Monday, December 16, 2024, 3:34 Target loaded in test stand. Confirmed correct connection to mass marker power supply through multipin. Bottom left pin (5 PS - ) connected to grounded side of the filament, top right pin (2, PS +) connected to top end of filament.
Tuesday, December 17, 2024, 09:30 Turbo pumps on
Tuesday, December 17, 2024, 16:21 water cooling on. No effect on vacuum. Vacuum stable at 1.18e-6T
Tuesday, December 17, 2024, 16:41 ramping TGHT TBHT at 1A/30s
Wednesday, December 18, 2024, 10:00 slowly increasing BIAS/EE/EZL to 30/2.5/13 kV
Wednesday, December 18, 2024, 11:40 BIAS EE EZL at 30 2.5 13 kV. 1 spark at 28kV, and there was a downward spike in the TGHT current when bias was at 28.5 kV
Wednesday, December 18, 2024, 11:41 FC0 reading 1.6E-10 A. quite low for total beam, but this is likely due to this target being hot so many times.
Wednesday, December 18, 2024, 11:51 wire scans taken (RPM0)
Wednesday, December 18, 2024, 11:54 FC) extracted for mass scan - mass scan beginning now . Background record appears to be functioning well, although it is high. comparatively to old tests. It could be that those old tests were recording irregularly low background, given the temporary solution that was implemented.
Wednesday, December 18, 2024, 12:13 it seems that a spark took down many optics elements. Going to allow conditioning at 30kV for a while before restarting . - optics elements down due to pressure sensor TMS:IG6 timing out. Vacuum group notified. Will likely bypass the interlock temporarily if it cannot be fixed fast. This should get a more permanent solution as it has failed a number of times before.
Wednesday, December 18, 2024, 13:06 sparks are occurring on average approximately once every 10 minutes. they don't seem to be tripping of any supplies or optics (after IG6). but this spark frequency is significantly higher than observed on other targets lately.
Wednesday, December 18, 2024, 13:24 restarting Mass scan with IG6 interlock forced by. scan name - 2024-12-18_13-47 SISP2N mmOFF.txt
Wednesday, December 18, 2024, 13:51 put FC0 back in, preparing to heat up mass marker. will plan to ramp to 3A to match previous MM tests. also, no sparks in the past 40 minutes, it appears they have subsided. additionally, IG6 has been fixed by vacuum group
Wednesday, December 18, 2024, 14:15 mass marker power supply is not connecting. When attempting to write to its IP address it times out. Had to drop the HV in order to investigate. Have enlisted controls group to aid as it appears to be connected and should be functional.
Wednesday, December 18, 2024, 14:30 had to reset the computer connection to the network 192.168.5. by unplugging and plugging in the usb ethernet connection at computer. situation resolved.
Wednesday, December 18, 2024, 14:40 HV back up and now increasing the mass marker current from 0A to 3A, at 0A, FC0 current is 1.4e-10, very close to previously recorded FC0 mm0A value.
Wednesday, December 18, 2024, 14:56 with mm current at 3.0A, requiring 6V, FC0 current is 2.1e-10 A.
Wednesday, December 18, 2024, 14:58 withdrawing FC0 to take mass scan
Wednesday, December 18, 2024, 15:25 mass scan complete: filename 2024-12-18 15-23 SISP2N mmON.txt
Wednesday, December 18, 2024, 15:27 further increasing mm current to 4.0A. FC0 current increasing noticeably. waiting for plateau. FC0 at 6.6e-10A. wire scans taken
Wednesday, December 18, 2024, 15:39 new mass scan: 2024-12-18 15-53 SISP2N mmON 4A.txt
Wednesday, December 18, 2024, 15:52 mm power supply turned off. 0A.
Wednesday, December 18, 2024, 15:53 rescan of high mass region. still a residual indium mass peak present. will scan again after cooling more.
Wednesday, December 18, 2024, 16:10 mass scan captured that shows the indium peak almost masked in background
Given that the indium peak for 3A was significantly lower than with a regular SIS source cup, i recommend that this target is heated up with the regular source cup again to compare.
Wednesday, December 18, 2024, 16:11 dropping HV EE EZL to 0V
Wednesday, December 18, 2024, 16:13 cooling target to 0/0A at 1A/30s
|
Tuesday, March 11, 2025, 14:36 Roughing. Target installed.
