2011, 14:11 Friedhelm AmesSiC#26 ITETM4   gas system checked and pumpedThe gas system has been checked. The variable
valve opens at about 7.55 very fast. Please
be careful when using it. Stepsize for opening
  
  29   Friday, January 20, 2012, 10:37 Friedhelm Ames       vacuum pumps shut offturbo pumps shut off due to work on
cooling water system
  
  30   Tuesday, January 24, 2012, 09:44 Friedhelm Ames       turbo pumps restartedAll turbo pumps have been restarted after
cooling water is back and running.
 
  
  31   Wednesday, February 08, 2012, 17:39 Friedhelm Ames      FailedTSG:TP1B failureBoth turbo pumps at the source box were
found off. TSG:TP1A has been started normally.
TSG:TP1B does not spin up above 3KRPM even
  
  32   Wednesday, February 08, 2012, 18:16 Friedhelm Ames      FailedTSG:TP1B and TSG:TP1A failure


   
        
            
  
  35   Monday, February 27, 2012, 17:39 Friedhelm Ames      In progresstarget and tube heaters ramped upramping up target to 300 A and tube to
270 A
  
  41   Wednesday, February 29, 2012, 09:43 Friedhelm Ames       checking gas inlet valve for FEBIAD    
  42   Wednesday, February 29, 2012, 15:08 Friedhelm Ames       connected Al(CH3)3connected A(CH3)3 instead of He, pumped
line and valve with pump on the high voltage
rack.. Opened regulating valve first response
  
  43   Wednesday, February 29, 2012, 17:22 Friedhelm Ames       mass scan mass scan with valve at 7.2 to let in Al(CH3)3
saved as
plotdump-local-clean.txt_Feb29_12_17-19-20.txt


 grab.BI5978.png 
  44   Wednesday, February 29, 2012, 17:26 Friedhelm Ames       gas inlet valves closed    
  45   Thursday, March 01, 2012, 17:04 Friedhelm Ames       new mass scanbigger mass scan after separator optimization
and with finer step size
 
 grab.S19441.png 
  46   Thursday, March 01, 2012, 17:05 Friedhelm Ames       start heater ramping down    
  47   Thursday, March 01, 2012, 17:09 Friedhelm Ames       new mass scan


   
        
            
  
  48   Thursday, March 01, 2012, 17:10 Friedhelm Ames       start ramping down of heaters    