Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 5 of 53  Not logged in ELOG logo
Entry  Thursday, June 13, 2013, 11:04, Anders Mjos, , , , , , , Problems/Solutions, Viton seals on vacuum chamber doors replaced 

See PO# TR193650 

Entry  Thursday, July 11, 2013, 08:38, Anders Mjos, , , , , , , Problems/Solutions, Bias & EL P/S cleaned 

The power supplies were "de-dusted" yesterday by Ray Dube and team. 

Entry  Friday, July 12, 2013, 15:52, Anders Mjos, , , , , , , Problems/Solutions, TMS:MB1 fuse latched after mass scan 

A flash and "thumb" was observed at the end of the mass scan.

Friday, July 12, 2013, 15:51: Ray Dube had a look inside. After the fuse was reset, the Power Supply could operate again.

A power bump was experienced at about the same time as the MB1 fuse latched.

https://web.accel.triumf.ca/isac_elog/Elog_show_result.pl?inid=172266&style=entry#172266

 

Entry  Tuesday, July 16, 2013, 16:01, Anders Mjos, , , , , , , Problems/Solutions, FEBIAD coil connector insulator fracture Photo_2013-07-16_3_36_45_PM.jpg

The right side of the insulator cracked/fractured either as the bolt was tightened or loosened. 

Entry  Wednesday, July 17, 2013, 12:55, Anders Mjos, , , , , , , Problems/Solutions, Controls are removing dust/cleaning their devices 

Thursday, July 18, 2013, 08:41: Restarting archivers

Entry  Monday, July 22, 2013, 14:08, Anders Mjos, , , , , , , Problems/Solutions, 20V 60A COIL PS installed for FEBIAD Coil Test 

By Ray. Note that controls have not been updated yet.

Entry  Tuesday, August 20, 2013, 08:27, Anders Mjos, , , , , , , Problems/Solutions, TP1B noise - TP1B replacement 

TP1B high frequency noise is coming and going. Power is 22W , current 1.1A (other pumps are 11W and 14W, 0.7A)

Edi from vacuum group notified. He will replace the pump today.

Tuesday, August 20, 2013, 08:40: Turbos off. Vacuum 1.4E-7 T

Tuesday, August 20, 2013, 10:01: Started venting.

Turbo has been replaced by Edi.

Tuesday, August 20, 2013, 16:28: Roughing

Tuesday, August 20, 2013, 16:51: Turbos started.

TP1A timed out. Could not open BV1A and restart due to too high backing pressure at CG1A


Wednesday, August 21, 2013, 08:17: Turbos started. Vacuum 0.043 T

Wednesday, August 21, 2013, 08:25: Turbos at speed. TP1B: 1.2A 28W 30 deg C.

Wednesday, August 21, 2013, 08:27: Vacuum at 5.6 E-6 T

 

Entry  Friday, August 23, 2013, 11:16, Anders Mjos, , , , , , , Problems/Solutions, Possible leak between BV1A, BV1B and PV1 

CG1A is climbing from 0.016 to 0.130 in 30 seconds when isolated.

The leak was confirmed to be between BV1A and PV1 in the bellows. The bellows has been replaced and backing pressure is back to normal values.

Entry  Monday, August 26, 2013, 13:49, Anders Mjos, , , , , , , Problems/Solutions, TP1A time out/fault sometime this weekend 

Monday, August 26, 2013, 14:07: The turbo could be restarted, but it does not sound happy (Dimo was consulted earlier today). The pump is drawing around 4 A. The current draw is fluctuating between 3.5 and 4.2 A at the same time as backing pressure is spiking from 0.015 to 0.045 T

Monday, August 26, 2013, 15:32:: The turbo failed again. Dimo had a quick look. It will have to be replaced. See e-fault: 6953


Wednesday, August 28, 2013, 08:48: Stopping TP1B. Vacuum at 4.8 E-7 T

Wednesday, August 28, 2013, 10:59: Venting

Anthony has replaced the pump. There was no screen on the existing pump. A screen has been installed in front of the turbo.

Wednesday, August 28, 2013, 14:03: started roughing

Wednesday, August 28, 2013, 14:31: Starting turbos

Wednesday, August 28, 2013, 14:41Turbos at speed

Wednesday, August 28, 2013, 14:43: Vacuum at 2.0 E-5 T

Entry  Wednesday, August 28, 2013, 11:28, Anders Mjos, , , , , , , Problems/Solutions, Hall probe controller for MB1 removed 

Jens Lassen provided a new controller for the Hall prove. With the help from Graham from controls it was reconfigured and is operational again. The magnet must likely be calibrated again.