Tuesday, March 11, 2025, 15:06 TP1B turned on.
Tuesday, March 11, 2025, 15:10 TP1A turned on.
Tuesday, March 11, 2025, 15:18 IG1 Turned on 6.25e-05T
Tuesday, March 11, 2025, 16:39 Turned water on. Started autoramping TGHT/TBHT to 580/230A at 1A/30s
Wednesday, March 12, 2025, 11:03 slowly ramping BIAS/EE/EZL to 30/2.5/13 kV
Wednesday, March 12, 2025, 14:00 no beam seen out. It seems that FC0 is working though. Investigation needed
Wednesday, March 12, 2025, 16:00 decreased HV to 0 to investigate. See report (to be released and attached) for more information
Friday, March 14, 2025, 09:20 : increasing TGHT TBHT to 100A at 1A/30s, then to 580/230A at 1.7A/10s.
Friday, March 14, 2025, 11:31 increasing BIAS/EE/EZL to 30/2.5/13 kV
Friday, March 14, 2025, 12:57 it appears that everything is stable. FC0 = 3.6e-10 A (VQSX). beginning mass scan. mass scan saved as '2025-03-14-13-30 MM a 0A.txt'
Friday, March 14, 2025, 14:12 mass separator focused at mass 115 to visualize indium.
Friday, March 14, 2025, 14:12 increasing MM current, following mass peak.
__ Current __ FC6 output __
0A 1.9e-11
1A 2e-11
2A 2.22-11
3A 4.6e-11
4A 5.9e-10
5A 3.6e-9
6A 8.6e-9
Friday, March 14, 2025, 14:39 conducting mass scan. '2025-03-14-15-20 MM b 6A.txt' after the scan, it was noticed that the mm current had failed at some point during the scan.
Friday, March 14, 2025, 15:27 conducting mass scan with 0A mm current. saved as 2025-03-14-15-55 MM c 0A.txt
Friday, March 14, 2025, 15:55 ramping down HV
Friday, March 14, 2025, 15:56 ramping down TGHT TBHT to 0 (1A/30s) to assess and correct mm OL issue
Tuesday, March 18, 2025, 14:49 After bringing down vacuum to open test stand, the mass marker connection has been investigated. Two multipin connections have become disconnected, seems to be at a soldered junction.
Tuesday, March 18, 2025, 14:51 MM has been moved to different pins for operation. multipin will be fixed at a later date. Now test stand has been vacuumed down and TGHT TBHT brought to 580 230 for measurement.
Tuesday, March 18, 2025, 14:51 MM temperatures:
MM current _____ temperature:
0A ___ 195.8°C
1A ___ 198.1
2A ___ 223.7°C
3A ___ 282.1°C
4A ___ 370.1°C
5A ___ 486.4°C
6A ___ 631.6°C
Tuesday, March 18, 2025, 16:17 cooling TGHT TBHT at -1A/30s to 0A
Wednesday, March 19, 2025, 16:30 : Mass marker replaced - new ceramic oven and sleeve, new reservoir with Indium - 0.102g. Same transfer tube and target assembly
Wednesday, March 19, 2025, 16:45: Install complete, roughing vacuum
Wednesday, March 19, 2025, 17:07 Turbopumps on
Thursday, March 20, 2025, 10:00 : Water cooling on. Increasing TGHT TBHT to 580 230 at 1A/30s.
Thursday, March 20, 2025, 12:00 : at ~200A 200A, increased heating rate to 1A/10s
Thursday, March 20, 2025, 13:45 increasing HV BIAS/EE/EZL to 30/2.5/13 kV
Thursday, March 20, 2025, 14:32 at HV now, stable. Beginning mass scan.
Thursday, March 20, 2025, 15:15 magnet positioned at mass 115
__ Current __ FC6 output __
0A 1.17e-11
1A 1.23e-11
2A 2.60e-11
3A 9.2e-11
4A 2.8e-10
5A 5.5e-10
6A 1.4e-9
Thursday, March 20, 2025, 15:57 running mass scan - 2025-03-20_16-26 mm e 6A
Thursday, March 20, 2025, 17:00 run mass scan - 2025-03-20_16-58 mm f 0A.txt
Thursday, March 20, 2025, 17:29 mm has cooled more, repeating mass scan. 2025-03-20_17-51 mm g 0A.txt
Thursday, March 20, 2025, 17:58 BIAS/EE/EZL down to 0V . left hot for mm temperature evaluation tomorrow
Friday, March 21, 2025, 11:08 Temperature testing
Current ___ Temperature
0A 184.5
1A 187.2
2A 208.3
3A 268.7
4A 374.1
5A 419.2
6A 495.8
Friday, March 21, 2025, 12:09 cooling TGHT TBHT at 1.7A/10s to make Faraday cage accessible for controls work
decreased cooling rate to 1A/20s for final 100A. at 14:00, test stand was opened for controls work.
