Entry  Thursday, November 28, 2024, 13:47, Isaiah Rabuka, , , , , , , ,  

 November 28, 2024 1:46PM

Checked in on sample in ATTS.

Entry  Tuesday, December 03, 2024, 15:49, Isaiah Rabuka, , , , , , , ,  

  Tuesday, December 03, 2024, 15:48

Switched out pellets in ATTS, brought pressures down to ~10 uTorr, heated and cooled sample.

Entry  Wednesday, December 04, 2024, 15:43, Isaiah Rabuka, , , , , , , ,  

  Wednesday, December 04, 2024, 15:42 Depressurized the ATTS

Entry  Thursday, December 05, 2024, 14:06, Isaiah Rabuka, , , , , , , ,  

 Thursday, December 05, 2024, 14:05 Pressurized ATTS with argon, swapped out samples, and repressurized and heated chamber.

Entry  Friday, December 06, 2024, 16:03, Isaiah Rabuka, , , , , , , ,  

  Friday, December 06, 2024, 16:03 Heated and cooled a sample in the ATTS 3x

Entry  Tuesday, December 10, 2024, 14:38, Isaiah Rabuka, , , , , , , ,  

  Tuesday, December 10, 2024, 14:38 Depressurized ATTS using argon, switched out samples, and repressurized ATTS. Heated new sample to 1000 degrees Celsius.

 

Entry  Wednesday, September 28, 2011, 14:11, Friedhelm Ames, SiC#26, , ITE, TM4, , , , gas system checked and pumped 

The gas system has been checked. The variable valve opens at about 7.55 very fast. Please be careful when using it. Stepsize for opening around this value should be 0.01. Gas lines have been pumped with pump in the high voltage rack. Ne leak was opened to release pressure.

Entry  Friday, January 20, 2012, 10:37, Friedhelm Ames, , , , , , , , vacuum pumps shut off 

turbo pumps shut off due to work on cooling water system

Entry  Tuesday, January 24, 2012, 09:44, Friedhelm Ames, , , , , , , , turbo pumps restarted 

All turbo pumps have been restarted after cooling water is back and running.

 

Entry  Wednesday, February 08, 2012, 17:39, Friedhelm Ames, , , , , , , Failed, TSG:TP1B failure 

Both turbo pumps at the source box were found off. TSG:TP1A has been started normally. TSG:TP1B does not spin up above 3KRPM even after several attemps. A fault report has been send to vacuum group.

 

    Reply  Wednesday, February 08, 2012, 18:16, Friedhelm Ames, , , , , , , Failed, TSG:TP1B and TSG:TP1A failure  

Friedhelm Ames wrote:

Both turbo pumps at the source box were found off. TSG:TP1A has been started normally. TSG:TP1B does not spin up above 3KRPM even after several attemps. A fault report has been send to vacuum group.

 

 after about 30 minutes running at normal speed TP1A failed as well. Both pumps will be kept off over night.

Entry  Monday, February 27, 2012, 17:39, Friedhelm Ames, , , , , , , In progress, target and tube heaters ramped up 

ramping up target to 300 A and tube to 270 A

Entry  Wednesday, February 29, 2012, 09:43, Friedhelm Ames, , , , , , , , checking gas inlet valve for FEBIAD 
 
Entry  Wednesday, February 29, 2012, 15:08, Friedhelm Ames, , , , , , , , connected Al(CH3)3 

connected A(CH3)3 instead of He, pumped line and valve with pump on the high voltage rack.. Opened regulating valve first response at mass 27 with valve set point at 7.0.

Entry  Wednesday, February 29, 2012, 17:22, Friedhelm Ames, , , , , , , , mass scan  grab.BI5978.png

mass scan with valve at 7.2 to let in Al(CH3)3 saved as

plotdump-local-clean.txt_Feb29_12_17-19-20.txt


Entry  Wednesday, February 29, 2012, 17:26, Friedhelm Ames, , , , , , , , gas inlet valves closed 
 
Entry  Thursday, March 01, 2012, 17:04, Friedhelm Ames, , , , , , , , new mass scan grab.S19441.png

bigger mass scan after separator optimization and with finer step size

 

Entry  Thursday, March 01, 2012, 17:05, Friedhelm Ames, , , , , , , , start heater ramping down 
 
    Reply  Thursday, March 01, 2012, 17:09, Friedhelm Ames, , , , , , , , new mass scan 

Friedhelm Ames wrote:

bigger mass scan after separator optimization and with finer step size

 

 total curren on Fc0 183 nA gas valves SV2/5 open leak valve at 7.2 SV1 closed

Entry  Thursday, March 01, 2012, 17:10, Friedhelm Ames, , , , , , , , start ramping down of heaters 
 