Entry  Monday, September 09, 2013, 09:12, Anders Mjos, , , , , , , Problems/Solutions, Coil power supply back 

Ray D. installed the "standard" 6V 200A FEBIAD COIL P/S on Friday morning.It has not yet been tested as water supply was on.

Entry  Monday, September 09, 2013, 09:14, Anders Mjos, , , , , , , Problems/Solutions, Ground Electrode cleaned Dirty_GE.pdf

Monday, September 16, 2013, 17:04: Cleaned GE. Copper shavings were removed from below the guide pins for the Heat Shield. The shavings were sitting on top of the aluminum support.

Entry  Tuesday, September 17, 2013, 10:06, Anders Mjos, , , , , , , Problems/Solutions, TGHT insulator cracked Photo_2013-09-16_3_53_19_PM.jpg

The coil insulator has been observed to have cracked earlier. 

Entry  Wednesday, September 18, 2013, 14:54, Anders Mjos, , , , , , , Problems/Solutions, Hall probe calibration 2013-09-18_NiOcalibration.png

New calibration of the m/q based on the hall probe after exchanging the controller(MASSOVERQ2). Based on NiO#2-HP-FEBIAD with Ne supplied and ANODE biased to 200V, 30kV Bias.

CONST11 = -16.3929
CONST22 = 0.12481

http://isacwserv.triumf.ca/onlylocal/isactdata/save_restore/masscorr/2013-09-18-09%20NiO%232

Data and results from Gnuplot

"2013-09-18 NiOcalibration.txt"
6.02 -1192 6Li
7.02 -1288 7Li
19.99 -2177 20Ne
21.99 -2284 22Ne
38.96 -3043 40K
40.96 -3118 41K
180.9 -6577 Ta
196.9 -6864 TaO

f(x)=((x+a)**2)*b/30000;
a=35.221;
b=0.129991;
fit f(x) "2013-09-18 NiOcalibration.txt" using 2:1 via a,b;

Final set of parameters Asymptotic Standard Error
======================= ==========================

a = -16.3929 +/- 2.015 (12.29%)
b = 0.12481 +/- 8.448e-005 (0.06769%)


correlation matrix of the fit parameters:

a b
a 1.000
b 0.952 1.000  

Entry  Monday, September 30, 2013, 15:19, Anders Mjos, , , , , , , Problems/Solutions, New purging valves installed on Heat Shield water circuit 

The Heat Shield circuit can now be separately purged for water. Use valves on heat shield circuit to purge the lines for target exchanges from now on.

All paddle wheels have been rotated to allow trapped air to escape the system more easily.

Entry  Thursday, October 03, 2013, 08:43, Anders Mjos, , , , , , , Problems/Solutions, TMS:TP2 tripped off - controller replaced. 

This morning the turbo was found tripped off. 

The controller was replaced by Edi on Friday.


Monday, October 07, 2013, 08:28: Starting Turbo

Monday, October 07, 2013, 08:29: Turbo at speed. Vacuum at 4.4E-7 T

Entry  Thursday, October 03, 2013, 14:15, Anders Mjos, , , , , , , Problems/Solutions, TMS:Q1 and Q6 tripped 
 
Entry  Tuesday, October 22, 2013, 15:20, Rick Maharaj, , , , , , , Problems/Solutions, Target Heater Conductor Block Insulators Replaced Source_Tray_TGHT_and_COIL_insulators_replaced_2013-10.pdf

The Conductor insulating blocks - ITD053C and ITD054C - that secure the target heater and coil conductor blocks were replaced. The existing ones were cracked and fell apart upon removal.

Entry  Tuesday, November 05, 2013, 15:50, Anders Mjos, , , , , , , Problems/Solutions, Backing pressure TSG:CG1A and CG1B elevated Vacuum.png

Pressure around 140 mTorr. The pressure started increasing early November 2nd. Will continue to monitor.

Tuesday, November 12, 2013, 09:51 UPDATE
 Backing pressure further increased to ~ 350 mTorr over the weekend. Vacuum group has been informed and will replace the pump this week.

Entry  Tuesday, November 12, 2013, 12:38, Anders Mjos, , , , , , , Problems/Solutions, Vacuumed desk, on and around the beam line 
 
ELOG V2.9.2-2455