Wednesday, March 26, 2025, 10:08 Turbo pumps switched off for venting and changing the mass marker reservoir
Wednesday, March 26, 2025, 18:01 Chamber opened, MMR replaced with MMR3, roughed, now turbopumps on.
Thursday, March 27, 2025, 12:38 TGHT TBHT brought up to 580 230 at 1A/30s for 100A and then 1.7A/10s for the rest. now increasing HV BIAS/EE/EZL to 30/2.5/13 kV
Thursday, March 27, 2025, 13:58 at high voltage, beginning mass scan. (h)
Thursday, March 27, 2025, 14:37 Magnet at 115, measuring beam output with increases of MM current
current ___ FC6 output
0A 8.2e-11
1A 8.2e-11
2A 8.6e-11
3A 1e-10
4A 1.88e-10
5A 5e-10
6A 8.7e-10
Thursday, March 27, 2025, 15:26 beginning mass scan at MM 6A. --- MM Current failed at the beginning of the mass scan. data still collected - indium peak lower than expected due to gradual cooling. mass scan saved (i) 2025-03-27_15-32 mm i 6A-0A.txt
Thursday, March 27, 2025, 15:33 cooled 0A mass scan beginning - (j) 2025-03-27_16-13 mm j 0A.txt
Thursday, March 27, 2025, 16:32 decreasing HV to 0
Friday, March 28, 2025, 09:13 spinning down turbo pumps to vent system. Must *begin* to repair/replace the multipin connection. - will affix twisted pair to two appropriate channels for IGLIS AC
Tuesday, April 08, 2025, 12:26 spinning down turbo pumps
Wednesday, April 09, 2025, 15:36 Twisted pair wire shielded, routed and crimped for iglis and high(er) current purposes. multipin channels 8 and 9.
roughing.
Wednesday, April 09, 2025, 16:26 turbo pumps on
Thursday, April 10, 2025, 09:43 beginning heating - TGHT TBHT to 580 230 at 1A/30s
Thursday, April 10, 2025, 10:41 at 100A100A. increasing ramp rate to 1.7A/30s
Thursday, April 10, 2025, 11:39 increasing HV BIAS/EE/EZL to 30/2.5/13 kV
Thursday, April 10, 2025, 13:12 - mass scan - 0A mm. - - 2025-04-10_13-46 mm k 0A.txt
Thursday, April 10, 2025, 13:50 magnet on 115 u - turning on MMR current.
current ___ FC6 output
0A 1.56e-11
1A 1.5e-11
2A 1.81e-11
3A 2.1e-11
4A 3.1e-11
5A 5.2e-11
6A 1.75e-10
7A 1.08e-9
8A 5.3e-9
Thursday, April 10, 2025, 14:49 mass scan at 8A. Frequent sparking, ~1/min but doesn't appear to be affecting anything. no affect on optics or power supplies. appears to be inside TS chamber as well. mass scan saved (l 8A) 2025-04-10_15-04 mm l 8A.txt
Thursday, April 10, 2025, 14:50 MMR current decreased to 6A. waiting to cool to begin mass scan. sparks have stopped .
Thursday, April 10, 2025, 15:08 beginning mass scan. (m 6A) saved. 2025-04-10_15-34 mm m 8A.txt
Thursday, April 10, 2025, 15:34 MMR current 0A. repeat mass scan after cooled. (n 0A) saved. 2025-04-10_16-10 mm n 0A.txt
Thursday, April 10, 2025, 16:02 voltages to 0 for temperature testing
Current ___ Temperature
0A 205
1A 205.5
2A 227
3A 268
4A 327
5A 391
6A 462
7A 546
8A 645.6
Thursday, April 10, 2025, 16:51 cooling TGHT TBHT at 1A/30s
Friday, April 11, 2025, 09:00 spinning down turbo pumps to vent chamber. must replace source cup (p2n style --> old style)
Friday, April 11, 2025, 09:56 opened VV1 to begin venting the chamber.
Friday, April 11, 2025, 15:39 P2N source cup removed, old source cup installed for repeat test. roughing chamber now.
Friday, April 11, 2025, 16:05 turbo pumps on
Monday, April 14, 2025, 09:43 Water cooling on. TGHT TBHT ramping up at 1A/30s to 580A/230A
Monday, April 14, 2025, 12:57 increasing HV BIAS/EE/EZL to 30/2.5/13 kV
Monday, April 14, 2025, 15:27 FC0 signal very low. running mass scan - (o - 0A MMR), 2025-04-14_15-42 mm o 0A.txt
Monday, April 14, 2025, 15:45 magnet set to 115u
increasing mmr current.
current ___ FC6 output
0A 2.4e-12
1A 4e-12
2A 3.9e-12
3A 4.8e-12
4A 3e-12
5A 4e-12
6A 4e-12
7A 4e-12
8A 4e-12
Monday, April 14, 2025, 16:06 no indium out was seen here due to increase of mmr current.
running mass scan again at 8A
MMR power supply tripped after 20u, had to reset power supply trip, quickly ramped down HV, reset, ramped back up.
mass scan running at 8A MMR. appears that no beam is coming from this target... spark occured halfway through the run that tripped the MMR power supply as well as the beam line vac gauge IG6 -> leads to interlock trip on many optics. Restored as quickly as possible. however, beam was far past 115, where indium had been expected saved as 2025-04-14_16-42 mm p 8A.txt
Monday, April 14, 2025, 16:44 dropping HV to 0V and cooling TGHT TBHT to 0A/0A for target examination
Monday, April 14, 2025, 16:53 This trip has caused some sort of communication issue with the TGHT, This caused TGHT to be 'stuck' at 580A. I had to eventually cut power to the supply and have power cycled it. have not been able to restore power to it remotely
Fixed TGHT. Was able reset it locally after opening the cage.
Tuesday, April 15, 2025, 08:06 Turbo pumps off to vent, remove target and examine.
Tuesday, April 15, 2025, 08:43 VV1 open
Tuesday, April 15, 2025, 11:22 Target opened, taken apart, examined. Appears that the MMR transfer line had become dislodged from the target block, preventing transfer. Fixed this, reassembled, put back in TS.
Tuesday, April 15, 2025, 11:23 roughing.
Tuesday, April 15, 2025, 12:00 turbo pumps on.
Tuesday, April 15, 2025, 13:23 water cooling on. no effect on vacuum
Wednesday, April 16, 2025, 09:37 ramping TGHT TBHT
Wednesday, April 16, 2025, 12:46 increasing HV BIAS/EE/EZL to 30/2.5/13 kV
Wednesday, April 16, 2025, 14:47 HV BIAS /EZL has been sparking occasionally, so increase has been slow
Wednesday, April 16, 2025, 15:05 mass scanning - 0A MMR.
Wednesday, April 16, 2025, 15:07 spark external to TS (audible) tripped IG1 and shut down all power supplies. error thrown by TGHT as before.. cannot reset remotely. must discuss this error with controls.
Wednesday, April 16, 2025, 15:17 reset all and ramped up quick. running mass scan. 0A MMR (q 0A) 2025-04-16_15-42 mm q 0A.txt
Wednesday, April 16, 2025, 15:43 heating MMR
current ___ FC6 output
0 4.4e-12
1 3e-12
2 4e-12
3 5e-12
4 6e-12
5 8e-12
6 4.8e-11
7 1.5e-10
8 9.1e-10
Wednesday, April 16, 2025, 16:31 mass scan 8A (r) 2025-04-16_16-31 mm r 8A.txt
Wednesday, April 16, 2025, 16:32 dropping HV to check temperatures
Current ___ temperature (note. takes ~ 6 min to cool from max to min)
0A 197
1A 206
2A 218
3A 220
4A 300
5A 395
6A 500
7A 608
8A 735
Wednesday, April 16, 2025, 17:01 cooling TGHT TBHT at 1A/10s
Thursday, April 17, 2025, 08:37 turbo pumps off, spinning down
Thursday, April 17, 2025, 11:15 venting |